Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹3.7 L+₹28,299.92 (8.39%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹4.7 L+₹1.3 L (39.4%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹4.8 L+₹1.4 L (42.3%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5 L
EMD Value
₹15,000
Closing Date
21 Sept 2026, 6:00 pmClosed
Office of the Executive Engineer REW Anantnag
Office of the Executive Engineer REW Anantnag
CO DEVELOPMENT OF PARK NEAR JINAZ GAH QUARRY STONE HALSIDER A BLOCK VERINAG
2026_RDPR_324543_11
ENIT108of2026-27
Open Tender
Civil Works
Percentage
30 days
Anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Office of the Executive Engineer REW Anantnag
₹15,000
24 Sept 2026
14 Sept 2026
22 Sept 2026
14 Sept 2026
21 Sept 2026
14 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and
ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed All kinds of soil | 15.3 | Cum | 479.3 | ₹7,333.29 |
| 2 | Providing and laying of stone soling including ramming with all carriages upto worksite complete job.(Plums) | 25.4 | Cum | 900 | ₹22,860 |
| 3 | CEMENT CONCRETE (CAST-IN-SITU)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 41.5 | Cum | 5,733.6 | ₹2,37,944.4 |
| 4FORM WORK Centering and shuttering including strutting, propping etc. and removal of form for: | |||||
| 4.1 | Foundations, footings, bases of columns etc. for mass concrete | 136.97 | Sqm | 286.35 | ₹39,221.36 |
| 5 | Excavating supplying & filling of local earth (incld Royality) by MT lead upto 5Kms incld ramming & Watering of earth in layers not exceeding 20 cm in rolling with Power roller of 8 tonne | 558.29 | cum | 281 | ₹1,56,879.49 |
| 6carriage of materials by MT | |||||
| 6.1 | sand and avg lead of 35 kms by mt | 44 | cum | 540 | ₹23,760 |
| 7 | Hiring of Survey Consultant for Carrying out Detailed Survey with electronic Total Station for recording of detailed contour plan , x sextiions complete job | 1 | LS | 11,000 | ₹11,000 |
| 8 | CIB including photographs | 1 | nos | 1,000 | ₹1,000 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_1094892.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .