Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.6 LAdmitted-Finance | -55.01% | ₹12.6 L | L1 | Admitted-Finance |
| 2 | L2₹20.0 LAdmitted-Finance | -28.33% | ₹20.0 L | L2 | Admitted-Finance |
| 3 | L3₹22.1 LAdmitted-Finance | -21.00% | ₹22.1 L | L3 | Admitted-Finance |
| 4 | L4₹22.4 LAdmitted-Finance | -20.00% | ₹22.4 L | L4 | Admitted-Finance |
| 5 | L5₹26.3 LAdmitted-Finance | -5.99% | ₹26.3 L | L5 | Admitted-Finance |
Tender Value
₹28.0 L
EMD Value
₹55,919
Closing Date
3 Jun 2026, 3:00 pmClosed
EXECUTIVE ENGINEER
SMD-5 DDA ASIAD VILLAGE SHAHPURJAT
Conversion of water bodies.SH-Dredging, Desilting, Cleaning of KishanGarh Water body based on water conservation drive to be inaugurated by Honble LG
2026_DDA_910648_1
13/EE/SMD-5/DDA/2026-27
Open Tender
Civil Works
45 days
SMD-5 DDA ASIAD VILLAGE SHAHPURJAT
Please refer Tender documents.
10 documents required · 10 mandatory
₹0
₹55,919
6 Jun 2026
28 May 2026
3 Jun 2026
28 May 2026
3 Jun 2026
28 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : 7.11 Cement mortar 1:6 (1 cement : 6 coarse sand) | - | cum | 7,311.25 | - | BI01010001010000000000000515BI0100001113 |
| 2 | Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) at window sills, ceiling level and the like. 7.21 Cement mortar 1:6 (1 cement : 6 coarse sand) | 1 | cum | 9,275.45 | ₹9,266.17 | BI01010001010000000000000515BI0100001114 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :(a) 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | 7,878.5 | - | BI01010001010000000000000515BI0100001115 |
| 4 | Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) : a) Flush/ Ruled pointing | - | sqm | 385.4 | - | BI01010001010000000000000515BI0100001116 |
| 5 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.(a)In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 1 | kg | 172.6 | ₹172.43 | BI01010001010000000000000515BI0100001117 |
| 6 | Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like. | - | kilo liter | 231.05 | - | BI01010001010000000000000515BI0100001118 |
| 7 | Excavation and removal of sludge/ manuare by mechanical transport means excluding 30cm in depth ,1.5m in width as well as 10 sqm on plan including disposal of sludge lead upto 50mtr and lift complete as per direction of engineer -in-charge | 1 | Cum | 176.52 | ₹176.34 | BI01010001010000000000000515BI0100001119 |
| 8 | Disposal of sludge/manure by mechanical transport i/c loading & unloading lead upto 5.0 km complete as per direction of engineer in charge . | 1 | cum | 210.42 | ₹210.21 | BI01010001010000000000000515BI0100001120 |
| 9 | Supplying and stacking at site.a)Good earth | - | cum | 775.5 | - | BI01010001010000000000000515BI0100001121 |
| 10 | Extra levelling & neatly dressing of disposed soil completely as directed by Engineer-in-charge. | - | cum | 93.05 | - | BI01010001010000000000000515BI0100001122 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.63 MB
13.pdf
Tender Documents • 1.94 MB
BOQ_957074.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid