Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28,000Admitted-Fee/PreQual/Technical/Finance | ₹28,000 | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹39,235Admitted-Fee/PreQual/Technical/Finance | ₹39,235 | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | Elumalai Contractor L1 | SRI MANI ENGINEERING CONTRACTORS L2 |
|---|---|---|---|---|---|
| 1.10 | Labour Contract For Dorr foam chamber, Flash tank partial damaged portion and Dorr bottom compartment cone portion Renewal Work
1. Dismantling of damaged and weaken portion in Dorr foam chamber, Flash tank partial damaged portion and Dorr bottom compartment cone portion only then and it will be lead to scrap yard through weighed.
2. Newly fabricated and Erected as exiting model with necessary proper supporting approximately weight of vapour line 4.5 MT.
3. Inner Welding joints to be done properly and leak proof to be shown.
4. Necessary connections are to be done as per the existing. | 1 | Rate per Ton | 28,000 ₹28,000 Lowest | 33,250 ₹39,235 |
Tender Value
Refer Docs
Closing Date
2 Jul 2026, 2:00 pmClosed
Administrator
Tiruttani Co-op. Sugar Mills Ltd, Thiruvalangadu
Labour Contract For Dorr foam chamber, Flash tank partial damaged portion and Dorr bottom compartment cone portion Renewal Work
2026_TNCSF_680245_1
TCSM/P1/661/26/BAC-ENG
Open Tender
Miscellaneous Works
Works
15 days
Tiruttani Co-op. Sugar Mills Ltd, Thiruvalangadu
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
Exempted
3 Jul 2026
10 Jun 2026
3 Jul 2026
10 Jun 2026
2 Jul 2026
10 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.1 | Labour Contract For Dorr foam chamber, Flash tank partial damaged portion and Dorr bottom compartment cone portion Renewal Work
1. Dismantling of damaged and weaken portion in Dorr foam chamber, Flash tank partial damaged portion and Dorr bottom compartment cone portion only then and it will be lead to scrap yard through weighed.
2. Newly fabricated and Erected as exiting model with necessary proper supporting approximately weight of vapour line 4.5 MT.
3. Inner Welding joints to be done properly and leak proof to be shown.
4. Necessary connections are to be done as per the existing. | 1 | Rate per Ton | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.76 MB
tenderdoc.pdf
Tender Documents • 0.28 MB
BOQ_817436.xls
BOQ • 0.28 MB
extn1.pdf
PDF • 0.97 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].