| 1 | L1₹7.7 LAccepted-AOC | ₹7.7 L | L1 | Accepted-AOC Accepted |
| Sl No | Description | Qty | Unit | V.RADHAKRISHNAN&CO L1 |
|---|---|---|---|---|
| 1.00 | Labour charges for Pulling out/ Pulling in of Power/Auto Transformer from/to plinth to a distance of 20Mt approx. or as per actual including charge for all T&Ps for 1No of Y Phase (single phase unit) of 105 MVA Auto Transfromer at Sunguvanchatram 400 KV SS TON*MTR*RATE/MTE)= 112.4*20=2248 | 2,248 | MT/M | 31 ₹69,688 |
| 2.00 | Labour charges for Loading/unloading of 1No of Main Tank of ICT including raising and lowering of power transformer using suitable jacks as many times as required with or without accessories from Safe place to plinth | 112.4 | MT | 770 ₹86,548 |
| 3.00 | Labour charge for Erection of single phase 1. Y phase 105 MVA BHEL Make 400 ICT-II with Turret incuding all HV/IV/LV Bushings,Which involves TANDELTA Test, Bushing CT test by P&C wing,cooler bank ''A'' frame modification and minor modification in cooler assembly,Fan pumps, oil pipelines ,Marshalling box,RTCC panel and all accessories which ever is necessary for successful commissioning of the Transformer including crane charges | 1 | No | 60,500 ₹60,500 |
| 4.00 | Labour Charges for Oil Filing of Y Phase (single phase) unit 105 MVA Auto Transfromer. | 13,200 | P/Ltr | 0.75 ₹9,900 |
| 5.00 | Hot oil circulation of 1No of Y Phase (single phase) unit 105 MVA Auto Transfromer 400 /230KV ICT-II Transforme(single phase unit) main tank and OLTC as per the requirement of board officials till the required values are reached including charges of all T&Ps, filter machine lead, lift etc., complete. | 33,600 | lit | 2 ₹67,200 |
| 6.00 | Labour charge for laying of control cable in duct/trench the cost of aluminium Tag for identification.up to 8 core | 1 | km | 19,000 ₹19,000 |
| 7.00 | Labour charge for laying of control cable in duct/trench the cost of aluminium Tag for identification.Above 8 core | 1.5 | km | 23,000 ₹34,500 |
| 8.00 | Supply & Glanding of ISI Mark cable glands of suitable size reputed make including removing insulation of cable and providing suitable holes as directed by the field engineer. 19mm | 32 | Nos | 89 ₹2,848 |
| 9.00 | Supply & Glanding of ISI Mark cable glands of suitable size reputed make including removing insulation of cable and providing suitable holes as directed by the field engineer. 25mm | 30 | Nos | 110 ₹3,300 |
| 10.00 | Supply & Glanding of ISI Mark cable glands of suitable size reputed make including removing insulation of cable and providing suitable holes as directed by the field engineer. 28mm | 32 | Nos | 119 ₹3,808 |
Tender Value
Refer Docs
EMD Value
₹7,700
Closing Date
29 Dec 2025, 2:00 pmClosed
SE/GCC-II/CNI
Superintending Engineer, GCC II, 230 KV CMRL GIS SS, Alandur, Chennai-16
As per NIT
2025_EB_634873_1
LT-25/2025-26 of SE/GCC-II
Limited
Civil Works
120 days
Sunguvarchatram
Please refer tender documents
2 documents required · 2 mandatory
₹0
₹7,700
Yes
18 May 2026
20 Dec 2025
30 Dec 2025
20 Dec 2025
29 Dec 2025
20 Dec 2025
Labour charges for Pulling out/ Pulling in of Power/Auto Transformer from/to plinth to a distance of 20Mt approx. or as per actual including charge for all T&Ps for 1No of Y Phase (single phase unit) of 105 MVA Auto Transfromer at Sunguvanchatram 400 KV SS TON*MTR*RATE/MTE)= 112.4*20=2248
Labour charges for Loading/unloading of 1No of Main Tank of ICT including raising and lowering of power transformer using suitable jacks as many times as required with or without accessories from Safe place to plinth
Labour charge for Erection of single phase 1. Y phase 105 MVA BHEL Make 400 ICT-II with Turret incuding all HV/IV/LV Bushings,Which involves TANDELTA Test, Bushing CT test by P&C wing,cooler bank ''A'' frame modification and minor modification in cooler assembly,Fan pumps, oil pipelines ,Marshalling box,RTCC panel and all accessories which ever is necessary for successful commissioning of the Transformer including crane charges
Labour Charges for Oil Filing of Y Phase (single phase) unit 105 MVA Auto Transfromer.
Hot oil circulation of 1No of Y Phase (single phase) unit 105 MVA Auto Transfromer 400 /230KV ICT-II Transforme(single phase unit) main tank and OLTC as per the requirement of board officials till the required values are reached including charges of all T&Ps, filter machine lead, lift etc., complete.
Labour charge for laying of control cable in duct/trench the cost of aluminium Tag for identification.up to 8 core
Labour charge for laying of control cable in duct/trench the cost of aluminium Tag for identification.Above 8 core
Supply & Glanding of ISI Mark cable glands of suitable size reputed make including removing insulation of cable and providing suitable holes as directed by the field engineer. 19mm
Supply & Glanding of ISI Mark cable glands of suitable size reputed make including removing insulation of cable and providing suitable holes as directed by the field engineer. 25mm
Supply & Glanding of ISI Mark cable glands of suitable size reputed make including removing insulation of cable and providing suitable holes as directed by the field engineer. 28mm
Supply & Glanding of ISI Mark cable glands of suitable size reputed make including removing insulation of cable and providing suitable holes as directed by the field engineer. 32mm
Supply and Termination of cable core end including the cost of cable socket, lug, ferrules, strap etc., as per cable schedule. for R,B Phase single phase unit ICT.
Labour charges for attending oil leakages in power transformer for 400KV Class transformer
Labour charges for attending oil leakages in radiator and other places by welding bracing etc.,and checking healthiness after rectification as directed by the field engineer.
Labour charges for Overhauling and rewinding of Fans including replacement of bearings ,shafts washers etc.,
Labour charges for Overhauling and rewring of Oil Pumps including replacement of bearings ,shafts washers etc.,
Labour charges for Painting of 1No of Y Phase (single phase) unit 105MVA Auto Transfromer 400/ 230KV ICT Transforme(single phase unit) including supply of branded alumininum paint
Labour charges for letter writing /Stickeing of the power transformer/Auto tr/ICT/Reactor,marshalling box DM Box,RTCC Panel Cooler control cubical ,fan and pump etc., including material with dark blue enamel paint .Letter size should be minimum height 80mm and thickeness 10mm .Above 110KV Class
Supply and Labour charges for earthing of auto transformer/ICT ,Neutral at 2 points ,marshallingbox,DM Box cable box etc., M.S.Flat (75x12) supplied by the Contractor including transportation as directed by field engineer for Y Phase single phase unit .
Labour chargers for erection of light section structure including the cost of all labour,lead,lift etc., complete as directed by the Dept.Engineer at site. (Sectional weight below 14kg / mtr)
Supply and provision of various sizes of GI /Yellow bolts and Nuts , with washers and foundation bolts for cooler bank A frames Cooling pumps/pipes supports, Marshalling box cooler control cubicles and where ever necessary as per direction of the Field Engineer. Per KG ( M8,M9,M10,M12,M16, M 19, M 25)( SSE / other CNI Rates Item No S 2)
labour charge for erection of jumper and dropper for 3Nos of RYB Phase (single phase) unit 66.67 MVA Auto Transfromer 400 /110/33KV ICT Transforme(single phase unit) at Sriperumbudur 400KV SS
Labour charges for cleaning /released transformer including supply of wasing & cleaning materilals
Supply and provision of breather with indication type silica gel (Blue) 5Kg container with oil cup[ flange mounting type for or RYB Phase (single phase) 400/230 KV ICT Transforme(single phase unit)
Supply and provision of breather with indication type silica gel (Blue) 1Kg container with oil cup[ flange mounting type for or RYB Phase (single phase) unit 66.67 MVA Auto Transfromer 400 /110/33KV ICT Transforme(single phase unit)
Labour charges for skilled man power assistance during Busing CT Testing ,bushing TAN Delta ,pre commissioning testing of 400KV Auto Transformer .
Hire charges for crane for additional works in dismantling reassembly of accessories due to any defects /Oil leakages and Tan delta test etc.,
Supply and fixing of Gasket size (900x900x8mm).Erp code 300000086
Supply and fixing of view Glass.Erp code :5000045288
Supply and fixing of Mashalling Box door class beading
Supply and fixing of 220 V DC Contactors
Supply and fixing of AC Contactors(440V/230V )
Supply and fixing of 16A MCB 4 Pole
Supply and fixing of 32A MCB 3 Pole
Tap Position Indicators
Supply and fixing of Single phase preventers
Supply and fixing of Over load relay for fans /pumps
Supply and fixing of Terminal Block M4 Stud Type
Supply and fixing of Disconnecting Terminal Block M4 Stud Type
Supply and fixing of Timers
Supply and fixing of Indication LED Bulb 5w
Supply and fixing of WTI with contacts. Erp code 3000012111
Transport Empty Oil drum from Sunguvarchartram 400KV SS to store
GST for bidders outside TamilNadu (IGST)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.05 MB
BOQ_759695.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid