| 1 | 1₹6.6 LAccepted-AOC D NO 4 6 92 PERIYAR NAGAR THANGAMAPURIPATTINAM METTUR DAM 636402 | METTUR DAM | SALEM | TAMIL NADU | 636402 | ₹6.6 L Quoted ₹5.6 L | 1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | ARR AND CO L1 |
|---|---|---|---|---|
| 1.00 | Labour charges for welding eroded initial welding joints in the flue gas duct above 2 Meter level | 400 | Mtr | 160 ₹64,000 |
| 2.00 | Charges for transporting of 6mm M.S./ Chequred plates from Central Stores/MTPS to Boiler area, cutting into required size,leading, lifting, positioning on the eroded portions of above 1.5 meter side wall portion of the duct. | 20 | M2 | 1,707 ₹34,140 |
| 3.00 | Charges for renewal / reconditioning of 1 No. flange at bottom of hopper, man hole doors, poking hole, heating chamber, provided & removal of working platforms on hopper and related equipment. | 8 | Nos. | 21,714 ₹1,73,712 |
| 4.00 | Insulation work:a) providing scaffolding arrangement at Boiler area for removal and re-insulation | 250 | M2 | 183 ₹45,750 |
| 5.00 | b)Removal of insulation wool mattress and putting back with new / same wool mattress after cutting to the required contour shape. | 250 | M2 | 305 ₹76,250 |
| 6.00 | c) Removal of deteriorated G.I sheets and re fixing the new /same G.I.sheets after fabricating to the required contour shape, making grooves and tightening with lock screws (1/4”) | 250 | M2 | 323 ₹80,750 |
| 7.00 | d) Removing the GI strips and retainer plates and providing back with new / same strips and retainer plates | 250 | M2 | 85 ₹21,250 |
| 8.00 | Cutting gas | 1 | Set | 3,635 ₹3,635 |
| 9.00 | Welding Rod | 122 | Kgs | 443 ₹54,046 |
| 10.00 | T & P'S and Consumable | 1 | LS | 7,802 ₹7,802 |
Tender Value
Refer Docs
EMD Value
₹6,700
Closing Date
12 Aug 2025, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS 1 BM Unit IV AOH 2025 26 ESP AB CD E and F Pass Hoppers strengthening of the welding joints patch welding the eroded portions and other related works etc
2025_EB_586664_1
CE / MTPS-I / SE / M-I / BM /OT.184 / 2025-26
Open Tender
Power/Energy Projects/Products
20 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹6,700
Yes
30 Jan 2026
29 Jul 2025
13 Aug 2025
29 Jul 2025
12 Aug 2025
29 Jul 2025
Amount
Labour charges for welding eroded initial welding joints in the flue gas duct above 2 Meter level
Charges for transporting of 6mm M.S./ Chequred plates from Central Stores/MTPS to Boiler area, cutting into required size,leading, lifting, positioning on the eroded portions of above 1.5 meter side wall portion of the duct.
Charges for renewal / reconditioning of 1 No. flange at bottom of hopper, man hole doors, poking hole, heating chamber, provided & removal of working platforms on hopper and related equipment.
Insulation work:a) providing scaffolding arrangement at Boiler area for removal and re-insulation
b)Removal of insulation wool mattress and putting back with new / same wool mattress after cutting to the required contour shape.
c) Removal of deteriorated G.I sheets and re fixing the new /same G.I.sheets after fabricating to the required contour shape, making grooves and tightening with lock screws (1/4”)
d) Removing the GI strips and retainer plates and providing back with new / same strips and retainer plates
Cutting gas
Welding Rod
T & P'S and Consumable
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid