Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹95,794.73Admitted-Finance | -0.50% | ₹95,794.73 | L1 | Admitted-Finance |
| 2 | L2₹98,201.63+₹2,406.90 (2.51%)Admitted-Finance | +2.00% | ₹98,201.63+₹2,406.90 (2.51%) | L2 | Admitted-Finance |
| 3 | L3₹1.0 L+₹5,295.19 (5.53%)Admitted-Finance | +5.00% | ₹1.0 L+₹5,295.19 (5.53%) | L3 | Admitted-Finance |
Tender Value
₹96,000
EMD Value
₹1,920
Closing Date
17 Aug 2026, 6:00 pmClosed
EXECUTIVE ENGINEER REW JAMMU
EXECUTIVE ENGINEER REW JAMMU
Repair of Drain and Iron grating along with allied work near H/O Nasser Rather Pyt Narwal Bala Block Satwari For The Year 2026-27 under PRI Capex Budget
2026_RDPR_318943_2
e-NIT No. 315 REWJ of 2026-27 dated 01-08-2026
Open Tender
Civil Works
Percentage
30 days
EXECUTIVE ENGINEER REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹1,920
14 Sept 2026
1 Aug 2026
18 Aug 2026
1 Aug 2026
17 Aug 2026
1 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | labour engaged for removing of old damaged mulba | 5 | no | 553 | ₹2,765 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and
ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: | 19.82 | cum | 479 | ₹9,493.78 |
| 3 | Providing and laying in position of cement concrete of specified grade excluding the cost of centring and shuttering - all work upto plinth level. 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregates 40mm nominal size) | 2.47 | cum | 4,826.5 | ₹11,921.46 |
| 4 | Providing and laying in position of cement concrete of specified grade excluding the cost of centring and shuttering - all work upto plinth level. 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregates 40mm nominal size) | 7.5 | cum | 5,733.6 | ₹43,002 |
| 5 | Providing and laying cement concrete flooring in 1:2:4 mix | 13.94 | sqm | 510 | ₹7,109.4 |
| 6 | Structural steel work in built up sections, trusses and framed work,
including cutting, hoisting, fixing in position and applying a priming coat of
approved steel primer all complete. | 70 | kg | 138.2 | ₹9,674 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work ,for: Suspended floor, roof,landing etc | 32.52 | sqm | 286.3 | ₹9,310.48 |
| 8 | Providing and fixing of sign board of size including writing and painting all complete | 1 | No | 3,000 | ₹3,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.61 MB
BOQ_1053879.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .