| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹165.6 CrAccepted-AOC 142 | ₹165.6 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹180.7 CrRejected-Finance AHEMDABAD B WING 15TH FLOOR PRIVILON BUILDING VIKRAM NAGAR AMBALI BOPAL ROAD BEHIND ISCONTAMPLE AHEMDABAD 380058 GUJRAT INDIA | AHMADABAD | GUJARAT | 380058 | ₹180.7 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹191.7 CrRejected-Finance 6 OM COMPLEX BHUJ BHACHAU BYPASS DABDA ROAD ANJAR KUTCH 370110 | ANJAR | KUTCH | GUJARAT | 370110 | ₹191.7 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹204.6 CrRejected-Finance 2ND FLOOR MODERN PROFOUND TECH PARK PLOT NO 202 P 203 P 204 P SY NO 12 KONDAPUR HYDERABAD 500084 K V RANGAREDDY DIST TELANGANA INDIA | HYDERABAD | TELANGANA | 500084 | ₹204.6 Cr | L4 | Rejected-Finance L4 |
Tender Value
₹227.5 Cr
EMD Value
₹4.6 Cr
Closing Date
13 Feb 2025, 2:00 pmClosed
SE KEN-BETWA LINK CANAL CONSTRUCTION CIRCLE BANDA
SUPERINTENDING ENGINEER KEN-BETWA LINK CANAL CONSTRUCTION CIRCLE BANDA IRRIGATION AND WATER RESOURCES DEPARTMENT UTTAR PRADESH
Restoration of Atarra Branch from km. 0.000 to 39.228, Baberu Dy from km. 0.000 to km. 31.248 and Kamasin Dy from km. 0.000 to km. 32.992 in restoration of Ken Canal System under Ken-Betwa Link Project
2025_UPIDC_989952_3
03/SE/2024-25
Open Tender
Civil Works - Canal
1095 days
BANDA
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,354
₹4.6 Cr
ACEO Ken-Betwa Link Canal Construction Jhansi
31 Mar 2025
4 Jan 2025
13 Feb 2025
4 Jan 2025
13 Feb 2025
4 Jan 2025
15 Jan 2025
Amount
Earth Work in cutting for making Canal section in all types of soil including lead upto 30.00 m, lift upto 1.50 m and disposal of surplus earth to spoil banks with manual compaction & dressing to profile required for proper completion of work including cost of all labour, T&P etc.
Earth Work in filling for making Atarra Branch Canal Section from earth borrowed from Private Land with lead upto 1.00 km by power transport and lift up to 1.50 m with manual compaction & dressing to profile required for proper completion of work including cost of all labour, T&P etc.
Earth Work in filling for making Atarra Branch Canal Section from earth borrowed from Private Land with lead upto 3.00 km by power transport and lift up to 1.50 m with manual compaction & dressing to profile required for proper completion of work including cost of all labour, T&P etc.
Earth Work in filling for making Baberu Dy & Kamasin Dy Canal Section from earth borrowed from Private Land with lead upto 1.00 km by Power Transport and lift up to 1.50 m with manual compaction & dressing to profile required for proper completion of work including cost of all labour, T&P etc.
Earth Work in filling for making Baberu Dy & Kamasin Dy Canal Section from earth borrowed from Private Land with lead upto 3.00 km by Power Transport and lift up to 1.50 m with manual compaction & dressing to profile required for proper completion of work including cost of all labour, T&P etc.
Earth Work in excavation of foundation in all types of soil including lead upto 30.00 m and lift up to 1.50 m including filling, watering, ramming, of excavated earth into the trenches or upto the space and sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge upto a distance of 30.00 m from the foundation trenches including cost of all labour, T&P etc.
Earth Work in filling for making Diversion/Approach Road/Ramp with carriage upto 1.00 km by power transport and lift up to 1.50 m manual compaction & dressing to profile required for proper completion of work including cost of all labour, T&P etc.
Centering & shuttering for C.C. work in different parts of structures with all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, T&P etc
Centering & shuttering for R.C.C. work in different parts of structures with all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, T&P etc.
Centering & shuttering for special type of R.C.C. syphons and pump houses in different parts of structures with all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, T&P etc.
Cutting Bending Binding and placing TMT steel bars for reinforcement with cost of binding wire in all structures required for proper completion of work including cost of all materials, labour, T&P etc.
Filling/Laying Local Sand in Bed & Side slope required for proper completion of work including cost of all material, labour, T&P etc.
Laying C.C A40, M-10 in foundation of all structures with cement, coarse sand of F.M. not less than 2.0 and hard stone ballast including lead upto 60.00 m, lift upto 3.00 m, mechanical mixing with Mixing/Batching Plant & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work, including cost of all material, labour, T&P and transportation of concrete from Mixing/Batching Plant to work site.
Laying C.C. A20, M-15 with cement, coarse sand of F.M. not less than 2.0 and crushed stone grit 4.75 mm to 20 mm size including lead upto 60.00 m, lift upto 3.00 m, mechanical mixing with Mixing/Batching Plant & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material, labour, T&P and transportation of concrete from Mixing/Batching Plant to work site.
Laying C.C. A20, M-20 with cement, coarse sand of F.M. not less than 2.0 and crushed stone grit 4.75 mm to 20 mm size including lead upto 60.00 m, lift upto 3.00 m, mechanical mixing with Mixing/Batching Plant & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material, labour, T&P and transportation of concrete from Mixing/Batching Plant to work site.
Laying R.C.C. A20, M-25 with cement, coarse sand of F.M. not less than 2.0 and crushed stone grit 4.75 mm to 20 mm size including lead upto 60.00 m, lift upto 3.00 m, mechanical mixing with Mixing/Batching Plant & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material, labour, T&P and transportation of concrete from Mixing/Batching Plant to work site.
Dewatering with all cost of Power/P.O.L, machines, pumps, well point system and operator with boring, assembling and dismantling of equipments etc. required for completion of work.
Supplying and laying rubber seal 225 mm width and 10 mm thickness at joints required for proper completion of work including cost of all materials, labour, T&P etc.
Providing and fixing with making diamond copper seal in settlement joint or as in required location as per approved Drawing (shape and size) required for proper completion of work including cost of all materials, labour, T&P etc.
Providing and fixing G.P.-seal 20 gauge in different structures at required locations as per approved drawing (shape and size) required for proper completion of work including cost of all materials, labour, T&P etc.
Providing and fixing in position 12mm thick bitumen impregnated fiber board conformin IS - 1838, including cost of primer, sealing compound Grade-A in expansion joints
Two coats of bitumen painting with two layers of tarfelt again followed by two coats of bitumen painting before laying R.C.C. slab required for proper completion of work including cost of all materials, labour, T&P etc.
Providing expansion joint in R.C.C. slab including placing and fixing of angle iron & MS Plate and filling with sealing compound as per drawing required for proper completion. of work, including cost of all materials, labour, T&P etc.
S/F Drainage spout pipe 100 mm dia in RCC slab required for proper completion of work including cost of all materials, labour, T& P etc.
Supplying and fixing 1200 mm dia NP-3 hume pipe required for proper completion of work including cost of all materials, labour, T&P etc.
Supplying and driving "Z" "type sheet piles of required size in different structures with cutting, welding including cost of all materials, labour, T&P etc.
Brick on Edge Soling on approach road, diversion and ramp with preparation of subgrade and filling joints with local earth required for proper completion of work including cost of all materials, labour, T&P etc.
Dismantling Brick on Edge Soling on diversion including stacking required for proper completion of work with cost of all labour, T&P etc.
Relaying with dismantled Brick on Edge Soling on approach road, diversion and ramp with preparation of subgrade and filling joints with local earth required for proper completion of work including cost of all materials, labour, T&P etc.
Brick work in 1:4 cement mortar with 1st Class Brick, coarse sand of F.M. not less than 2.0 required for proper completion of work including cost of all materials, labour, T&P etc.
Providing & Laying R.C.R. 1 : 4 Cement Sand Mortar required for proper completion of work including cost of all materials, labour, T&P etc.
Struck Raised Pointing on stone masonry in C.M. 1 : 2 required for proper completion of work including cost of all material T&P, labour etc.
Struck Deep Pointing on Brick masonry in C.M. 1 : 2 required for proper completion of work including cost of all materials, labour, T&P etc.
Filling/Laying Coarse sand as a filter material required for proper completion of work including cost of all materials, labour, T&P etc.
Laying stone grit 10-20 mm gauge as a filter material required for proper completion of work including cost of all materials, labour, T&P etc.
Supply & laying of stone grit 20-40 mm gauge as a filter material required for proper completion of work including cost of all materials, labour, T&P etc.
Providing & Laying Boulder Apron for Bed protection with stone boulder required for proper completion of work including cost of all materials, labour, T&P etc.
Laying Boulder Apron for Bed protection with old stone boulder taken from demolished structure required for proper completion of work including cost of all materials, labour, T&P etc.
Preparation of Subgrade below lining required for proper completion of work including cost of all materials, labour, T&P etc.
Filling/Laying Coarse sand as a filter material below lining required for proper completion of work including cost of all materials, labour, T&P etc.
Laying Cement plaster 12.50 mm thick in 1:6 Cement Sand mortar required for proper completion of work including cost of all materials, labour, T&P etc.
Supplying/Laying two coat Bitumen painting on sleeper top with cost of Bitumen, fuel for heating required for proper completion of work including cost of all materials, labour, T&P etc.
Supply & laying of 200 micron L.D.P.E film over plaster work required for proper completion of work including cost of all materials, labour, T&P etc.
Providing & Laying 100 mm thick Cement Concrete Lining in A20, M-20 with 4.75 mm to 20 mm hard stone grit and coarse sand of F.M. not less than 2.0 by Paver Machine on Bed and Side Slope required for proper completion of work including cost of all materials, labour, T&P etc.
Making construction joint in lining & filling sealing compound in joint required for proper completion of work including cost of all materials, labour, T&P etc.
Dismentling of existing Grouted stone pitching/Lining including disposal of unserviceable material and stacking the serviceable material etc
Demolishing Stone rubble masonry in cement mortar manually/ by mechanical means Including disposal of material within 50 metres lead as per direction of Engineer-in-charge
Demolishing R.C.C. work manually/ by mechanical means Including disposal of material within 50 metres lead as per direction of Engineer-in-charge
Earth Work in Dismantling of Diversion/Approach Road/Ramp (Head Discharge above 6.00 Cumec) required for proper completion of work including cost of all labour and T&P etc.
Earth Work in Dismantling of Diversion/Approach Road/Ramp (Head Discharge below 6.00 Cumec) required for proper completion of work including cost of all labour and T&P etc.
LCC Projects Limited (BID ID -4948530)
VELJI RATNA SORATHIA INFRA PVT. LTD (BID ID -4948968)
Gaja Engineering Private Limited (BID ID -4950591)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf