Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.8 LAdmitted-Finance | -49.90% | ₹8.8 L | L1 | Admitted-Finance |
| 2 | L2₹9.5 L+₹68,665.48 (7.80%)Admitted-Finance | -45.99% | ₹9.5 L+₹68,665.48 (7.80%) | L2 | Admitted-Finance |
| 3 | L3₹10.5 L+₹1.7 L (19.3%)Admitted-Finance | -40.21% | ₹10.5 L+₹1.7 L (19.3%) | L3 | Admitted-Finance |
| 4 | L4₹10.7 L+₹1.9 L (21.6%)Admitted-Finance | -39.10% | ₹10.7 L+₹1.9 L (21.6%) | L4 | Admitted-Finance |
| 5 | L5₹11.6 L+₹2.8 L (31.7%)Admitted-Finance | -34.00% | ₹11.6 L+₹2.8 L (31.7%) | L5 | Admitted-Finance |
Tender Value
₹17.6 L
EMD Value
₹35,120
Closing Date
11 Aug 2026, 4:00 pmClosed
ADGP Hqrs PHQ
Srinagar
Upgradation
2026_DGPJK_319264_1
e-NIT/EE-PCD/PHQ/60/2026-27
Open Tender
Civil Works
Percentage
75 days
Police Public School Bemina Srinagar
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,500
Exen PCD PHQ
₹35,120
13 Aug 2026
4 Aug 2026
12 Aug 2026
4 Aug 2026
11 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge In cement mortar | 93.28 | Cum | 1,458.45 | ₹1,36,044.22 |
| 2 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge 1:3:6 or richer mix (i/c equivalent design mix) | 49.16 | Cum | 1,725.2 | ₹84,810.83 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 32.44 | Cum | 5,733.6 | ₹1,85,997.98 |
| - | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 meters lead For thickness of tiles 10 mm to 25 mm | 322.56 | Sqm | 57 | ₹18,385.92 |
| - | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in 1 Cement mortar 1:4 ( 1 cement : 4 coarse sand) | 15.29 | Cum | 7,877.4 | ₹1,20,445.45 |
| - | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 10.25 | Cum | 1,455.65 | ₹14,920.41 |
| - | 15mm cement plaster on rough side of single or half Brick wall of mix: 1:6 mix (1 cement: 6 fine sand) | 234.12 | Sqm | 306.85 | ₹71,839.72 |
| - | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with.1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size). | 1.02 | Cum | 9,821.85 | ₹10,018.29 |
| - | Centering and shuttering including strutting, propping etc. and removal of form for Lintel, beams, plinth beams, girders, bressumers and cantilevers. | 8.92 | Sqm | 577.55 | ₹5,151.75 |
| - | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 160.05 | Kg | 123.2 | ₹19,718.16 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.20 MB
BOQ_1056561.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .