Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.2 LAccepted-AOC | ₹14.2 L | L1 | Accepted-AOC Lowest Rate quoted by bidder |
| 2 | L2₹14.8 LRejected-Finance | ₹14.8 L | L2 | Rejected-Finance Disqualified |
Tender Value
₹14.4 L
EMD Value
₹29,000
Closing Date
22 Apr 2026, 4:00 pmClosed
Executive Engineer
Executive Engineer D.W.and S Division1 Giridih
Construction of 125mm x 115mm dia. 70 mtrs deep (average) Drilled Tube Well with India Mark-II Hand Pump by DTH (FDS/ KPO/COPCO) Rig machine with 125mm dia. Blue UPVC casing pipe and construction of Platform and drain on turn key basis .
2026_DWSD_112882_1
DWSD/Relocation D/T/Giridih-1/ 06 /2026-27 (1st Call)
Open Tender
Civil Works
30 days
Giridih
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,500
₹29,000
Yes
3 Jun 2026
15 Apr 2026
23 Apr 2026
15 Apr 2026
22 Apr 2026
15 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Drilling Portion
Basic rates for 115/125 mm dia drilled Tube-Well for drilling in all kinds of soil rock for installation of hand pump with D.I. Rings all complete including supplying all materials, labours, tools, drilling, rigs, air compressor and equipments as well as fuel lubricant, transporting rig machine and other vehicle up to site work including contractor profit & O.H charges as per specification and direction of Engineer-in-charge for year 2022-2023. | - | - | - | - | BI01010001010000000000000515BI0100001112 |
| 2 | (a) Up to 30mtr. Depth bellow G.L. in Rural Areas | - | P/M | - | - | BI01010001010000000000000515BI0100001113 |
| 3 | (b) Beyond 30mtr. Up to 70 mtr. In Rural Areas | - | P/M | - | - | BI01010001010000000000000515BI0100001114 |
| 4 | Providing all equipments and labour for lowering 125mm dia UPVC Casing pipe as casing for protecting the side from falling during the process of drilling all complete including carriage to site. | - | P/M | - | - | BI01010001010000000000000515BI0100001115 |
| 5 | Supplying labour cement and calcium chloride or bentonite solution and equipments for Grouting to Casing Pipe. | - | Each | - | - | BI01010001010000000000000515BI0100001116 |
| 6 | Supplying all tools, equipments and labour for flushing, washing, and developing of drilled tube well to give clean and clear water all complete job as per direction of E/I. | - | Per Hr. | - | - | BI01010001010000000000000515BI0100001117 |
| 7 | Supplying all materials labours and equipment including 125 mm dia GI Cap/CI Cap and fitting and fixing the GI Cap/CI Cap over the casting of 125 mm dia T/W properly all complete | - | Each | - | - | BI01010001010000000000000515BI0100001118 |
| 8 | Civil Portion
Supplying all tools, equipment and labours and lowering 32 mm dia medium quality G.I.pipe in drilled tube well in 3 Mtrs. Length all complete job as per direction of E/I. | - | Per M | - | - | BI01010001010000000000000515BI0100001119 |
| 9 | Supplying all tools, Labour for fitting and fixing deep well cylinder with necessary connecting rod complete job as per specification & direction of E/I. | - | nos. | - | - | BI01010001010000000000000515BI0100001120 |
| 10 | Supplying all materials ,labours and fixing India mark II Hand Pump with all accessories all complete job as per direction of E/I | - | Each | - | - | BI01010001010000000000000515BI0100001121 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
BOQ_152441.xls
BOQ • 0.35 MB
TermConditions.pdf
Tender Documents • 1.21 MB
Download all tender documents and submit your bid