Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 LAccepted-AOC | ₹9.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹10.6 L+₹70,387.39 (7.10%)Rejected-Finance | ₹10.6 L+₹70,387.39 (7.10%) | L2 | Rejected-Finance L2 |
| 3 | L3₹10.6 L+₹71,488.92 (7.21%)Rejected-Finance NEW COLONY BILPUR FATEHGANJ EAST BAREILLY | BAREILLY | BAREILLY | UTTAR PRADESH | ₹10.6 L+₹71,488.92 (7.21%) | L3 | Rejected-Finance L3 |
| 4 | L4₹10.9 L+₹99,027.02 (9.99%)Rejected-Finance | ₹10.9 L+₹99,027.02 (9.99%) | L4 | Rejected-Finance L4 |
| 5 | L5₹11.0 L+₹1.1 L (11.0%)Rejected-Finance | ₹11.0 L+₹1.1 L (11.0%) | L5 | Rejected-Finance L5 |
Tender Value
₹11.0 L
EMD Value
₹22,040
Closing Date
15 Jun 2026, 12:00 pmClosed
EE
VIKAS BHAWAN VARANASI
Gram sabha dilawalpur me shri ramesh singh (mastar) ji ke ghar bagal me nahar par puliya nirman karya
2026_REDUP_1139652_6
12 DATE 02-04-2026
Open Tender
Civil Works
Percentage
90 days
EE RED VARANASI
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹22,040
Yes
7 Sept 2026
14 May 2026
15 Jun 2026
14 May 2026
15 Jun 2026
14 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation in ordinary soil including lift up or 1.50m and lead up to 30m and including lilling, watering and ramming excavated earth in to trenches or in to the space between the structure and sides of foundation SI No. 251 | 0.8 | cum | - | - |
| 2 | Providing and Laying CC 1:3:6 with cement, Coarse sand, brick ballast (53-22.4) mm size including all cost of materials. T&P and Lab our etc SI. No. 280 | 1 | cum | - | - |
| 3 | M-150 brick work in 1:3 cement and sand of 1.25 fineness modulous mortar in foundation and plinth including supply of all material, labour and tools and plants. ect. required for proper completion of work.SI NO-307 | - | cum | - | - |
| 4 | M-150 brick work in 1:3 cement and sand of 1.25 fineness modulous mortar in foundation and plinth including supply of all material, labour and tools and plants. ect. required for proper completion of work.SI NO-307 As in item 302 to 307 above but in super structure including necessary cutting and moulding of bricks required and also including honey comb brick work, thickness of walls more than one brick and for extra lab our to above SINO-307+309 | - | cum | - | - |
| 5 | Providing and laying R.C.C. slab (1:1:5:3) with cement, coarse sand and stone grit (25-10)mm size including all cost of materials T&P and lab our etc SI No. 284b | 1 | cum | - | - |
| 6 | P/L Cement concreate Bed block & Wearing Coat 1:2:4 in slab all cost of materials. T&P and Lab our etc SI No. 279 a | 1 | cum | - | - |
| 7 | Providing Cutting, Bending, Binding, Placing of reinforcement including all cost of material T&P and labour etc SI No 504 | 1 | Qtl | - | - |
| 8 | Struck Deep pointing in 1:*2 cm, including cost of all materials and lab ours T&P etc SI No. 574 | 1 | M2 | - | - |
| 9 | Supplying and Fixing Drainage Pipe 110 mm i/c 12.5% cp | - | RM | 0.6 | - |
| 10 | Class M-150 Brick Ballast 40mm gauge i/c 12.5% CP | 1 | cum | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.01 MB
sbd.pdf
Tender Documents • 2.01 MB
BOQ_2127907.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .