| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 LAdmitted-Fee/PreQual/Technical/Finance | ₹5.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹5.9 LAdmitted-Fee/PreQual/Technical/Finance | ₹5.9 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | Jayaprakash L1 | M/S.RIYA ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling the Existing Reinforced cement Concrete including cost and conveyance of all materials and labour charges etc complete. | 10.45 | M3 | 43,890 ₹51,790.2 Lowest | 47,025 ₹55,489.5 |
| 2.00 | Dismantling the Existing Plain cement Concrete including cost and conveyance of all materials and labour charges etc complete. | 4.8 | M3 | 2,328 ₹2,747.04 Lowest | 2,880 ₹3,398.4 |
| 3.00 | Desilting of sand and silt under water (SS20 B ) Earth work excavation and depositing on bank with initial lead and lift etc complete PWD SOR 2025-26 . | 43.2 | M3 | 7,300.8 ₹8,614.94 Lowest | 7,300.8 ₹8,614.94 Lowest |
| 4.00 | Supplying and filling in foundation and basement with filling crusher stone dust in layers of not more than 15cm.thick well rammed watered and compacted etc., complete complying with standard specification. | 7.2 | M3 | 2,044.8 ₹2,412.86 Lowest | 2,044.8 ₹2,412.86 Lowest |
| 5.00 | Plain cement concrete 1:4:8 mix using 40 mm HBG ISS metal including cost and conveyance of all materials and including all labour cahrges etc comlete | 7.2 | M3 | 39,600 ₹46,728 Lowest | 39,600 ₹46,728 Lowest |
| 6.00 | Plain cement concrete 1:2:4mix using 20 mm HBG ISS metal including cost and conveyance of all materials and including all labour cahrges etc comlete | 6 | M3 | 43,200 ₹50,976 Lowest | 45,000 ₹53,100 |
| 7.00 | Centering for soffits of CC slabs of plane surface like lintels, beams, etc., including strutting 3m high using mild steel sheets of size 90cm x 60cm x and BG 10 stiffened with MS angles of size 25mm x 25mm x 3mm laid over silver oak joists of size 10cm x 6.5 cm spaced at about 90 cm c/c and supported by consurina props of 10 cm to 13cm dia spaced of 75cm c/c complying with standard specifications and as directed by the departmentsl officers etc., complete | 48 | M2 | 22,896 ₹27,017.28 Lowest | 22,896 ₹27,017.28 Lowest |
| 8.00 | Plastering in CM 1;5-12mm thick including cost and conveyance of all materials and including all labour charges etc complete | 72 | M2 | 46,152 ₹54,459.36 Lowest | 46,152 ₹54,459.36 Lowest |
| 9.00 | Supply and Fixing of Kadapha Slab including cost and conveyance of all materials and including all labour charges etc complete | 81.5 | M2 | 22,820 ₹26,927.6 Lowest | 22,820 ₹26,927.6 Lowest |
| 10.00 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors, 12mm dia for main reinforcement and 10mm dia for distribution reinforcement. | 640 | Kg | 61,440 ₹72,499.2 Lowest | 61,440 ₹72,499.2 Lowest |
Tender Value
₹5.8 L
EMD Value
₹5,800
Closing Date
30 Jul 2026, 3:00 pmClosed
The Commissioner Tambaram Corporation
Muthurangan Street West Tambaram
Construction of SWD at Ramasamy Padaiyachi Street at ward no 45 in Tambaram City Municipal Corporation
2026_DMA_685018_3
006/2026/E2/Z-5
Open Tender
Civil Works
Works
Zone 5
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,800
30 Jul 2026
10 Jul 2026
30 Jul 2026
10 Jul 2026
30 Jul 2026
10 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | GST % |
|---|---|---|---|---|---|---|
| 1 | Dismantling the Existing Reinforced cement Concrete including cost and conveyance of all materials and labour charges etc complete. | 10.45 | M3 | - | - | 18% |
| 2 | Dismantling the Existing Plain cement Concrete including cost and conveyance of all materials and labour charges etc complete. | 4.8 | M3 | - | - | 18% |
| 3 | Desilting of sand and silt under water (SS20 B ) Earth work excavation and depositing on bank with initial lead and lift etc complete PWD SOR 2025-26 . | 43.2 | M3 | - | - | 18% |
| 4 | Supplying and filling in foundation and basement with filling crusher stone dust in layers of not more than 15cm.thick well rammed watered and compacted etc., complete complying with standard specification. | 7.2 | M3 | - | - | 18% |
| 5 | Plain cement concrete 1:4:8 mix using 40 mm HBG ISS metal including cost and conveyance of all materials and including all labour cahrges etc comlete | 7.2 | M3 | - | - | 18% |
| 6 | Plain cement concrete 1:2:4mix using 20 mm HBG ISS metal including cost and conveyance of all materials and including all labour cahrges etc comlete | 6 | M3 | - | - | 18% |
| 7 | Centering for soffits of CC slabs of plane surface like lintels, beams, etc., including strutting 3m high using mild steel sheets of size 90cm x 60cm x and BG 10 stiffened with MS angles of size 25mm x 25mm x 3mm laid over silver oak joists of size 10cm x 6.5 cm spaced at about 90 cm c/c and supported by consurina props of 10 cm to 13cm dia spaced of 75cm c/c complying with standard specifications and as directed by the departmentsl officers etc., complete | 48 | M2 | - | - | 18% |
| 8 | Plastering in CM 1;5-12mm thick including cost and conveyance of all materials and including all labour charges etc complete | 72 | M2 | - | - | 18% |
| 9 | Supply and Fixing of Kadapha Slab including cost and conveyance of all materials and including all labour charges etc complete | 81.5 | M2 | - | - | 18% |
| 10 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors, 12mm dia for main reinforcement and 10mm dia for distribution reinforcement. | 640 | Kg | - | - | 18% |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
BOQ_823496.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].