Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.6 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹13.6 L+₹3.9 L (40.9%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹13.7 L+₹4.1 L (42.4%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹14.4 L
EMD Value
₹28,900
Closing Date
8 Oct 2026, 6:55 pmClosed
Executive Engineer PWD RandB PD III JAMMU
Office of the PWD RandB PROJECT DIVISION III JAMMU
Construction of additional building Kote room at Wazarat Road, Jammu. CNo-346 NP
2026_PWDJK_327012_2
Short e-NIT No. 103 of 2026-2027 Dated 03-10-2026
Open Tender
Civil Works
Percentage
45 days
JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer PWD RandB PD III Jammu
₹28,900
Office of the PWD RandB PROJECT DIVISION III JAMMU
13 Oct 2026
3 Oct 2026
9 Oct 2026
3 Oct 2026
8 Oct 2026
3 Oct 2026
6 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto
1.5 m, as directed by Engineer-in- Charge.
All kinds of soil : (KOT AMMUNITION ROOM) | 81.56 | cum. | 592.9 | ₹48,356.92 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 2.38 | cum. | 5,202.9 | ₹12,382.9 |
| 3 | Reinforced cement concrete work in walls (any thickness) including attached pilasters buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and
struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 6.34 | cum. | 9,395.7 | ₹59,568.74 |
| 4 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°,
landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral
stair cases upto five level including curing but excluding the cost of centring, shuttering,
finishing and reinforcement with
5.3.1 1:11⁄2:3 (1 cement : 11⁄2 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 20.62 | cum. | 9,821.85 | ₹2,02,526.55 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for:
5.9.2 Walls (any thickness) including attached pilasters, buttresses, plinth and
string courses etc. | 133.27 | sqm. | 628.95 | ₹83,820.17 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for:
string courses etc.
5.9.3 Suspended floors, roofs, landings, balconies and access platforms. | 15.61 | sqm. | 718.2 | ₹11,211.1 |
| 7 | 15mm cement plaster on the rough side of single or half brick wall
finished with a floating coat of neat cement of mix :
13.8.2 1 : 4 ( 1 cement : 4 fine sand) | 63.94 | sqm. | 397.2 | ₹25,396.97 |
| 8 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in
foundation and plinth including curing in :
6.1.5 Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 10.98 | cum. | 7,571.55 | ₹83,135.62 |
| 9 | Extra for brick work with common burnt clay bricks/cement concrete bricks in
superstructure above plinth level upto floor five level | 10.98 | cum | 1,455.65 | ₹15,983.04 |
| 10 | 12mm Cement plaster of mix:
13.1.1 1 : 4 ( 1 cement : 4 fine sand) | 57.62 | sqm. | 283.8 | ₹16,352.56 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.73 MB
BOQ_1106044.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .