SE/GCC/SALEM
Superintending Engineer , TANTRANSCO, General Construction Circle, Salem - 636 014.
Providing various SS Structure plinth foundation, cable duct, HBG metal, stone dust filling and allied civil works and supply of iron and steel materials, fabrication and erection of electrical structures, erection of equipments and providing eart
2025_EB_629854_1
T.S.No.15/2025-26 of SE/GCC/Salem (GL)
Open Tender
Civil Works
Item Rate
90 days
SHOOLAGIRI
AS PER BQR CONDITION
2 documents required · 2 mandatory
₹0
₹48,400
Yes
8 Dec 2025
8 Dec 2025
23 Dec 2025
8 Dec 2025
22 Dec 2025
8 Dec 2025
Earth work excavation for foundation including all labour charges including initial lead, lift, etc., complete. In Hard gravelly soil
Earth work excavation for foundation including all labour charges including initial lead, lift, etc., complete.In Medium rock and dense medium rock not requiring blasting.
Earth work excavation for foundation including all labour charges including initial lead, lift, etc., complete.In Hard rock wedging and chesseling
PCC 1:3:6, using 12 to 20mm HBG metal without formwork for plinth foundation including cost of cement, all materials, labour, lead, lift, etc. complete.
PCC 1:2:4, using 12 to 20 mm HBG metal with formwork for plinth foundation including cost of cement, all materials, labour, lead, lift, etc. complete.
RCC 1:1.5:3 mix using 12mm to 20 mm HBG metal for breaker plinth with form work including all cost labour materials lead lift curing vibrator etc complete but excluding cost of steel reinforcement
Providing precast slab in RCC 1:1.5:3 for cable duct using 12 to 20mm HBG metal with form work including cost of all materials, lead, lift, vibrator etc., but excluding cost of steel reinforcement.
Brick work in CM 1:5 using chamber burnt bricks second II class for Cable Duct structure, including cost of all materials, all labour charges, lead, lift, etc. complete.
Providing steel reinforcement MS/ RTs rod including cost of binding wire, labour charges for cutting ,bending, tying, straightening fixing and placing in position including cost of all materials, lead, ift etc., complete.
Plastering with CM 1:3, mix 12mm thick for plinth work including all cost of all materials labour lead lift curing etc complete.
Plastering with CM 1:5, mix 12 mm thick for cable duct concerete work including all cost of all materials labour lead lift curing etc complete.
Colour washing 2 Coats over a base coat of primer using Exterior weather coat using Asian APEX or Equivalent of approved Brand,quality and colour for outer wall surfaces for all floors including cost of all labours to work at all levels cost of materials brushes scaffolding charges etc. complete complying with standard specification and as directed.
Transporting and fixing of precast RCC cover slab from curing tank to working spot including cost of labour, lead, lift etc., complete.
Fabrication of Template and assembling in correct position for various equipment plinth and grouting the foundation bolts including cost of all materials, labour, lead, lift etc. complete.as directed by the dept. Engineer at site
Fabriaction, galvanising and supply of foundation bolts of 20mm dia and 1.2m length and nuts with 2 nos. washer in Galvanized Steel including 10 cm L at bottom and 15 cm threading with 2 nuts and washers at top including cost of all materials, labour, lead, lift etc. complete.as directed by the dept. Engineer at site
Supply, fabrication, transport and fixing of MS angles of various sizes for cable duct including aligining in position, cost of all materials, labour, lead, lift etc. complete.as directed by the dept. Engineer at site
Providing and laying PVC high density pipe (10 kg. per cm2) including cost of all specials like coupling, bend etc., and including necessary earthwork and burrying , all material labour, etc., complete and as directed by the Engineer-in-charge at site.. For 40 mm dia
Providing and laying PVC high density pipe (10 kg. per cm2) including cost of all specials like coupling, bend etc., and including necessary earthwork and burrying , all material labour, etc., complete and as directed by the Engineer-in-charge at site.. For 32 mm dia
Providing and laying PVC high density pipe (10 kg. per cm2 ) including cost of all specials like coupling, bend etc., and including necessary earthwork and burrying , all material labour, etc., complete and as directed by the Engineer-in-charge at site.. For 25 mm dia
Providing and fixing Gate valve of 40 mm diameter of Gun metal made including cost of all materials, labour, lead and lift etc., complete and as directed by the Engineer-in-charge at site.
Providing and fixing Gate valve of 32 mm diameter of Gun metal made including cost of all materials, labour, lead and lift etc., complete and as directed by the Engineer-in-charge at site.
Supplying and fixing of 20 mm PVC bib cock for earthpit including cost of all materials, etc., complete.
Supplying and filling of stone chips 12 mm to 20 mm HBG metal with required thickness including cost of all materials,lead, lift, T&P etc., complete.
Supplying and filling of stone dust with required thickness including cost of all materials,lead, lift, T&P etc., complete.
Providing pipe line for laying cable to breaker plinths with 110 mm dia PVC pipe 4 kg/cm2 including all specials and cost of all material, lead, lift, etc., complete as per standard specification and as directed by the Engineer-in-charge at site.
Supply and Iron Steel as per ISI RS JOIST 200X100 mm
Supply and Iron Steel as per ISI MSC 125X65 mm
Supply and Iron Steel as per ISI MSC 100X50 mm
Supply and Iron Steel as per ISI MS Rod 40 mm
Supply and Iron Steel as per ISI MS Angle of various sizes
Supply and Iron Steel as per ISI RTS ROD 20mm (Including I-bolt Rod)
Supply and Iron Steel as per ISI M.S.Flat 50x8mm
Supply and Iron Steel as per ISI M.S Flat 65 X 10 mm
Supply of Aluminium Paint
Supply of Red- Oxide Paint
Supply of AC Black paint
Supply of 6 Bolt Tension Fitting
Supply of 6 Bolted double tension fitting for zebra conductor space 225mm with single anchoring point
Supply of SE clamp to Zebra
Supply of SE clamp to Double Zebra
Supply of SE clamp to 3" bus bar
Supply of Free end to 3" Bus bar
Supply of T' clamp for Zebra to Zebra
Supply of Switch end clamp for flexible connection
Supply of T' clamp for Zebra to 3" busbar
Supply of T' clamp for Zebra to 2" busbar
Supply of P.G. clamp for Zebra
Supply of Corona bell for 3" Busbar
Supply of Spacer clamp Zebra with 225 mm spacing
Supply of CT Bushing clamp for Twin Zebra
Supply of LED lamp of reputed make of 72 Watts with fitting
Labour for fabrication of heavy section without length wise welded joints (Sectional weight 14 Kg/m and above)
Labour for fabrication of heavy section with length wise welded joints (Sectional weight 14 Kg/m and above)
Labour for fabrication of light section (Sectional weight below 14 Kg/m)
Labour charges for erection of heavy sections.(Sectional weight 14 Kg/m and above)
Labour charges for erection of light sections.(Sectional weight below 14 Kg/m)
Labour for rust removing cleaning painting of first primer coat(red oxide paint ) of all sections including cost of paint, brush and consumables.
Labour for removing,cleaning painting (Aluminium)of first finishing coat of all sections including cost of paint, brush and consumables.
Labour for painting (Aluminium)of second finishing coat of all sections including cost of paint, brush and consumables.
Labour for erection with own crane arrangement and connecting link rod,SF6 Gas filling and other consumables and as directed by the field engineer - 110 KV SF6 Circuit Breaker
Labour for erection of Measurement Transformer with own crane arrangement including providing holes wherever required,fixing junction box and other consumables and as directed by the field engineer - 110 KV CT without using Board crane (one single unit)
Labour for erection of AB Switches , including the cost of lubricant,consumables and wiring (if necessary) alignment checking of operation by both manual and electrical (if necessary) and as directed by the field Engineer- 110 KV without Earth motor operated (LC Work involved)
Labour for erection of AB Switches , including the cost of lubricant,consumables and wiring (if necessary) alignment checking of operation by both manual and electrical (if necessary) and as directed by the field Engineer- 110 KV without Earth motor operated.
Labour for erection of LAS -110 KV L.A.S. Station type with surge monitor (LC Work involved)
Labour for erection of Insulators single pole stack up right,under hang or suspension-110 KV
Labour for erection of Insulators single pole stack up right,under hang or suspension-110 KV (LC Work involved)
Erection of Simplex Panel including alignment and earthing as directed by field engineer.
Labour Charges for removing rust,primer coat first and second coat painting both sides & in M.S. Boards RS joists & Yard light pole etc., including cost of enamel paint ( Dulex, Asian, Berger is preferred) and other consumables as directed by th field Engineer.
Labour charges for writing details in finished surface boards including cost of enamul paint ( Dulex, Asian, Berger is preferred) and other consumables as directed by th field Engineer.
Labour for transporting of iron & steel from chennai (320 Kms.)
Fabrication and fixing of bell mouth providing jumper connection in the solidcore / PT insulators including the cost of GI Pipe 50 mm dia one meter & other consumables as directed by th field Engineer.
Labour for loading or unloading or shifting of non fragile material without using board crane (one operation)
Labour for loading or unloading or shifting of fragile material with own crane arrangement (one operation)
Labour for loading or unloading or shifting of 110KV and above breakers,CT,PT& etc., by own crane arrangement (one opeartion)
Supply and providing of 600 mm mean dia ,300 mm height ,36mm thick cement collar for identification of earth electrode location including 1 Primer and 2 coats of colour wash as directed by the field engineer.
Labour charges machineries , consumables for erection of earth mat and earth raisers as directed by the field engineer at site.
Labour charges machineries , consumables for fabrication of Earth electrode 10 mtr/6mtr length or as directed by the field engineer.
Labour charges machineries , consumables for fabrication and erection of Earth spikes.
Providing 140/150 mm dia bore including labour ,lead,lift etc.,complete mobilization in all types of soils and erection of earth electode,supply and providing A4 Grade bentonite powder with 5% common salt mixed with available site clay soil with water5 Kg/m depth in earth bore and pouring water and tightening of earth bore, upto satisfactory earth.
Labour for excavation and refilling of trunch of avg.width of 0.3 m & avg depth of 0.8 m for earth mat and avg.depth of 0.4m for laying of cable below fixed yard level and any of size as required.
Labour for stringing of strung bus including hosting of insulator- 110 KV Single zebra conductor (1 span 3 runs ) (LC Work involved)
Labour for stringing of strung bus including hosting of insulator- 33 KV Double zebra conductor (1 span 6 runs ) (LC Work involved)
Labour charges for erection of Bus bar including fabrication and any modification of end clamp wherever necessary and as directed by field engineer - 75 mm IPS Aluminium tube with making bend (LC Work involved)
Labour charges for erection of Bus bar including fabrication and any modification of end clamp wherever necessary and as directed by field engineer - 75 mm IPS Aluminium tube without making bend (LC Work involved)
Labour charges for erection of Bus bar including fabrication and any modification of end clamp wherever necessary and
as directed by field engineer - 75 mm IPS Aluminium tube without making bend
Labour for providing of droppers and jumpers
Labour for erection of cable end glands
Supply and termination of cable core ends including the cost of cable socket, lug ferrules, straps etc., as per cable schedule and as directed by the field engineer. (No. of core ends in unit of 1000)
Labour for providing of droppers and jumpers (LC Work involved)
Labour for laying of cable in duct / trench including the cost of Aluminium tag for identification. Upto 8 core
Labour for laying of cable in duct / trench including the cost of Aluminium tag for identification. Above 8 core
Labour for laying of cable and clamping in structures. Upto 8 core
Labour for laying of cable and clamping in structures. Above 8 core
Supply and provision of M8,M9,M10,M12 & M16 full thread G.I. Bolt , Nuts & GI washer of various size for erection of Insulators or any other purpose wherever required and as directed by field Engineer
Labour for erection of yard light pole including laying of cable inside pole.
Labour for erection of LED Lamp 72 w fitting with fixture and fuse including wiring and testing for burning condition including the cost of 15 Amps 2 way strip connector and other consumables.
Labour charges for Manufacturing and supply of bolt of required length of 18 to 20 mm dia GI rod and 2 nos GI nuts & washer as directed by field Engineer ( Eye Bolt )
Manufacturing & Supply of yard light box of size 200W X 200H X 150D mm out of 18 SWG(1.2 mm) M.S.Sheet with cable entry holes,fixing arrangements for fuse units and mounting clamps as directed by the field engineer including the cost of all materials.
Supply and fixing of wooden board 25 mm/Hylam sheet of 10 mm thick for fixing of fuse units wherever required as directed by the field Engineer
Supply and erection of M.S.rod of 6mm dia for fencing Barricade as directed by the field Engineer
Supply & Fixing of GI STELL TUBLAR POLE for Street light 8 Meter length single bracket pole with Base plate (250X250X6mm) 114.30 mm ODX 5.40mm Thick X 4500 length,88.90 mm ODX 4.85mm Thick X 1750 length,76.10 mm ODX 3.25mm Thick X 1750 length,
Supply and glanding of ISI mark cable glands of suitable size of reputed make including removing insulation of cable and providing suitable holes as directed by the field engineer - 15 mm
Supply and glanding of ISI mark cable glands of suitable size of reputed make including removing insulation of cable and providing suitable holes as directed by the field engineer - 19 mm
Supply and glanding of ISI mark cable glands of suitable size of reputed make including removing insulation of cable and providing suitable holes as directed by the field engineer - 25 mm
Supply and glanding of ISI mark cable glands of suitable size of reputed make including removing insulation of cable and providing suitable holes as directed by the field engineer - 32 mm
Supply and fixing of disconnected type terminal block suitable for C.T circuits in panel / box as required and as directed by field engineer
Supply and fixing of (Godrej) 6 lever Navtal lock with duplicate keys for AB Switch and for any other purpose including the cost of ring and key token as directed by the field engineer
Supply and fixing of flexible copper tape/rope for interlinking panel earthing and for any other purpose ,on any sizes, including the cost of copper lugs at both ends etc.as directed by field Engineer.
Labour charges for painting of earth raisers by green enamul painting and wherever required including cost of paint(Dulex,Asian Berger prefered)and other consumables .
Supply and fixing of ISI mark Bakelite HRC / Rewireable fuse holders in panels / Boxes for AC / DC / P.T circuits wherever required and as directed by the field Engineer 16 Amps (16 Amps Fuse base +10 Amps Fuse link)
Labour charges for drawing layout and writing details in LC/Key board including coswt of enamul paint(Dulex,Asian,Berger preferred) and other consumables as directed by the field engineer.
Supply and erection of 'B' class GI pipe for extension of tandum/down pipe for AB switchs and for any other work as required by and as directed by the field engineer. - 40 mm dia.
Labour charges for erection of CT/PT junction box including fabrication of clamp.
Dismantling of heavy section (LC work involved)
Dismantling of light section (LC work involved)
Dismantling of jumper & dropper (LC work involved)
Dismantling of 110 KV insulators (LC work involved)
Dismantling of 75 mm busbar without bent (LC work involved)
Dismantling of strung bus (1 span 3 nos) 110 KV (LC work involved)
Providing Watch & Ward personals from the date of handingover to till the date of comissioning of SS , to safe all the equipments and materials at site (30 Days X 4 Nos)
GST for bidders within Tamil Nadu
GST for bidders outside Tamil Nadu (IGST)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.10 MB
BOQ_753204.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .