| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.9 LAccepted-AOC BACK SIDE OF HOTEL MSM DAIRY FARM PORT BLAIR | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744103 | L1 | Accepted-AOC L1 | |
| 2 | L2₹15.9 L+₹4,385 (0.28%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹16.0 L+₹12,229 (0.77%)Rejected-AOC GOVT CONTRACTOR 1 32 MOHAMMED HOUSE 23 JIRGATANG SOUTH ANDAMAN PIN 744206 | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744206 | L3 | Rejected-AOC L3 | |
| 4 | L4₹16.3 L+₹41,547 (2.62%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | L5₹16.4 L+₹56,301 (3.55%)Rejected-AOC | L5 | Rejected-AOC L5 |
Tender Value
₹19.2 L
EMD Value
₹38,396
Closing Date
16 Feb 2023, 3:00 pmClosed
Executive Engineer
Executive Engineer, Construction Division No.II, APWD, Prothrapur.
Repair of approach road from M-s Reliable Industrial to M-s Sandeep Engineering at Industrial Estate Complex Dollygunj for a length of 415 mtr.
2023_APWD_9180_1
NIT No.47/EE/CD-II/2022-23
Open Tender
Civil Works - Roads
Item Rate
90 days
South Andaman
Please refer tender document.
5 documents required · 5 mandatory
₹0
₹38,396
18 Apr 2023
3 Feb 2023
17 Feb 2023
3 Feb 2023
16 Feb 2023
6 Feb 2023
3 Feb 2023 - 14 Feb 2023
Amount
Cutting road and making good the same including supply of extraquantities of materials i.e. aggregate, moorum screening, red bajriand labour required.
Water bound macadam
Providing and applying tack coat using hot straight run bitumen ofgrade VG - 10, including heating the bitumen, spraying the bitumenwith mechanically operated spray unit fitted on bitumen boiler,cleaning and preparing the existing road surface as perspecifications :
On W.B.M. @ 0.75 Kg / sqm
Providing and laying Bitumen Penetration Macadam with hard stoneaggregate of quality, size and grading as specified, with bitumen ofsuitable penetration grade, including required key aggregate asspecified, spreading coarse aggregate with the help of self propelled/tipper tail mounted aggregate spreader and applying bitumen by apressure distributor and then spreading key aggregate with the helpof aggregate spreader complete, including consolidation with roadroller of minimum 8 to 10 tonne capacity to achieve specified valuesof compaction and surface accuracy :
For 75 mm compacted thickness in two layers using stoneaggregate of size 63-41 mm graded @ 0.90 cum per 10sqm key aggregate of size 20.0 mm graded @ 0.18 cumper 10 sqm. With paving asphalt grade VG - 10 @ 68 kg/10 sqm.
Providing and laying seal coat of premixed fine aggregate ( passing2.36 mm and retained on 180 micron sieve) with bitumen using 128kg of bitumen of grade VG - 10 bitumen per cum of fine aggregateand 0.60 cum of fine aggregate per 100 sqm of road surface, includingrolling and finishing with road roller all complete.
2 cm premix carpet surfacing with 1.8 cum and 0.90 cum of stone chippings of 13.2 mm size and 11.2 mm size respectively per 100sqm and 52 kg and 56 kg of hot bitumen per cum of stone chippings of 13.2 mm and 11.2 mm size respectively, including a tack coat with hot straight run bitumen, including consolidation with road rollerof 6 to 9 tonne capacity etc. complete including adding of 10% shredded plastic by the total weight of Bitumen and finally deducting 10% of total bitumen quantity. (tack coat to be paid for separately).
With paving Asphalt grade VG-30 with no solvent
S MUTHUSWAMY
Haneefa Constructions
T ROBERT KENNEDY
ANAND TRADERS AND CONSTRUCTION
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .