Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | I₹11,274Accepted-Finance | ₹11,274 | I | Accepted-Finance The matter will be placed before the Board. |
| 2 | II₹90.0 LAccepted-Finance | ₹90.0 L | II | Accepted-Finance The matter will be placed before the Board. |
| 3 | III₹1.2 CrAccepted-Finance | ₹1.2 Cr | III | Accepted-Finance The matter will be placed before the Board. |
Tender Value
Refer Docs
EMD Value
₹1.8 L
Closing Date
7 Sept 2022, 5:00 pmClosed
Chief Executive Officer Cantonment Board Deolali
Office of the Cantonment Board Cannaught Road Deolali 422401 Tal and Dist Nashik Maharashtra
Maintenance of Cantt. Fund roads with SDBC - Deolali Cantonment
2022_DGDE_707930_1
R and B Sr No.65-2022-23 III- Call
Open Tender
Civil Works - Roads
Works
365 days
Deolali Cantonment Board
Please refer Tender documents.
2 documents required · 2 mandatory
₹9,000
Chief Executive Officer Cantonment Board Deolali
₹1.8 L
1 Nov 2022
23 Aug 2022
8 Sept 2022
23 Aug 2022
7 Sept 2022
23 Aug 2022
Amount
Maintenance of Cantt. Fund Roads with SDBC
Providing & laying 75/50 millimetre thick compacted Modified Penetration Macadam with VG 30 bitumen over existing Water Bound Macadam surface including picking the road metalled surface thoroughly cleaning the Water Bound Macadam surface by using mechanical broom or approved equipment spreading 40 millimetre size metal (30 percentage Crushed metal + 70 percent Hand broken by bringing basted rubble on site of work) at the rate of 0.09 cubic metre per square metre compacting metal with roller and bitumen is then spread at the rate of 2 Kg. per square metre spreading 12 millimetre metal at the rate of 0.018 cubic metre per square metre. The surface shall be lightly rolled so that metal pieces get embedded in the bitumen layer and rolling shall continue until entire surface is thoroughly compacted etc complete. (With Static Roller) (Including diversion road) a) 75 Millimetre
Providing & laying 75/50 millimetre thick compacted Modified Penetration Macadam with VG 30 bitumen over existing Water Bound Macadam surface including picking the road metalled surface thoroughly cleaning the Water Bound Macadam surface by using mechanical broom or approved equipment spreading 40 millimetre size metal (30 percentage Crushed metal + 70 percent Hand broken by bringing basted rubble on site of work) at the rate of 0.09 cubic metre per square metre compacting metal with roller and bitumen is then spread at the rate of 2 Kg. per square metre spreading 12 millimetre metal at the rate of 0.018 cubic metre per square metre. The surface shall be lightly rolled so that metal pieces get embedded in the bitumen layer and rolling shall continue until entire surface is thoroughly compacted etc complete. (With Static Roller) (Including diversion road) b) 50 Millimetre
M/s M R MAHANA
Anand Construwell Pvt. Ltd.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .