Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.9 LAccepted-AOC | ₹11.9 L | L1 | Accepted-AOC Lowest |
| 2 | L2₹11.9 LRejected-Finance | ₹11.9 L | L2 | Rejected-Finance Hiest |
| Sl No | Description | Qty | Unit | V RAVIKUMAR L2 | P ARUMUGAM L1 |
|---|---|---|---|---|---|
| 1.00PROVIDING CC PAVEMENT WITH RETAINING WALL AT CAROLINA H/O HUBBATHALAI IN COONOOR PANCHAYAT UNION 2025-2026 | |||||
| 1.10 | Earth work excavation for foundation in SDR soil with in initial lead of 10 metres and initial lift of 2 metres and clearing, leveling the site etc. complete complying with standard specifications. | 51.3 | Cum | 372 ₹19,083.60 | 369 ₹18,929.70 |
| 1.20 | Cement Concrete 1:3:6 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 80.63 | Sqm | 7,648 ₹6.2 L | 7,643 ₹6.2 L |
| 1.30 | Supplying and erecting centering for sides and soffits including supports and strutting upto 3.29m height for plane surface in all floors with Cross bracings using mild steel sheets of size 90cms x 60cm and 10 gauge stiffened welded with mild steel angles of size 25mm x 25mmx3mm for boarding laid over silver oak (Country wood) Joists of size 10cm x 6.5 cm dia spaced at about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre etc complete complying with standard specification and as directed for the following items. | 45 | Cum | 740 ₹33,300 | 737 ₹33,165 |
| 1.40 | Cement Concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges, centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 38.25 | Cum | 8,750 ₹3.3 L | 8,744 ₹3.3 L |
| 1.50 | Provision for Name Board and Photographic Charge | 1 | LS | 2,600 ₹2,600 | 2,500 ₹2,500 |
| 1.60 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 1,81,139 ₹1.8 L | 1,80,955 ₹1.8 L |
Tender Value
₹12 L
EMD Value
₹12,000
Closing Date
26 Sept 2025, 3:00 pmClosed
BDO COONOOR
BDO COONOOR
PROVIDING CC PAVEMENT WITH RETAINING WALL AT CAROLINA H/O HUBBATHALAI PANCHAYAT
2025_RDTN_605379_1
hpcnr2023-2024
Open Tender
Civil Works
Carolina, Hubbathalai
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹12,000
Yes
PANCHAYAT UNION COONOOR
11 Mar 2026
18 Sept 2025
26 Sept 2025
18 Sept 2025
26 Sept 2025
18 Sept 2025
22 Sept 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid