Loading…
Loading…
Tender Value
₹2.4 L
EMD Value
₹4,854
Closing Date
29 Aug 2026, 6:00 pmDue today
Executive Engineer REW Doda
Office of the Executive Engineer REW Doda
Constt. Of Culvert at Chatran Nallah w no 7 Pyt Chinyas Block Jakyas (PRIs Grant)
2026_RDPR_321210_20
e-NIT No 73 of REW Doda 2026-27 Dated.17.08.2026
Open Tender
Civil Works
Percentage
30 days
Doda
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Rural Development and Panchayati Raj
₹4,854
17 Aug 2026
17 Aug 2026
31 Aug 2026
17 Aug 2026
29 Aug 2026
17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 7.72 | Cum | 592.9 | ₹4,577.19 |
| 0.0 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. Ordinary Rock | 2.57 | Cum | 940.3 | ₹2,416.57 |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 1.47 | Cum | 5,202.9 | ₹7,648.26 |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) with 20% Boulders | 9.47 | Cum | 4,726.88 | ₹44,763.55 |
| 0.0 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 2.01 | Cum | 7,104.35 | ₹14,279.74 |
| 0.0 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Mild steel and medium tensile steel bars | 191 | Kgs | 115.35 | ₹22,031.85 |
| 0.0 | Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc. | 17.7 | Sqm | 628.95 | ₹11,132.42 |
| 0.0 | Centering and shuttering including strutting, propping etc. and removal of form work for:Edges of slabs and breaks in floors and walls Under 20 cm wide | 13.41 | Mtr | 262.2 | ₹3,516.1 |
| 0.0 | Centering and shuttering including strutting, propping etc. and removal of form work for: Suspended floors, roofs, landings, balconies and access platforms. | 7.92 | Sqm | 718.2 | ₹5,688.14 |
| 0.0 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 1.24 | Sqm | 286.35 | ₹355.07 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.32 MB
BOQ_1071946.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].