Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.8 LAccepted-AOC | L1 | Accepted-AOC The L1 Bidder issued of AOC | |
| 2 | L2₹16.8 L+₹300.65 (0.02%)Rejected-AOC | L2 | Rejected-AOC L2 Bidder Rejected |
Tender Value
Refer Docs
EMD Value
₹15,350
Closing Date
7 Dec 2023, 2:00 pmClosed
CE/NCTPS-I
North Chennai Thermal Power Station I, Chennai 600 120
AHP Dn Breakdown and shutdown Maintenance works in Ash slurry disposal pumps Pump capacity of 930 m3hr Ash water pumps, Seal water pumps, Flushing water pumps, Drain pumps and sea water Booster pumps slurry line valves make up line valves CB pipes an
2023_EB_392581_1
CE/NCTPSI/SE/MII/Sp.No94/23-24
Open Tender
Power/Energy Projects/Products
Works
101 days
Work
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹15,350
Yes
9 Oct 2024
24 Nov 2023
8 Dec 2023
24 Nov 2023
7 Dec 2023
24 Nov 2023
Amount
ASH SLURRY DISPOSAL PUMP: Removing the suction pipe, discharge pipes and decouping from the motor by removing the V -belt and dismantie the pump internals then remove the bearing housing from bad, open and inspection of bearings, Bearing bed, shaft, outer casing, inner casing impeller, expeller, wear plates, gland housing, sleeve and liquid thrower, including consumables and T&P’s
ASH SLURRY DISPOSAL PUMP: Rectification the suction side cover, bracket side cover seating area of outer casing and renew the above items and re-assemble back. Fix the suction and discharge pipe and V-belts and commissioning the pump. Including consumables and T&P’s.
SUCTION / DISCHARGE VALVE FOR ASH SLURRY DISPOSAL PUMP:Removal of 336 dia slurry line valve from the line, and reconditioning the worn out portion of valve body and gate. Including consumables and T&P’s.
SUCTION / DISCHARGE VALVE FOR ASH SLURRY DISPOSAL PUMP:Fixing in the 336 dia slurry line valve in the line. Including consumables and T&P’s.
ASH SLURRY DISPOSAL LINE:Renewal of worn out punctured cast basalt pipe end by fabricated distance piece of required length (below 6.0 mtr.) in Ash slurry disposal line 406 OD, and grinding and welding with flange and fixed. Including consumables and T&P’s.
ASH SLURRY DISPOSAL PUMP: Removing the suction pipe and removing the outer casing and removing the foreign materials and reassembling. Including consumables and T&P’s.
ASH SLURRY DISPOSAL PUMP: Renewal of V-belts / tightening the V-belts in Ash slurry disposal pump. Including consumables and T&P’s.
ASH WATER PUMP: Decoupling the Ash water pump dismantling the pump casing pump internals, inspection of impeller, shaft, wear ring shaft sleeves, bearings, lock nut and metal filling in the worn out area of upper & lower casing and impeller hub and grinding, renew the above items and assemble back. Including consumables and T&P’s.
ASH WATER PUMP: Align with motor and commissioning the pump. Including consumables and T&P’s.Cut the damaged/ worn-out portion of impeller hub and turning the impeller hub bore. Including consumables and T&P’s.
Cut the damaged/ worn-out portion of impeller hub and turning the impeller hub bore. Including consumables and T&P’s.
Insert the correct size SS 316 bar in to impeller hub bore taking V groove, welding and machining, boaring the bar to the required size, taking key way. Including consumables and T&P’s.
Machining pump shaft (SS 316) to suit the impeller bore and fixing the impeller in the shaft and checking the trueness in the shaft. Including consumables and T&P’s.
Renewal of shaft impeller key in the AWP and alignment of pump with motor. Including consumables and T&P’s.
SEALING WATER PUMP: Decoupling and dismantling the pump internals (All the 11 stages) Inspection of Impellers, Diffuser with Guide vane, stage casing, wear rings, shaft, bearings and metal filling in the worn out Hub and grinding and renew the above items and assemble back. Including consumables and T&P’s.
SEALING WATER PUMP:Aligning the pump and commissioning. Including consumables and T&P’s.
DRAIN PUMP:Disconnect the discharge pipe decouple the motor, dismantle the pump and inspection/renewal of spares and re-assemble and commissioning of pump including consumables and T&P’s
DRAIN PUMP:Removing the suction and discharge and cooling lines and renewing the damaged flanges with new one and re-fixing the line and commissioning.
SEA WATER BOOSTER PUMP : Decoupling and dismantling the pump alignment of pump with motor after completion of assembling work. Including consumables and T&P’s.
SEA WATER BOOSTER PUMP : Renew the bearings, impeller, shaft sleeve and assembling the pump. Including consumables and T&P’s.
ASH WATER TANK VALVE Renewal of 450 dia B/F valve from the line and including attending minor repair works. Including consumables and T&P’s.
Alignment of pump with Motor in AWP/SWP / FWP / SWBP. Including consumables and T&P’s.
Renewal of gland rope the ASDP / AWP / SWP / FWP / SWBP / D.P.
Patch welding over the worn out suction & discharge pipe of ASDP / AWP / FWP / SWP / D.P. / S.W.B.P. Including consumables and T&P’s.
ASH WATER STRAINER: Cleaning 600mm strainer by dismantling of top cover of strainer body, removal of filter element, complete cleaning of filter element and strainer body, filter mesh and strengthening stiffener rod, re assembling the filter element, fixing the top cover, leak checking. Including consumables and T&P’s.
FLUSHING WATER PUMP: Decoupling the flushing water pump, dismantling the pump casing, pump internals inspection of impeller, shaft, wear rings, shaft sleeve bearings, locknut and metal filling in the worn out area of upper & lower casing and impeller hub and grinding. Including consumables and T&P’s
FLUSHING WATER PUMP: Renewal of worn out spares and re-assembling the pump and aligning the pump with motor and commissioning. Including consumables and T&P’s.
ASH SLURRY SUMP: Removal the floating materials from the slurry sump and disposal the materials, transporting the floated material to low lying area dumping, dozing and leveling into dumped ash. Including consumables and T&P’s.
ASH SLURRY SUMP: Cut and remove the grills over the ash slurry sump and re-fixing the grills over the sump. (Total 63.79 m2) Including consumables and T&P’s.
ASH SLURRY SUMP: Picking the foreign material and clinkers from the trash screen which is located (- 6m) in the ash slurry sump and disposal the materials, transporting the material to low lying area, dumping, dozing and levelling. Including consumables and T&P’s.
ASH SLURRY DISPOSAL PUMP: Rectification of gland housing for ash slurry disposal pump. Including consumables and T&P’s.
Rectification of impeller hub for ash slurry disposal pump. Including consumables and T&P’s.
FILTRATION PLANT VALVES:Replacement / overhauling the worn out 300 dia B/F valve from the line. Including consumables and T&P’s.
Replacement / overhauling the worn out 125 dia B/F valve / diaphragm valve from the line. Including consumables and T&P’s.
Cleaning of equipments like ash water pump, sealing water pump, flush water pump, drain pump, Ash slurry pumps and connected pipe lines and valves and maintaining the ash water pump house Unit I, II & III including arresting leak. Including consumables and T&P’s.
A. ANANTHAN
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .