| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.8 LAccepted-AOC 575 TOHANA 125120 | TOHANA | FATEHABAD | HARYANA | 125120 | 1 | Accepted-AOC L-1 | |
| 2 | 2₹9.1 L+₹2,194 (0.24%)Rejected-Finance | 2 | Rejected-Finance L-2 | |
| 3 | 3₹9.3 L+₹20,502 (2.26%)Rejected-Finance | 3 | Rejected-Finance L-3 |
Tender Value
₹8.4 L
EMD Value
₹16,500
Closing Date
8 Oct 2026, 5:00 pmClosed
Pankaj Kumar
Municipal Committee Jakhal Mandi
REINFORCEMENT CEMENT CONCTRETE SLAB WITH COLUMN AND ROOMS , KITCHEN ETC
2026_HRY_551589_1
20269A1DEFCB 8BDE 4F98 92A7 578A687E1549488ULB
Open Tender
Civil Works
Works
150 days
Jakhal
REINFORCEMENT CEMENT CONCTRETE SLAB
2 documents required · 2 mandatory
₹1,000
₹16,500
Yes
12 Oct 2026
1 Oct 2026
9 Oct 2026
1 Oct 2026
8 Oct 2026
1 Oct 2026
1 Oct 2026 - 3 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate] | 4.32 | cum | 1,863 | ₹8,048.16 |
| 2 | [23.3.6.1]COPPER WIRING IN PVC CONDUIT (SURFACE/RECESS) 6.1. Wiring main and sub mains in two single core for phase and neutral wire and one single core for earth wire PVC insulated Copper conductor cable 1100 Volts grade in PVC Conduit etc as required. 1 run of Size 1.50 Sqmm(1/1.40mm) [Through Rate] | 100 | Metre | 88 | ₹8,800 |
| 3 | [23.7.6.1]PVC CONDUIT PIPE ONLY (SURFACE OR RECESSED) FOR ELECTRICAL POINTS 6.1. Supply and erection of PVC CONDUIT ISI marked (Medium) recessed in wall/ceiling etc. including the cost of PVC bends, inspection boxes, iron hooks and cement concrete etc. complete in all respect up to the entire satisfaction of Engineer-in-Charge of work. PVC pipe of 20 mm dia. [Through Rate] | 250 | Metre | 26 | ₹6,500 |
| 4 | [23.8.4]FITTING AND ACCESSORIES 4. Supply and erection of 10.5 cm dia M.S.Fan box including 8 mm dia 30 cm long M.S. Road made into suitable suspension hook and erected in R.C.C. slab for the erection of fan complete with all labour and material required to complete the job. [Through Rate] | 30 | Each | 95 | ₹2,850 |
| 5 | [24.14.11]LT CABLES (Aluminium Conductor, Armoured and Unarmoured) PROVIDING& ERECTION/ LAYING OF PVC/ XLPE INSULATED UNDERGROUND ALUMINIUM CONDUCTOR UNDERGROUND CABLE ONSURFACE/ EXISTING CABLE TRAY COMPLETE IN ALL RESPECT WITH NECESSARY CONNECTION UPTO THE ENTIRE SATISFACTION OF ENGINEER IN CHARGE OF THE WORK 11. 6 Sq mm 4 core (UnArm.) [Through Rate] | 100 | Metre | 92 | ₹9,200 |
| 6 | [32.27.1]Centering and shuttering with 12mm thick shuttering plywood confirming to IS 4990:2011 and removal of form at all heights. Plywood will be supported on lock bars. 1. Suspended floors, roofs, landings, balconies and access platform. [Through Rate] | 553.84 | Sqm | 69 | ₹38,214.96 |
| 7 | [4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate] | 54 | cum | 78 | ₹4,212 |
| 8 | [5.7.3]Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 3. In lime mortar [Through Rate] | 39.42 | cum | 347 | ₹13,678.74 |
| 9 | [6.1.1]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1. 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) [Through Rate] | 73 | cum | 3,975 | ₹2,90,175 |
| 10 | [6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more [Through Rate] | 7,000 | Kg. | 66 | ₹4,62,000 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
BOQ_631410.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .