Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 LAdmitted-Finance | ₹7.0 L | L1 | Admitted-Finance |
| 2 | Rejected-Technical | - | - | Rejected-Technical Disqualified on account of Not meeting Bidding Capacity as per NIT condition |
| Sl No | Description | Qty | Unit | K.MADHUKAR L1 |
|---|---|---|---|---|
| 1.00 | Sweeping and Cleaning the road surfaces including water table, road junction & pavement on both sides of roads inside FBTR & RML complex area two times in a Month and when and where ever required including collecting upto 200m and stacking swept material for disposal upto 4km and as directed by the Engineer-in-Charge. Note: 1. Every time cleaning area shall be measured for payment 2. The contractor shall engage minimum 2 numbers of workers daily as directed by the Engineer-in-Charge. Failure to deploy the minimum number of labour will attract recovery with the minimum wages for every default of labour as mentioned in specification. 3. The rate should also include sweeping tools etc. 4. The contractor shall supply the necessary PPE to the workers. 5. The rate shall include the cost of hire charges of lorry and labour for transporting of sweeping materials to the dumping yard. | 5,68,500 | Sq.m. | 0.55 ₹3.1 L |
| 2.00 | Sweeping and cleaning the water table area inside FBTR & RML complex area using necessary tools and other accessories, collecting the swept materials and stacking at places shown with in a lead of 500m etc. complete and as directed by the Engineer-in-Charge. Note: 1) Total quantity based on twelve cycle per year of entire area in FBTR complex, i.e one cycle per month & to be maintained for month. 2) The contractor shall supply the PPE to the labours and they should wear the PPE during their working hours. | 12,700 | Sq.m. | 0.45 ₹5,715 |
| 3.00 | Sweeping and cleaning the Drain cover slab, Plate form, pathway (paver block / cement concrete area) surface inside FBTR & RML complex area using broom including broomstick, tools and other accessories, collecting the swept materials and stacking at places shown with in a lead of 500 m etc, complete and as directed by the Engineer-in-charge. Note:1.Total quantity based on twelve cycle per year of entire area in FBTR complex, i.e one cycle per month & to be maintained for month. 2).The contractor shall supply the PPE to the labours and they should wear the PPE during their working hours. | 99,300 | Sq.m. | 0.15 ₹14,895 |
| 4.00Cleaning the storm water drain when and wherever required including collection of all unwanted leaves, small plants, silt and other unwanted debris etc. upto initial lead 200m and stacking for disposal upto 5km lead at place specified by Engineer, all complete as directed by the Engineer-in-Charge. | ||||
| 4.01 | Below 500mm width with out cover slab. | 5,500 | Metres | 4 ₹22,000 |
| 4.02 | Below 500mm width with cover slab | 600 | Metres | 4 ₹2,400 |
| 4.03 | Width above 500mm upto 1000mm wide with out cover slab | 2,500 | Metres | 2.6 ₹6,500 |
| 4.04 | Width above 500mm upto 1000mm wide with cover slab | 1,500 | Metres | 5 ₹7,500 |
| 5.00Cutting and trimming the branches of the trees of below mentioned girth size of maximum height up to 15.00 metre height from ground level with handling the cut out portion secondary stems, trunk, roots etc., of the Banyan Tree / Rain tree / assorted tree, including required labour, tools , hand saw, arc and disposing using mechanical transport of all the cut branches to dumping yard with in a lead of 5.0km including the lorry/tipper and the labours for loading and unloading the branches of tree, leaves etc., and as directed by the Engineer-in-charge. Note: This item operates only for rooted trees | ||||
| 5.01 | Below 200mm girth | 50 | Nos. | 125 ₹6,250 |
Tender Value
₹7.5 L
EMD Value
₹14,920
Closing Date
13 May 2026, 11:30 amClosed
Chief Engineer, CEG
Room No. 222, CDO Building, Indira Gandhi Centre for Atomic Research, Kalpakkam - 603102.
Cleaning of asphaltic road surface, storm water drains, concrete slab area in FBTR complex at IGCAR, Kalpakkam for the year 2026-2027.
2026_IGCAR_906443_1
CEG/IGC/2183/2026
Open Tender
Civil Works
365 days
Kalpakkam
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹14,920
16 Jun 2026
29 Apr 2026
14 May 2026
30 Apr 2026
13 May 2026
1 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Sweeping and Cleaning the road surfaces including water table, road junction & pavement on both sides of roads inside FBTR & RML complex area two times in a Month and when and where ever required including collecting upto 200m and stacking swept material for disposal upto 4km and as directed by the Engineer-in-Charge. Note: 1. Every time cleaning area shall be measured for payment 2. The contractor shall engage minimum 2 numbers of workers daily as directed by the Engineer-in-Charge. Failure to deploy the minimum number of labour will attract recovery with the minimum wages for every default of labour as mentioned in specification. 3. The rate should also include sweeping tools etc. 4. The contractor shall supply the necessary PPE to the workers. 5. The rate shall include the cost of hire charges of lorry and labour for transporting of sweeping materials to the dumping yard. | 5,68,500 | Sq.m. | - | - |
| 2 | Sweeping and cleaning the water table area inside FBTR & RML complex area using necessary tools and other accessories, collecting the swept materials and stacking at places shown with in a lead of 500m etc. complete and as directed by the Engineer-in-Charge. Note: 1) Total quantity based on twelve cycle per year of entire area in FBTR complex, i.e one cycle per month & to be maintained for month. 2) The contractor shall supply the PPE to the labours and they should wear the PPE during their working hours. | 12,700 | Sq.m. | - | - |
| 3 | Sweeping and cleaning the Drain cover slab, Plate form, pathway (paver block / cement concrete area) surface inside FBTR & RML complex area using broom including broomstick, tools and other accessories, collecting the swept materials and stacking at places shown with in a lead of 500 m etc, complete and as directed by the Engineer-in-charge. Note:1.Total quantity based on twelve cycle per year of entire area in FBTR complex, i.e one cycle per month & to be maintained for month. 2).The contractor shall supply the PPE to the labours and they should wear the PPE during their working hours. | 99,300 | Sq.m. | - | - |
| 4Cleaning the storm water drain when and wherever required including collection of all unwanted leaves, small plants, silt and other unwanted debris etc. upto initial lead 200m and stacking for disposal upto 5km lead at place specified by Engineer, all complete as directed by the Engineer-in-Charge. | |||||
| 4.01 | Below 500mm width with out cover slab. | 5,500 | Metres | - | - |
| 4.02 | Below 500mm width with cover slab | 600 | Metres | - | - |
| 4.03 | Width above 500mm upto 1000mm wide with out cover slab | 2,500 | Metres | - | - |
| 4.04 | Width above 500mm upto 1000mm wide with cover slab | 1,500 | Metres | - | - |
| 5Cutting and trimming the branches of the trees of below mentioned girth size of maximum height up to 15.00 metre height from ground level with handling the cut out portion secondary stems, trunk, roots etc., of the Banyan Tree / Rain tree / assorted tree, including required labour, tools , hand saw, arc and disposing using mechanical transport of all the cut branches to dumping yard with in a lead of 5.0km including the lorry/tipper and the labours for loading and unloading the branches of tree, leaves etc., and as directed by the Engineer-in-charge. Note: This item operates only for rooted trees | |||||
| 5.01 | Below 200mm girth | 50 | Nos. | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.47 MB
2183technicalbid.pdf
Tender Documents • 2.10 MB
2183Undertakingsandformoftender.pdf
Tender Documents • 0.22 MB
2183FormsACDFGHforfillinganduploading.xls
Tender Documents • 0.08 MB
BOQ_953100.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid