Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.7 LAccepted-AOC 77 2 1 LENIN SARANI KOLKATA 700013 | KOLKATA | KOLKATA | WEST BENGAL | 700013 | L1 | Accepted-AOC L1 | |
| 2 | L2₹12.8 L+₹6,336 (0.50%)Rejected-Finance HATIARA SHARIF ROAD P O HATIARA KOLKATA 700157 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700157 | L2 | Rejected-Finance Higher than L1 | |
| 3 | L3₹12.8 L+₹11,448 (0.90%)Rejected-Finance 00 MAA KALI ENTERPRISE NEW ROAD KULTI BARDHAMAN WEST BENGAL 713343 | PASCHIM BARDHAMAN | WEST BENGAL | 713343 | L3 | Rejected-Finance Higher than L1 |
| Sl No | Description | Qty | Unit | D K ELECTRIC L1 | GLACIER ENGINEERING CO L2 | MAA KALI ENTERPRISE L3 |
|---|---|---|---|---|---|---|
| 1.00 | PART - A
Labour charged for 1 (One) no. operating personnel for operation & guarding of Pump/ Valve/ Disinfection arrangement with all accessories
w.e.f. 01.01.2024 to 31.12.2024
For Sarda P.H - I | 366 | days | 580 ₹2,12,280 Lowest | 584 ₹2,13,744 | 587 ₹2,14,842 |
| 1.10 | For Sarda P.H - II | 366 | days | 580 ₹2,12,280 Lowest | 584 ₹2,13,744 | 587 ₹2,14,842 |
| 1.20 | For Sarda P.H - III | 366 | days | 580 ₹2,12,280 Lowest | 584 ₹2,13,744 | 587 ₹2,14,842 |
| 1.30 | For Sarda P.H - IV | 366 | days | 580 ₹2,12,280 Lowest | 584 ₹2,13,744 | 587 ₹2,14,842 |
| 2.00 | PART - B
Supervision charges for electrical installation by licensed electrician as per IE Rules, 1956 read with latest amendments with overhead expenditure
w.e.f. 01.01.2024 to 31.12.2024
For Sarda P.H - I | 12 | month | 8,765 ₹1,05,180 Lowest | 8,775 ₹1,05,300 | 8,790 ₹1,05,480 |
| 2.10 | For Sarda P.H - II | 12 | month | 8,765 ₹1,05,180 Lowest | 8,775 ₹1,05,300 | 8,790 ₹1,05,480 |
| 2.20 | For Sarda P.H - III | 12 | month | 8,765 ₹1,05,180 Lowest | 8,775 ₹1,05,300 | 8,790 ₹1,05,480 |
| 2.30 | For Sarda P.H - IV | 12 | month | 8,765 ₹1,05,180 Lowest | 8,775 ₹1,05,300 | 8,790 ₹1,05,480 |
Tender Value
Refer Docs
EMD Value
₹27,249
Closing Date
30 Nov 2023, 6:00 pmClosed
Executive Engineer ELectrical Divn PHE Dte.
P16 India Exchange Place CIT Annexe Bldg Extn 2nd floor Kol 73
E/M works
2023_PHED_573385_90
WBPHED / EE / ED / 18 / 2023-24
Open Tender
Electrical Work/ Equipment
Item Rate
366 days
Office of the Executive Engineer ED PHED
Please refer Tender documents.
6 documents required · 6 mandatory
₹27,249
Yes
15 Jan 2026
23 Sept 2023
4 Dec 2023
23 Sept 2023
30 Nov 2023
23 Sept 2023
Amount
PART - A Labour charged for 1 (One) no. operating personnel for operation & guarding of Pump/ Valve/ Disinfection arrangement with all accessories w.e.f. 01.01.2024 to 31.12.2024 For Sarda P.H - I
For Sarda P.H - II
For Sarda P.H - III
For Sarda P.H - IV
PART - B Supervision charges for electrical installation by licensed electrician as per IE Rules, 1956 read with latest amendments with overhead expenditure w.e.f. 01.01.2024 to 31.12.2024 For Sarda P.H - I
For Sarda P.H - II
For Sarda P.H - III
For Sarda P.H - IV
GLACIER ENGINEERING CO
MAA KALI ENTERPRISE
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .