Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance 160 PILLAIYAR KOIL STREET ANGARAYALLUR VILLAGE NARASINGARAYANPETTAI SENJI 604 202 | SENJI | VILLUPURAM | TAMIL NADU | 604202 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹19.0 L
EMD Value
₹20,000
Closing Date
27 Jul 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Director
DRDA, VPM
3 No.of Creation upgradation of Streets and Lanes in Habitation in Kadali, Sitheri Panchayat(s) of Melmalayanur Block under AGAMT II 2021-22- Package No. TNVPM/AGAMTII/209
2022_RDTN_241124_1
TNVPM/AGAMTII/209
Open Tender
Civil Works
Works
180 days
Viluppuram
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹20,000
Yes
27 Jul 2022
12 Jul 2022
27 Jul 2022
12 Jul 2022
27 Jul 2022
12 Jul 2022
90 days
Amount
Providing CC Pavements(117m) @ Mariyamman koil Street in Kadali Panchayat
Earth work excavation for foundation in all classes of soils except hard rock requiring blasting with initial lead and lift etc including levelling the site etc. complete with standard specification in hard stiff cllay, black cotton soil, hard fred earth, shale murums, gravel stoneyearth, and earth mixed with 50 % fair sized boulders, and hard graveily soil, in foundation.as per SS 20 B
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc complete.
Centering charges for corewall including all cost of labour charges
Cement Concrete 1:2:4 Using 20mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc complete.
Provision for photographic charges & display board
Provision for Bituminous Pad
Providing CC Pavements(105m) @ Abdulkalam Nagar in Kadali Panchayat
Earth work excavation for foundation in all classes of soils except hard rock requiring blasting with initial lead and lift etc including levelling the site etc. complete with standard specification in hard stiff cllay, black cotton soil, hard fred earth, shale murums, gravel stoneyearth, and earth mixed with 50 % fair sized boulders, and hard graveily soil, in foundation.as per SS 20 B
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc complete.
Centering charges for corewall including all cost of labour charges
Cement Concrete 1:2:4 Using 20mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc complete.
Provision for photographic charges & display board
Provision for Bituminous Pad
Providing CC Pavement (73m) and Culvert of Span (1.50M) @ Sitheri Panchayat
CC Pavement (73m) @ Sitheri Panchayat
Earth work excavation for foundation in all classes of soils except hard rock requiring blasting with initial lead and lift etc including levelling the site etc. complete with standard specification in hard stiff cllay, black cotton soil, hard fred earth, shale murums, gravel stoneyearth, and earth mixed with 50 % fair sized boulders, and hard graveily soil, in foundation.as per SS 20 B
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc complete.
Centering charges for corewall including all cost of labour charges
Cement Concrete 1:2:4 Using 20mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc complete.
Provision for photographic charges & display board
Provision for Bituminous Pad
Culvert of Span (1.50M) @ Sitheri Panchayat
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Centering and shuttering for footing including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed .
Centering and shuttering for footing including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed .
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For Abutment as 10% Rate for Centering Works
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For Abutment as 10% Rate for Centering Works
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kr
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Citiaen Information board
Provision forPhotographic charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
TDR and Co
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .