| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC OHLI KUNTWARA KUTAL KISHTWAR J K 182204 | KISHTWAR | KISHTWAR | JAMMU AND KASHMIR | 182204 | ₹4.1 L | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹4.9 LRejected-Finance | ₹4.9 L | L2 | Rejected-Finance Being L2 |
| 3 | L3₹5.6 LRejected-Finance | ₹5.6 L | L3 | Rejected-Finance Being L3 |
| 4 | L4₹6.2 LRejected-Finance | ₹6.2 L | L4 | Rejected-Finance Being L4 |
| 5 | L5₹6.2 LRejected-Finance C O RAMESH KUMAR C O RAMESH KUMAR BHAGWATI NAGAR KISHTWAR KISHTWAR KISHTWAR JAMMU KASHMIR 182204 UDYAM JK 10 0006646 | KISHTWAR | JAMMU AND KASHMIR | 182204 | ₹6.2 L | L5 | Rejected-Finance Being L5 |
Tender Value
₹10.6 L
EMD Value
₹21,000
Closing Date
7 Feb 2026, 5:00 pmClosed
DGM (C) PnC Division Ratle HEP
PnC division Ratle HEP Office Complex Kishtwar
Construction of Motorable Road at Site-02 Colony, Joshana, Drabshalla from RD 0.00 M to 650 M (1st Stage) (Reserved for PAFs or Local)
2026_RHPCL_263242_1
RH/RATLE/PnC/C-074/2026
Open Tender
Civil Works - Roads
60 days
Joshana, Drabshalla
As per Tender Documents.
9 documents required · 9 mandatory
₹590
Ratle Hydroelectric Power Corporation Limited
₹21,000
Yes
26 May 2026
17 Jan 2026
11 Feb 2026
17 Jan 2026
7 Feb 2026
17 Jan 2026
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil :
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. Ordinary Rock
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.Hard Rock (Blasting Prohibited)
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
Preparation of subgrade by excavating earth to an average of 22.5 cm depth, dressing to camber and consolidation with road roller of 8-12 tonne capacity including making good the undulation etc. and disposal of surplus earth upto 50 meters.
Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil.
Please Enable Macros to View BoQ information
stage.html
html • 0.07 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
TN74.pdf
Tender Documents • 2.23 MB
BOQ_305386.xls
BOQ • 0.32 MB