| # | Company | Status |
|---|---|---|
| 1 | Not Admitted-Finance BARMER | Not Admitted-Finance Others-Clause 5.8 of guideline for evaluation of bids and award of contract under PMGSY dated 07.05.2013, Single bid is received in the first invitation therefore the bid shall not be opened and hence rejected. |
| 2 | Rejected-Technical | Rejected-Technical Non-Responsive |
Tender Value
₹15.4 Cr
EMD Value
₹30.8 L
Closing Date
16 Mar 2023, 12:00 pmClosed
ACE, PWD Zone-II Jodhpur (HQ-Barmer)
ACE, PWD Zone-II Jodhpur (HQ-Barmer)
Upgradation of Sindhari Koshloo Wannaniyo Ki Beri Adel Road under PMGSY-III Batch-II (2022-23) in District Barmer. Package No.RJ-05-P3-18
2023_CERJ_123367_1
RJ05P3-18
Open Tender
Civil Works - Roads
Percentage
270 days
Barmer
Please refer Tender documents.
7 documents required · 7 mandatory
₹15,000
₹30.8 L
ACE, PWD Zone-II Jodhpur (HQ-Barmer)
12 Apr 2023
3 Mar 2023
17 Mar 2023
3 Mar 2023
16 Mar 2023
3 Mar 2023
8 Mar 2023
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of reference bench mark (1 No.), working bench mark (4 Nos.) and near all drainage structures and bridges (as per direction of Engineer-in-charge), reference pillar/ burgees @ 50m interval on both side of formation width including marking of centre line, setting out curves, recording of levels, white washing and lettering etc. complete as per MORD specifications cl. 108. Reference benchmark/working benchmark (As per drawing annex-I) (BT+CC) | - | Per km | - | - |
| 2 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRD Specification Clause 201.By Mechanical Means In area of non-thorny jungle | - | Hect. | - | - |
| 3 | Scarifying old bituminous road by making 50x50mm furrows criss-cross at 1.0 metre intervals at 45 degree to the center line of the carriageway Ex BT 3.75 M Width | - | Sqm | - | - |
| 4 | Loosening, Levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per MoRD Specification Clause 301.4.1. | 1 | Cum | - | - |
| 5 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per MoRD Specification Clause 302.3 PROP. BT AT 3.75 to 5.50 m on Widening Portion | - | Cum. | - | - |
| 6 | Construction of embankment with approved materials deposited at site obtained from roadway cutting and excavation from drain and foundation or other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per MoRD Specification Clause 301.5 Add extra for each additional Lead of 50m or part there of above the first 50m for all soils above 500m upto 1000m Lead Reused 90% Quantity from Drain approch structure and road way cutting | 1 | Cum | 1 | ₹1 |
| 7 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per MoRD Specification Clause 301.5 | - | Cum. | - | - |
| 8 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per MoRD Specification Clause 303.1. NEW PROPOSED BT | 1 | Cum | - | - |
| 9 | Construction of granular sub-base by providing well graded crusher borken material, mixing in a mechanical mix plant at OMC , carriage of mixed material to work site upto lead of 1000m spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRD Specification Clause 401.For Grading I Material | - | Cum. | - | - |
| 10 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening & binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per MoRD Specification Clause 405. Using Crusher Broken Aggregate By Manual Means | 1 | Cum. | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_196616.xls
BOQ Document • 0.34 MB
116100343.pdf
Tender Document • 5.12 MB
SBD_RJ05P318.pdf
Tender Document • 1.87 MB
Addl_PG_PMGSY_Order_dated_28-02-2023.pdf
Tender Document • 0.46 MB
OnlineBid-19March2021.pdf
Tender Document • 3.47 MB
116100347.html
Tender Document • 0.03 MB
116746443.pdf
Tender Document • 2.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .