Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.3 LAccepted-Finance | ₹6.3 L | L1 | Accepted-Finance Being L1 |
| 2 | L2₹6.3 LAccepted-Finance | ₹6.3 L | L2 | Accepted-Finance Being L2 |
Tender Value
₹6.8 L
EMD Value
₹13,577
Closing Date
23 Apr 2026, 3:00 pmClosed
Executive Engineer
EE CD APWD Kamorta
AR and RO Non residential building under Sub Division No III CD APWD Kamorta during 2025 2026 SW Construction of CC drain behind labour Barrack near Filter bed unit Kamorta
2026_APWD_22649_1
49/NIT/DB/CD/KMT/2025-26
Open Tender
Construction Works
45 days
Kamorta
Please refer to tender document
8 documents required · 8 mandatory
₹0
₹13,577
30 Apr 2026
9 Apr 2026
23 Apr 2026
9 Apr 2026
23 Apr 2026
9 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | |||||
| 1.1 | All kinds of soil. | 27 | cum | - | - |
| 2Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | |||||
| 2.1 | 1:4:8 (1 Cement : 4 coarse sand (zone-Ill) derived from natural sources: 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 5.3 | cum | - | - |
| 2.2 | 1:2:4 (1 Cement : 2 coarse sand (zone-Ill) derived from natural sources : 4 graded stone aggregate 40 mm nominal size derived from natural sources) | 20 | cum | - | - |
| 3Centering and shuttering including strutting, propping etc. and removal of form work for: | |||||
| 3.1 | Foundations, footings, bases for columns | 102 | sqm | - | - |
| 412 mm cement plaster of mix: | |||||
| 4.1 | 1:4(1 cement: 4 fine sand) | 60 | sqm | - | - |
| 5Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
edoc.pdf
Tender Documents • 7.33 MB
Instructions-to-bidders.pdf
Other Documents • 0.33 MB
BOQ_24000.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid