Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 CrAccepted-AOC NO 18 A KACHI MADA STREET NEAR ALWAR BANGULOW KANCHIPURAM 631 502 | KANCHIPURAM | KANCHIPURAM | TAMIL NADU | 631502 | ₹3.3 Cr Quoted ₹3.5 Cr | L1 | Accepted-AOC Accept |
| 2 | L2₹3.8 Cr+₹28.7 L (8.27%)Accepted-AOC NO 1 80 1ST FLOOR CHELLAMMAL PANDIYAN ILLAM 3RD STREET SATHYAVATHY NAGAR PADI NEAR BSNL CHENNAI 600044 | CHENGALPATTU | TAMIL NADU | 600044 | ₹3.8 Cr+₹28.7 L (8.27%) | L2 | Accepted-AOC Reject |
Tender Value
₹3.2 Cr
EMD Value
₹2.5 L
Closing Date
6 Nov 2023, 3:00 pmClosed
Chief Engineer, TWAD, Vellore
No.8 First East Main Road, Gandhi Nagar, Vellore-6
Nandivaram guduvancheri
2023_TWAD_382581_1
IFB17ngcpt171023
Open Tender
Civil Works
Item Rate
180 days
Chengalpattu
Refer bid document
4 documents required · 4 mandatory
₹0
₹2.5 L
Vellore
9 Feb 2024
27 Oct 2023
7 Nov 2023
27 Oct 2023
6 Nov 2023
27 Oct 2023
27 Oct 2023
Amount
Improvement to Headworks in RiverPalar and Restorationof Pumping main under CWSS to Nandhivaram - Guduvanchery & 29 other Habitations in Chengalpattu District. Period of Execution - 12 Months – Trial run period – 6 Months and maintenance - 12 Months.
supply, delivery and erection of open well submersible pumpsets for Proposed IW , 25sqmm & 35sqmm 3 core aluminium armourted cable including jointing materials
Supply delivery and erection of open well. Submersible pumpset for the existing IW , 35Sqmm 3 core Aluminium armoured cable. Including the jointing materials , Genset service at Mamandur HW, Paranur BS
Supply, delivery laying and jointing of connecting main 150mm DI D/F Pipe including Anchoring arrangements for proposed BW , Infiltration wells, Inter connection works, rejunevation of existing Infiltration wells
Restoration of Damaged Pumping main in River portion 300mm DI D/F pipe under Mamandur bridge, Pazhaveli, Kolavaai eri with anchorage arrangements
Restoration of Pumping main from Valliammai college to Guduvancherry Pumping main damaged in the GST road
Painting of Headworks, Booster station Pumproom and allied works
Annual Maintenance of the scheme - 3 Months
Sub Total
GST in 18%
Aiga Engineers Pvt Ltd
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .