Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.3 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹6.3 L+₹2,146.63 (0.34%)Admitted-Finance 310 3RD FLOOR CITY CENTRE SANSAR CHAND ROAD JAIPUR RAJASTHAN 302001 | JAIPUR | RAJASTHAN | 302001 | L2 | Admitted-Finance |
Tender Value
₹2 Cr
EMD Value
₹4 L
Closing Date
4 Aug 2026, 6:00 pmClosed
SE PHED CIRCLE DISTT JAIPUR
SE PHED CIRCLE DISTT JAIPUR
NIT12 ARC fo const and comm of Tube Well of 150 mmdia, supply and installation of Submersible P sets, Panels, Cables and other allied works including comm and testing of tube well well under Jurisdiction of PHED Division Jobner with 24 months DLP
2026_PHCJA_577819_5
NIT 08-15/26-27 SE PHED CIRCLE JPR
Open Tender
Civil Works - Water Works
Percentage
365 days
SE PHED CIRCLE DISTT JAIPUR
Please refer Tender documents.
3 documents required · 3 mandatory
₹1 L
EE PHED DIV JOBNER JAIPUR/MD RISL
₹4 L
Yes
24 Sept 2026
27 Jul 2026
5 Aug 2026
27 Jul 2026
4 Aug 2026
27 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of tube well from ground level & up to 100 mtr depth to accommodate housing and assembly pipe of following sizes in all type of alluvium strata unconsolidated formation such as pebbles, boulders etc. by percussion/rotary drilling method as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications, with gravel as per IS:4097-1967 and it's packing as per IS: 2800 (Part I & II) 1979 as amended up to date (the work includes the cost of gravel & it's primary packing and packing during development, lowering of housing & strainer assembly pipes with supply and wrapping of coir-rope, wherever necessary for arresting fine sand particles and development work, but excluding the cost of housing and strainer pipe assembly). The work would be completed after obtaining sand free water.
Rates are exclusive of GST. | - | - | - | - |
| 2 | Nominal bore 150 mm dia. | - | Mtr | 842.37 | - |
| 3 | Add 15% extra on above item (Item no 2.1.1 to 2.1.3) for drilling depth beyond 100 mtr and up to 200 mtr, rate shall be applicable for only extra depth beyond 100 mtr and up to 200 mtr.
Rates are exclusive of GST. | - | Mtr | 968.73 | - |
| 4 | Add 40% extra on above item (Item no 2.1.1 to 2.1.3) for drilling depth beyond 200 mtr, rate shall be applicable for only extra depth beyond 200 mtr .
Rates are exclusive of GST. | - | Mtr | 1,179.32 | - |
| 5 | Construction of tube well after completion of drilling by rotary /percussion method & up to 100 mtr. depth in all type of rocks by DTH system as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications. The work shall be deemed completed only after obtaining sand free water. The bore well should have a throughout nominal size bore beyond casing pipe.
Rates are exclusive of GST. | - | - | - | - |
| 6 | Nominal bore 150 mm dia. | - | Mtr | 740.68 | - |
| 7 | Add 15% extra on above item (Item No 2.3.1 to 2.3.3) for drilling depth beyond 100 mtr and up to 200 mtr from ground level, rate shall be applicable for only extra depth beyond 100 mtr and up to 200 mtr.
Rates are exclusive of GST. | - | Mtr | 851.78 | - |
| 8 | Add 30% extra on above item (Item No 2.3.1 to 2.3.3) for drilling depth beyond 200 mtr and from ground level, rate shall be applicable for only extra depth beyond 200 mtr .
Rates are exclusive of GST. | - | Mtr | 962.88 | - |
| 9 | Add 15% extra on above item (Item No 2.3.1 to 2.3.3) for drilling, where strata is collapsible and lowering of casing pipe is required . The work includes lowering of casing pipe, but excluding the cost of casing pipe. The rate shall be applicable for stretch of collapsible strata only.
Rates are exclusive of GST. | - | Mtr | 851.78 | - |
| 10 | Construction of Tube Well up to 100 mtr. depth in all type of rocks by DTH system & over burden to accommodate casing pipe of following sizes in all types of soils & over burden including lowering of casing pipes, (if required) excluding cost of casing pipes, as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications. The work would be completed after obtaining sand free water. The tube well should have a through out bore as per nominal dia of casing pipe.
Rates are exclusive of GST. | - | - | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
12TD150TWJobner.pdf
Tender Documents • 4.53 MB
BOQ_1026876.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .