Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.4 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹9.5 L+₹11,325.60 (1.20%)Rejected-Finance NIVASI MAIN TIRAHA KE PAS SANT NAGAR DISTRICT FIROZABAD | FIROZABAD | UTTAR PRADESH | 224172 | 2 | Rejected-Finance L3 | |
| 3 | 3₹9.7 L+₹25,264.30 (2.68%)Rejected-Finance | 3 | Rejected-Finance L2 | |
| 4 | Rejected-Technical MUGALGARHI MAJRA FULRAI TEHSEEL SIKANDRARAO HATHRAS | - | Rejected-Technical IDT-3 NOT CORRECT |
Tender Value
₹11.2 L
EMD Value
₹1.1 L
Closing Date
17 Feb 2024, 1:00 pmClosed
Executive Engineer
Irrigation Division, Firozabad
Construction of retaining wall in between km 23.890 to km 23.950 in Haider Nagar Dy.
2024_UPIDC_894852_6
07/EE/2023-24
Open Tender
Civil Works
Item Wise
45 days
EE, ID, Firozabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹856
Executive Engineer
₹1.1 L
12 Mar 2024
12 Feb 2024
17 Feb 2024
12 Feb 2024
17 Feb 2024
12 Feb 2024
Amount
Eartwork in filling for making or removing bundha in all types of soil ,proper dressing & compaction including initial lift and lead i/c all cost of labour,T&P etc.
Earthwork in foundation in dry ordinary soil i/c initial lead and lift i/c back filling, watering and ramming of excavated earth into the structure and the sides of foundation trenches i/c all cost of labour T & P- etc.
PCC. 1:3:6(M10) in cement, coarse sand and stone grit for foundation footing including all cost of labour, material, T&P, etc. for proper completion of work
Ist class brick work (M 150) in 1:4 cement mortar i/c all cost of material and labour T & P for proper completion of work
Cement Pointing (stuck deep) on brick masonry with 1:2 Cement Mortar including all cost of labour, material, T & P, etc. for proper completion of work
Centering and shuttering of C.C work including all cost of labour, T & P, etc for proper completion of work
CC.1:1½:3(M20) in cement, coarse sand and stone grit in bed including all cost of labour, material, T&P, etc. for proper completion of work
Earthwork in strenghthening of damage bank including proper ramming and dressing with 200 m. lead and lift of 1.5 m including all cost of labour T & P etc.
Finishing Walls with Acrylic Smooth exterior paint (Apex) of required shade including all cost of labour, material, T&P, etc. for proper completion of work
Supply & fixing 90 mm dia perforated pvc pipe in weep holes on side slope including all cost of labour, material, T&P, etc. for proper completion of work.
Supply & laying corse sand for weep holes including all cost of labour, material, T&P, etc. for proper completion of work.
Supply & laying 10-20 mm grit for weep holes including all cost of labour, material, T&P, etc. for proper completion of work.
M/S JAI DURGE MAA CONTRACTOR
M/s CHANDRA PAL SINGH
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .