| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3 L
EMD Value
₹30,000
Closing Date
1 May 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Block Development officer BP
The Block Development officer BP, Tirupathur
Tirupathur District NNT 2022-23 Construction of Community Hall at Vilangkuppam in PudhurNadu Panchayat
2023_RDTN_305986_1
A2/3926/2021
Open Tender
Civil Works
Item Rate
180 days
Thirupathur Block
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹30,000
1 May 2023
25 Apr 2023
1 May 2023
25 Apr 2023
1 May 2023
25 Apr 2023
Amount
Construction of Community Hall @ Vilangkuppam in PudhurNadu Panchayat
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Hard rock measured in solid including blasting & stacking c
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum.
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical
For LINTEL Sides & Bottom
Column
Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum.
BRICK WORK in cement mortar 1:5 (One cement and five sand) using second class country bricks of size 23cm x 11cm x 7cm for the following including curing etc., complete complying with standard specifications. (Masonry projections wherever necessary for obtaining required elevation shall be done without extra cost).
Supplying and fixing P.V.C rainwater down fall pipe of 110mm dia with necessary shoes, bends,& clamps etc.,
Plastering with cement mortar 1:3 mix to 10 mm thick including cost and conveyance of all materials to site and all labour
Finshed with one course of pressed tiles of size 23x23x2cm mortar 1:3 mix and pointed with the same oiled mortar including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Weathering course with brick jelly lime concrete using 20mm brick jelly with pure slacked lime over R.C.C. roof slab in the proportion of 32:12.5 and conveyance of all materials to site and all labour charges etc complete for 10 Sqm including cost and conveyance of all materials to site and all labour charges etc, complete .
Plastering with cement mortar 1:5 mix to 12 mm thick including cost and conveyance of all materials to site and all labour
Floor finishing with ceromic tiles of size 20cmx20cm including cost and conveyance of all materials to site and all labour charges etc complete
Supplying and painting the walls with two coats of Oil Distember over one coat of primer as instructed by the department officers including preparation of surface curing
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Electrical Arrangements
Provision name board charges
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
Vikram Construction
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .