Tender Value
₹3.0 Cr
EMD Value
₹6.0 L
Closing Date
12 Aug 2022, 3:00 pmClosed
The Project Director, DRDA, Sivagangai
O/o The Project Director, DRDA, Sivagangai
T18-Maruthani to manapatti road via thenneervayal,eluvankottai,naduvikottai
2022_RDTN_119361_1
TN16155
Open Tender
Civil Works - Roads
Item Rate
270 days
SIVAGANGAI
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹6.0 L
SIVAGANGAI
31 Oct 2022
13 Jul 2022
12 Aug 2022
13 Jul 2022
12 Aug 2022
13 Jul 2022
3 Aug 2022
Amount
T18-Maruthani to manapatti road via thenneervayal,eluvankottai,naduvikottai
Clearing and Grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. (i) (A) - By Manual Means (In Area of Non - Thorny Jungle)
Scarifying the Existing Bituminous road surface to a depth of 100 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.
Construction of Embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Gravel Shoulder)
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. (Grading II)
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. (Grading III)
Providing and applying Prime Coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502. (i) Low Porosity
Providing and laying surface dressing as wearing course consisting of a layer of bituminous binder laid on the prepared surface, followed by a cover of crushed stone aggregates of specified size and rolling with three wheel 80-100 kN static roller including cleaning the road surface as per Technical Specification Clause 507. using mechanical means
Nominal chipping size 13.2mm
Nominal chipping size 9.5mm
Provision of Rumble strips covered with premix bituminous carpet, 15-20 mm high at centre, 250 mm wide placed at 1 m centre-to-centre at approved locations to control speed, marked with white strips of road marking paint.
PROVIDING PAVER BLOCK PAVEMENT
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Core Wall @ Ch. 0
Core Wall @ Ch. 1050
Core Wall @ Ch. 1310
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Core Wall @ Ch. 0
Core Wall @ Ch. 1050
Core Wall @ Ch. 1310
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Core Wall @ Ch. 0
Core Wall @ Ch. 1050
Core Wall @ Ch. 1310
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.
Core Wall @ Ch. 0
Core Wall @ Ch. 1050
Core Wall @ Ch. 1310
Providing and Laying of Interlocking Concrete Block Pavements having thickness 80 mm as per drawings and Technical Specification Clause 1504.(Grade M40) for traffic 100-250 vehicles (three wheeler and more).
Core Wall @ Ch. 0
Core Wall @ Ch. 1050
Core Wall @ Ch. 1310
Provision for Name Board
Provision for PMGSY Logo Board
Provision for Sign Board (1 curve =2Nos)
Provision for Chevron Sign Octogan Board (90cm)
Provision for Mandatory Sign Board
Provision for Reflector
Provision for Citizen Board
Provision for MaintanenceBoard
Provision for KM Stone
Provision for HM Stone
Construction of Single Row Pipe culvert at ch 840, 1060, 1350, 1770, 4400, 4620
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.
Pipe culvert at : 840, 1060, 1350, 1770, 4400, 4620
Removal of Pipes
Removal of Body wall
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Pipe Culvert@ Ch. 840, ,
Pipe Culvert @ Ch. 1060, 1350, 1770
Pipe Culvert@ Ch. 4400, 4620,
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Pipe Culvert@ Ch. 840, ,
Pipe Culvert @ Ch. 1060, 1350, 1770
Pipe Culvert@ Ch. 4400, 4620,
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Pipe Culvert@ Ch. 840, ,
Pipe Culvert @ Ch. 1060, 1350, 1770
Pipe Culvert@ Ch. 4400, 4620,
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed . For Footings as 4% Rate for Centering Works
Pipe Culvert@ Ch. 840, ,
Pipe Culvert @ Ch. 1060, 1350, 1770
Pipe Culvert@ Ch. 4400, 4620,
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For STEM as 10% Rate for Centering Works
Pipe Culvert@ Ch. 840, ,
Pipe Culvert @ Ch. 1060, 1350, 1770
Pipe Culvert@ Ch. 4400, 4620,
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Pipe Culvert@ Ch. 840, ,
Pipe Culvert @ Ch. 1060, 1350, 1770
Pipe Culvert@ Ch. 4400, 4620,
Providing and Laying reinforced Cement Concrete pipe NP3 for Culverts on first bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation protection works backfilling concrete and masonry works in head walls and parapets
Pipe Culvert@ Ch. 840, ,
Pipe Culvert @ Ch. 1060, 1350, 1770
Pipe Culvert@ Ch. 4400, 4620,
Construction of 2.0 m SPAN RCC Slab culvert at ch 5427
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.
Pipe culvert at : 5427
Removal of Pipes
Removal of Body wall
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
2.0m Culvert @ Ch. 5427,,
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
2.0m Culvert @ Ch. 5427,,
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed including centering and shuttering.
2.0m Culvert @ Ch. 5427,,
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directedFor Footings as 4% Rate for Centering Works
2.0m Culvert @ Ch. 5427,,
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directedFor Stem as10% Rate for Centering Works
2.0m Culvert @ Ch. 5427,,
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
2.0m Culvert @ Ch. 5427,,
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
2.0m Culvert @ Ch. 5427,,
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
2.0m Culvert @ Ch. 5427,,
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab
2.0m Culvert @ Ch. 5427,,
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
2.0m Culvert @ Ch. 5427,,
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
2.0m Culvert @ Ch. 5427,,
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
2.0m Culvert @ Ch. 5427,,
Construction of 2.0 m SPAN RCC Slab culvert at ch 5427
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.
Pipe culvert at : 5305
Removal of Pipes
Removal of Body wall
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
3.0m Culvert @ Ch. 5305,,
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
3.0m Culvert @ Ch. 5305,,
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed including centering and shuttering.
3.0m Culvert @ Ch. 5305,,
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.For Footings as 4% Rate for Centering Works
3.0m Culvert @ Ch. 5305,,
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For Stem as10% Rate for Centering Works
3.0m Culvert @ Ch. 5305,,
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
3.0m Culvert @ Ch. 5305,,
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
3.0m Culvert @ Ch. 5305,,
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
3.0m Culvert @ Ch. 5305,,
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab
3.0m Culvert @ Ch. 5305,,
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
3.0m Culvert @ Ch. 5305,,
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
3.0m Culvert @ Ch. 5305,,
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
3.0m Culvert @ Ch. 5305,,
Construction of 6.0 m SPAN RCC Slab culvert at ch 285
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.
Pipe culvert at : 285
Removal of Pipes
Removal of Body wall
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
6.0m Culvert @ Ch. 285,,
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
6.0m Culvert @ Ch. 285,,
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed including centering and shuttering.
6.0m Culvert @ Ch. 285,,
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For Footings as 4% Rate for Centering Works
6.0m Culvert @ Ch. 285,,
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For Stem as10% Rate for Centering Works
6.0m Culvert @ Ch. 285,,
Cement concrete 1 : 1.5 : 3 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed including centering and shuttering.
6.0m Culvert @ Ch. 285,,
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
6.0m Culvert @ Ch. 285,,
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab
6.0m Culvert @ Ch. 285,,
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
6.0m Culvert @ Ch. 285,,
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
6.0m Culvert @ Ch. 285,,
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
6.0m Culvert @ Ch. 285,,
Construction of 2 x 6.0 m SPAN RCC Slab culvert at ch 6210
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.
Removal of Pipes
Removal of Pipes
Removal of Body wall
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
2 x 6.0m Culvert @ Ch. 6210,,
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
2 x 6.0m Culvert @ Ch. 6210,,
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed including centering and shuttering.
2 x 6.0m Culvert @ Ch. 6210,,
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For Footings as 4% Rate for Centering Works
2 x 6.0m Culvert @ Ch. 6210,,
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For Stem as10% Rate for Centering Works
2 x 6.0m Culvert @ Ch. 6210,,
Cement concrete 1 : 1.5 : 3 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed including centering and shuttering.
2 x 6.0m Culvert @ Ch. 6210,,
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
2 x 6.0m Culvert @ Ch. 6210,,
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab
2 x 6.0m Culvert @ Ch. 6210,,
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
2 x 6.0m Culvert @ Ch. 6210,,
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
2 x 6.0m Culvert @ Ch. 6210,,
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
2 x 6.0m Culvert @ Ch. 6210,,
Construction of ,80,120,,,,, Retaining wall at ch,,1240,1350,,,,,
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Protective works@ Ch.1240 - 1320 LHS
Protective works@ Ch.1350 - 1470 RHS
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Protective works@ Ch.1240 - 1320 LHS
Protective works@ Ch.1350 - 1470 RHS
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Protective works@ Ch.1240 - 1320 LHS
Protective works@ Ch.1350 - 1470 RHS
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For Sub - Structure as 10% Rate for Centering Works
Protective works@ Ch.1240 - 1320 LHS
Protective works@ Ch.1350 - 1470 RHS
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, RETURN WALL, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing
Protective works@ Ch.1240 - 1320 LHS
Protective works@ Ch.1350 - 1470 RHS
Construction of Toe wall 280 0 260 50 70 0 metres at ch 660 0 3590 3850 4140 0 Respectively
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Protective works@ Ch.660 - 940 LHS
Protective works@ Ch.3590 - 3850 RHS
Protective works@ Ch.3850 - 3900 RHS
Protective works@ Ch.4140 - 4210 RHS
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Protective works@ Ch.660 - 940 LHS
Protective works@ Ch.3590 - 3850 RHS
Protective works@ Ch.3850 - 3900 RHS
Protective works@ Ch.4140 - 4210 RHS
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For Sub - Structure as 10% Rate for Centering Works
Protective works@ Ch.660 - 940 LHS
Protective works@ Ch.3590 - 3850 RHS
Protective works@ Ch.3850 - 3900 RHS
Protective works@ Ch.4140 - 4210 RHS
Maintenance of the road
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
KOP & CO
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .