Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.1 LAccepted-AOC | ₹5.1 L | 1 | Accepted-AOC Lowest |
| 2 | 2₹6.4 L+₹1.2 L (23.8%)Rejected-AOC | ₹6.4 L+₹1.2 L (23.8%) | 2 | Rejected-AOC Higher |
| Sl No | Description | Qty | Unit | MAHADEV BUILDERS L1 | THE BD GROUP CO-OPERATIVE L C SOCIETY LIMITED PREM NAGAR L2 |
|---|---|---|---|---|---|
| 1.00NS Item | |||||
| 1.10 | Desilting of sewerage manholes of all depths and sizes by deploying mechanical means including complete removal of accumulated silt/sludge/grit/stones/plastics and other foreign materials from inside the manholes.
(UPTO 8FEET DEEP) The work shall include:-
1. Complete desilting and cleaning of manhole chambers, benching, invert, and side walls up to required depth to restore proper flow conditions.
2.Lifting of silt and sludge by any means, suction machine, buckets, cranes, or manual assistance wherever required, including loading into transport vehicles.
3.Transportation and safe disposal of removed silt and debris to approved dumping sites as per directions of Engineer-in-Charge, including all leads, lifts, loading, unloading, and tipping charges.
4.Dewatering of manholes, if required, using pumps, including diversion of flow and maintenance of dry working conditions during execution.
5.Providing all necessary labour, machinery, tools, tackles, fuel, safety equipment, barricading, warning signboards, traffic management, and lighting arrangements to ensure safe execution of work.
6.Adoption of all safety measures, including gas detection, ventilation, protective gear, harnesses, and compliance with CPHEEO / MOHUA / local safety guidelines.
7.Final washing and flushing of manholes after desilting to ensure proper cleanliness and free flow of sewage. The rate shall include all materials, labour, machinery, transportation, disposal, safety arrangements, leads, lifts, and incidentals complete, as directed by the Engineer-in-Charge | 525 | Nos | 839.33 ₹4,40,648.25 Lowest | 948 ₹4,97,700 |
| 1.20 | Desilting of sewerage manholes of all depths and sizes
by deploying mechanical means including complete
removal of accumulated silt/sludge/grit/stones/plastics
and other foreign materials from inside the manholes.
(Depth 08Feet to 15feet ) The work shall include:-
1. Complete desilting and cleaning of manhole
chambers, benching, invert, and side walls up to
required depth to restore proper flow conditions.
2.Lifting of silt and sludge by any means, suction
machine, buckets, cranes, or manual assistance wherever
required, including loading into transport vehicles.
3.Transportation and safe disposal of removed silt and
debris to approved dumping sites as per directions of
Engineer-in-Charge, including all leads, lifts, loading,
unloading, and tipping charges.
4.Dewatering of manholes, if required, using pumps,
including diversion of flow and maintenance of dry
working conditions during execution.
5.Providing all necessary labour, machinery, tools,
tackles, fuel, safety equipment, barricading, warning
signboards, traffic management, and lighting
arrangements to ensure safe execution of work.
6.Adoption of all safety measures, including gas
detection, ventilation, protective gear, harnesses, and
compliance with CPHEEO / MOHUA / local safety
guidelines.
7.Final washing and flushing of manholes after desilting
to ensure proper cleanliness and free flow of sewage.
The rate shall include all materials, labour, machinery,
transportation, disposal, safety arrangements, leads,
lifts, and incidentals complete, as directed by the
Engineer-in-Charge. | 145 | Nos | 839.33 ₹1,21,702.85 Lowest | 948 ₹1,37,460 |
Tender Value
₹4.9 L
EMD Value
₹9,780
Closing Date
3 Aug 2026, 3:00 pmClosed
SURYA KANT
Bhiwani PHED No. 1
(Recall) Desilting of sewerage manholes by Mechanical Means
2026_HRY_536241_1
20265A020616 B450 4E40 BBAD 50A3F27E6AEB553PUH
Open Tender
Civil Works
Works
30 days
Bhiwani
(Recall) AMtc Sewerage Scheme Bhiwani Town Desilting of sewerage manholes by Mechanical Means in Bhiwani Town and all other works contingent thereto Under the Section of Sh Pankaj Kumar JE
2 documents required · 2 mandatory
₹500
₹9,780
Yes
14 Aug 2026
23 Jul 2026
3 Aug 2026
23 Jul 2026
3 Aug 2026
23 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1NS Item | |||||
| 1.1 | Desilting of sewerage manholes of all depths and sizes by deploying mechanical means including complete removal of accumulated silt/sludge/grit/stones/plastics and other foreign materials from inside the manholes.
(UPTO 8FEET DEEP) The work shall include:-
1. Complete desilting and cleaning of manhole chambers, benching, invert, and side walls up to required depth to restore proper flow conditions.
2.Lifting of silt and sludge by any means, suction machine, buckets, cranes, or manual assistance wherever required, including loading into transport vehicles.
3.Transportation and safe disposal of removed silt and debris to approved dumping sites as per directions of Engineer-in-Charge, including all leads, lifts, loading, unloading, and tipping charges.
4.Dewatering of manholes, if required, using pumps, including diversion of flow and maintenance of dry working conditions during execution.
5.Providing all necessary labour, machinery, tools, tackles, fuel, safety equipment, barricading, warning signboards, traffic management, and lighting arrangements to ensure safe execution of work.
6.Adoption of all safety measures, including gas detection, ventilation, protective gear, harnesses, and compliance with CPHEEO / MOHUA / local safety guidelines.
7.Final washing and flushing of manholes after desilting to ensure proper cleanliness and free flow of sewage. The rate shall include all materials, labour, machinery, transportation, disposal, safety arrangements, leads, lifts, and incidentals complete, as directed by the Engineer-in-Charge | 525 | Nos | - | - |
| 1.2 | Desilting of sewerage manholes of all depths and sizes
by deploying mechanical means including complete
removal of accumulated silt/sludge/grit/stones/plastics
and other foreign materials from inside the manholes.
(Depth 08Feet to 15feet ) The work shall include:-
1. Complete desilting and cleaning of manhole
chambers, benching, invert, and side walls up to
required depth to restore proper flow conditions.
2.Lifting of silt and sludge by any means, suction
machine, buckets, cranes, or manual assistance wherever
required, including loading into transport vehicles.
3.Transportation and safe disposal of removed silt and
debris to approved dumping sites as per directions of
Engineer-in-Charge, including all leads, lifts, loading,
unloading, and tipping charges.
4.Dewatering of manholes, if required, using pumps,
including diversion of flow and maintenance of dry
working conditions during execution.
5.Providing all necessary labour, machinery, tools,
tackles, fuel, safety equipment, barricading, warning
signboards, traffic management, and lighting
arrangements to ensure safe execution of work.
6.Adoption of all safety measures, including gas
detection, ventilation, protective gear, harnesses, and
compliance with CPHEEO / MOHUA / local safety
guidelines.
7.Final washing and flushing of manholes after desilting
to ensure proper cleanliness and free flow of sewage.
The rate shall include all materials, labour, machinery,
transportation, disposal, safety arrangements, leads,
lifts, and incidentals complete, as directed by the
Engineer-in-Charge. | 145 | Nos | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
BOQ_615352.xls
BOQ • 0.23 MB
AD0170825.pdf
Additional Documents • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .