Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAccepted-AOC SALBAGAN ROAD BENACHITY DURGAPUR BARDHAMAN BARDHAMAN 713213 WEST BENGAL INDIA | DURGAPUR | BARDHAMAN | WEST BENGAL | 713213 | L1 | Accepted-AOC TC Recommendation | |
| 2 | L2₹2.4 L+₹6,460 (2.75%)Rejected-Finance | L2 | Rejected-Finance TC Recommendation | |
| 3 | L3₹2.4 L+₹10,273 (4.38%)Rejected-Finance DVC MORE PANDAVESWAR BURDWAN BARDDHAMAN 713346 WEST BENGAL INDIA | PANDAVESWAR | BARDDHAMAN | WEST BENGAL | 713346 | L3 | Rejected-Finance TC Recommendation |
Tender Value
₹2.3 L
EMD Value
₹3,000
Closing Date
19 Aug 2024, 6:00 pmClosed
General Manager
Office of The General Manager Bankola Area, PIN-713363
Routing Cleaning, Dry Inspection, Hydraulic Test and Fitting With Commissioning of Vertical Boiler No. WBL 10996 of Khandra Collier, NKJ Unit, Under Bankola Area.
2024_ECL_314780_1
ECL/GM/BA/E TENDER/24-25/EnM/134 Dt 09.08.2024
Open Tender
Electrical and Maintenance Works
Item Rate
25 days
Khandra Colliery
Please refer to NIT document
5 documents required · 5 mandatory
₹3,000
23 Jun 2025
9 Aug 2024
20 Aug 2024
9 Aug 2024
19 Aug 2024
9 Aug 2024
9 Aug 2024 - 13 Aug 2024
Amount
Item Description/ Heading
Cleaning of all the ash from the bottom of the boiler.
Cleaning of all the scale and rust from the boller shale plate at fire side and washing the same.
Cleaning of all the scale of the boiler shell plate by scraping, removing of all the foreign materials and washing the same at water side.
Dismantling of all the valves and fire bar and all the side caps and depositing the same at colliery store.
Conducting of dry inspection of the boiler by the Dy. Director Boiler, Durgapur
To build up the pitted portion of boiler shell crown by arc welding and grind smooth as mark out during inspection
To build up the mud hole and cross tube doors and grind smooth to maintain spigot clearance.
Changing of defective fuse plug, thread making of shell crown plate etc Overhauling laping and necessary repair of all the valves with supply of 2 set Bush for CG cock
Repair and servicing of Angel type S.V, Single post safety valve Blow dowen valve, Feed check valve, Gauge Column cock
Repair of fire door ring by group cutting, welding and dressed smooth as described by the inspector.
Welding of pitted portion of boiler shell plate below the all inspection door about 300 mm x 400 mm area.
Supply and fitting of gauge glass tube.
Supply with fitting of 3/8 seamless syphon pipe with cock
Supply with fitting of 6" dial pressure gauge 0-300 lbs
Hydraulic test of Vertical Boiler with blanking and water filling and conducting the inspection
Complete fitting of Vertical boiler with all fittings
Fabrication of fire bar with gas electrode etc
Supply of nut bolts tap joint steam joint etc
Commissioning of boiler including firing of the boiler with 48 hrs observation
Total impact of GST for the purpose of CTC
GT ENTERPRISE
SABIR CONSTRUCTION
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .