| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAdmitted-Finance | ₹1.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.1 Cr+₹4.8 L (4.58%)Admitted-Finance | ₹1.1 Cr+₹4.8 L (4.58%) | L2 | Admitted-Finance |
| 3 | L3₹1.1 Cr+₹9.2 L (8.76%)Admitted-Finance | ₹1.1 Cr+₹9.2 L (8.76%) | L3 | Admitted-Finance |
| 4 | L4₹1.2 Cr+₹10.9 L (10.4%)Admitted-Finance | ₹1.2 Cr+₹10.9 L (10.4%) | L4 | Admitted-Finance |
| 5 | L5₹1.3 Cr+₹26.4 L (25.3%)Admitted-Finance | ₹1.3 Cr+₹26.4 L (25.3%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s P.N.Dewalkar Construction L3 | M/s. A.R. Construction L1 | M/S M.S. WALIA AND BROS. GONDIA L5 | M/s AMRUT CONSTRUCTION L2 | Wasmatkar consultant and contractor L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | BITUMINOUS MACADAM: Proving and laying bituminous macadam using crushed aggregates of Grading 1, premixed with bituminous binder, transported to site with VTS, laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction for 50 mm compacted thickness with 3.30% using VG-30 Bitumen. | 332.32 | Cum | 7,052 ₹23,43,520.64 | 4,099 ₹13,62,179.68 Lowest | 10,000 ₹33,23,200 | 7,110 ₹23,62,795.2 | 6,149 ₹20,43,435.68 |
| 2.00 | Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen with sprayer on Dry / Hungry B.T. surface 3 kg/10 sqm. with VG-10 bitumen. | 6,646.4 | Sqm | 43 ₹2,85,795.2 | 12 ₹79,756.8 Lowest | 28 ₹1,86,099.2 | 14 ₹93,049.6 | 18 ₹1,19,635.2 |
| 3.00 | BITUMINOUS CONCRETE: - Providing and laying bituminous concrete using crushed aggregates of grading 1, premixed with bituminous binder @ 5.20 per cent by weight of total mix and filler, transported to site with VTS, laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction for 30 mm compacted thickness with specified grade of Bitumen, Excluding prime / tack coat using VG-30 Bitumen grade -- using Batch mix type hot mix plant/Drum Mix plant, Sensor Paver, Vibratory roller with Stone Dust filler. | 796.87 | Cum | 9,300 ₹74,10,891 Lowest | 10,615 ₹84,58,775.05 | 10,800 ₹86,06,196 | 9,900 ₹78,89,013 | 10,999 ₹87,64,773.13 |
| 4.00 | Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen set footed in bitumen boller on B.T. surface 2.5 kg/10 sqm. with VG-10 bitumen. | 26,562.25 | Sqm | 40 ₹10,62,490 | 12 ₹3,18,747 Lowest | 28 ₹7,43,743 | 13 ₹3,45,309.25 | 17 ₹4,51,558.25 |
| 5.00 | Providing laying, spreading and compacting hard murum having PI greater than 6, including spreading in uniform layers on a prepared surface and compacting with Static roller having weight 8 to 10 MT including necessary artificial watering all materials, labour, machinery, guarding, barracating complete with all leads and lifts of all materials etc. complete. | 321.3 | Cum | 800 ₹2,57,040 | 700 ₹2,24,910 | 700 ₹2,24,910 | 725 ₹2,32,942.5 | 479 ₹1,53,902.7 Lowest |
Tender Value
₹1.7 Cr
EMD Value
₹1.7 L
Closing Date
7 Dec 2022, 5:00 pmClosed
E. E. N.H.Dn Nagpur
Civil line nagpur
Maintenance by B.T.work to km 110.000 to 111.700 and 113.350 to 116.900 and 143.700 to 146.700 and 152.500 to 156.850 of NILAJPHATA PAUNI
2022_MoRTH_722820_1
NIT-12/EENH/NGP/2022-23
Open Tender
Civil Works - Roads
Item Rate
60 days
Nilajphata Bhandara
Maintenance by B.T.work to km 110.000 to 111.700 and 113.350 to 116.900 and 143.700 to 146.700 and 152.500 to 156.850 of NILAJPHATA PAUNI
7 documents required · 7 mandatory
₹5,000
Yes
Pay online in Bharatkosh
₹1.7 L
Yes
SE N H Circle nagpur
5 Jan 2023
11 Nov 2022
8 Dec 2022
11 Nov 2022
7 Dec 2022
24 Nov 2022
22 Nov 2022
Amount
BITUMINOUS MACADAM: Proving and laying bituminous macadam using crushed aggregates of Grading 1, premixed with bituminous binder, transported to site with VTS, laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction for 50 mm compacted thickness with 3.30% using VG-30 Bitumen.
Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen with sprayer on Dry / Hungry B.T. surface 3 kg/10 sqm. with VG-10 bitumen.
BITUMINOUS CONCRETE: - Providing and laying bituminous concrete using crushed aggregates of grading 1, premixed with bituminous binder @ 5.20 per cent by weight of total mix and filler, transported to site with VTS, laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction for 30 mm compacted thickness with specified grade of Bitumen, Excluding prime / tack coat using VG-30 Bitumen grade -- using Batch mix type hot mix plant/Drum Mix plant, Sensor Paver, Vibratory roller with Stone Dust filler.
Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen set footed in bitumen boller on B.T. surface 2.5 kg/10 sqm. with VG-10 bitumen.
Providing laying, spreading and compacting hard murum having PI greater than 6, including spreading in uniform layers on a prepared surface and compacting with Static roller having weight 8 to 10 MT including necessary artificial watering all materials, labour, machinery, guarding, barracating complete with all leads and lifts of all materials etc. complete.
M/s AMRUT CONSTRUCTION
M/s P.N.Dewalkar Construction
Wasmatkar consultant and contractor
M/S M.S. WALIA AND BROS. GONDIA
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.43 MB
SBDI.pdf
Tender Documents • 2.03 MB
SBDII.pdf
Tender Documents • 2.50 MB
Bharatkosh.pdf
Additional Documents • 0.08 MB
BOQ_760234.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .