Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹14.2 LAdmitted-Finance | +4.50% | ₹14.2 L | L1 | Admitted-Finance |
| 2 | L2₹14.4 L+₹20,417.27 (1.44%)Admitted-Finance | +6.00% | ₹14.4 L+₹20,417.27 (1.44%) | L2 | Admitted-Finance |
Tender Value
₹13.6 L
EMD Value
₹27,223
Closing Date
27 Mar 2026, 3:00 pmClosed
Executive Engineer
Executive Engineer, CD, APWD, Diglipur
A R and M o rural roads under Sub Division No-I, CD, APWD, Diglipur during 2025-26. Sw - Repair of Pothole of rural road from Shibpur to Kalipur from Kaliamma house at Shibpur to Ammal Bairagi house at Kalipur 1.946 km. Shibpur to Kalipur 1.946 km
2026_APWD_22451_1
NIT No. 143/EE/CD/APWD/DP/2025-26
Open Tender
Civil Works - Roads
Percentage
30 days
Shibpur to Kalipur, Diglipur
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹27,223
27 Mar 2026
20 Mar 2026
27 Mar 2026
20 Mar 2026
27 Mar 2026
23 Mar 2026
20 Mar 2026 - 23 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Providing and laying Bitumen Penetration Macadam with hard stone aggregate of quality, size and grading as specified, with bitumen of suitable penetration grade, including required key aggregate as specified, spreading coarse aggregate with the help of self propelled/ tipper tail mounted aggregate spreader and applying bitumen by a pressure distributor and then spreading key aggregate with the help of aggregate spreader complete, including consolidation with road roller of minimum 8 to 10 tonne capacity to achieve specified values of compaction and surface accuracy: | |||||
| 1.01 | For 75 mm compacted thickness in two layers using stone aggregate of size 63-41 mm graded @ 0.90 cum per 10 sqm key aggregate of size 20.0 mm graded @ 0.18 cum per 10 sqm. With paving asphalt grade VG - 10 @ 68 kg/10 sqm. | - | sqm | - | - |
| 2Providing and applying tack coat using hot straight run bitumen of grade VG - 10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications : | |||||
| 2.01 | On bituminous surface @ 0.50 Kg / sqm | - | sqm | - | - |
| 32 cm premix carpet surfacing with 1.8 cum and 0.90 cum of stone chippings of 13.2 mm size and 11.2 mm size respectively per 100 sqm and 52 kg and 56 kg of hot bitumen per cum of stone chippings of 13.2 mm and 11.2 mm size respectively, including a tack coat with hot straight run bitumen, including consolidation with road roller of 6 to 9 tonne capacity etc. complete (tack coat to be paid for separately). | |||||
| 3.01 | With paving Asphalt grade VG - 30 with no solvent | - | sqm | - | - |
| 4Providing and laying seal coat of premixed fine aggregate ( passing 2.36 mm and retained on 180 micron sieve) with bitumen using 128 kg of bitumen of grade VG - 10 bitumen per cum of fine aggregate and 0.60 cum of fine aggregate per 100 sqm of road surface, including rolling and finishing with road roller all complete. | |||||
| 5Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material within all lifts and lead upto 1km (by mechanical means). | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.30 MB
TenderDocumentNIT143.pdf
Tender Documents • 5.25 MB
BOQ_23777.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .