| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 LAccepted-Finance | L1 | Accepted-Finance L1 Bidder | |
| 2 | L2₹1.3 L+₹26,340 (25.3%)Rejected-Finance | L2 | Rejected-Finance Not L1 Bidder | |
| 3 | L3₹1.4 L+₹31,385 (30.1%)Rejected-Finance | L3 | Rejected-Finance Not L1 Bidder |
| Sl No | Description | Qty | Unit | CARRYON ENGINEERS L3 | KAJAL CHANDRA L2 | A S Enterprse L1 |
|---|---|---|---|---|---|---|
| 1.00 | Charges for dismantling of existing seventeen numbers decorative post top type light fittings, which is installed at 12mtr long decorative steel tubular pole. Each post top light dimention is 450mm diameter and 400mm height. All the fittings dismantled by using companies own tools & tackles. All this fittings will not be reuse condition. (same work for one pole done in a day and same work for another pole works on next day) | 2 | Item | 3,500 ₹7,000 | 2,500 ₹5,000 | 2,200 ₹4,400 Lowest |
| 2.00 | Charges of breaking hard concrete foundation of 12mtr long steel tubular pole by companies own tools & tackles as pr direction of EIC. Also arrangement of supports to hold the pole in vertical arrangement since more than 80% foundation broken. (same work for one pole done in a day and same work for another pole works on next day) | 2 | Item | 2,800 ₹5,600 | 2,500 ₹5,000 | 2,400 ₹4,800 Lowest |
| 3.00 | Charges for GI jacketing of 12mtr pole at foundation portion. Jacketing done by S&F of 5mm to 6mm thick GI pipe of diameter 8inch. MS pipe length approx 3ft. The GI pipe cut in half diameter then this half dia pipe fixed on the damage portion of pole & after that all around welded with existing pole. After completion of this half pipe welding, another half pipe welded on opposite side of pole base at the same position with same procedure. Necessary cutting, grinding, welding of 5mm GI pipe done by the companies own tools & tackles. This jacketing min 1/3rd portion of total length below the ground level. After completing the welding all over red oxide paint done on welding portion before making foundation. | 2 | Item | 7,400 ₹14,800 | 7,200 ₹14,400 Lowest | 7,500 ₹15,000 |
| 4.00 | Making concrete foundation having 600 x 600 x 150 mm thick CC (4:2:1) base block below sole plate/pole with hard jhama as per GS. [H1-1(b)] | 2 | Each | 4,200 ₹8,400 | 4,200 ₹8,400 | 4,000 ₹8,000 Lowest |
| 5.00 | Providing CC (6:3:1) base block dimension 0.45 x 0.45 x 0.60mt. Above ground level or equivalent round, neatly cemented finish (3 mm thick), at the base pole as per GS, without Loop Box. [H1-3(b)(ii)] | 2 | Each | 600 ₹1,200 | 600 ₹1,200 | 560 ₹1,120 Lowest |
| 6.00Painting of Steel Tubular Pole of 12Mtr length after preperation of surface by sand paper/emery paper, cleaning etc. for receiving fresh coat as per GS. [H2-7A] | ||||||
| 6.10 | One coat of red lead/Zinc chromate priming. [H2-7A-(b)i] | 2 | Each | 500 ₹1,000 | 500 ₹1,000 | 351 ₹702 Lowest |
| 6.20 | 1st coat of synthetic enamel paint. [H2-7A-(b)ii] | 2 | Each | 500 ₹1,000 | 500 ₹1,000 | 281 ₹562 Lowest |
| 6.30 | 2nd coat of synthetic enamel paint. [H2-7A-(b)ii] | 2 | Each | 500 ₹1,000 | 500 ₹1,000 | 256 ₹512 Lowest |
| 7.00Painting of 50mm dia decorative arms of average length 1.5mtr after preparation of surface by sand paper/emery paper, cleaning etc. for receiving fresh coat. | ||||||
Tender Value
Refer Docs
EMD Value
₹2,150
Closing Date
24 Aug 2026, 12:55 pmClosed
Assistant Engineer-II, Nabanna Electrical Sub-Divi
Nabanna Electrical Sub-Division, PWD. Nabanna,325 Sarat Chatterjee Road, Shibpur,Howrah
Repairing of defective twelve-meter decorative poles along with allied works at the garden adjacent to the Nabanna Sabhaghar entry and Supply and Fixing of kitchen chimney at the 14th Floor IRCTC canteen under NESD (PWD).
2026_WBPWD_5018459_1
12/Q of AE-II NESD 2026-27
Open Tender
ELECTRICAL WORKS M/R
Item Rate
10 days
Nabanna
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,150
2 Sept 2026
12 Aug 2026
26 Aug 2026
13 Aug 2026
24 Aug 2026
13 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Charges for dismantling of existing seventeen numbers decorative post top type light fittings, which is installed at 12mtr long decorative steel tubular pole. Each post top light dimention is 450mm diameter and 400mm height. All the fittings dismantled by using companies own tools & tackles. All this fittings will not be reuse condition. (same work for one pole done in a day and same work for another pole works on next day) | - | Item | 1.25 | - |
| 2Charges of breaking hard concrete foundation of 12mtr long steel tubular pole by companies own tools & tackles as pr direction of EIC. Also arrangement of supports to hold the pole in vertical arrangement since more than 80% foundation broken. (same work for one pole done in a day and same work for another pole works on next day) | |||||
| 3 | Charges for GI jacketing of 12mtr pole at foundation portion. Jacketing done by S&F of 5mm to 6mm thick GI pipe of diameter 8inch. MS pipe length approx 3ft. The GI pipe cut in half diameter then this half dia pipe fixed on the damage portion of pole & after that all around welded with existing pole. After completion of this half pipe welding, another half pipe welded on opposite side of pole base at the same position with same procedure. Necessary cutting, grinding, welding of 5mm GI pipe done by the companies own tools & tackles. This jacketing min 1/3rd portion of total length below the ground level. After completing the welding all over red oxide paint done on welding portion before making foundation. | - | Item | 10 | - |
| 4 | Making concrete foundation having 600 x 600 x 150 mm thick CC (4:2:1) base block below sole plate/pole with hard jhama as per GS. [H1-1(b)] | - | Each | 22 | - |
| 5 | Providing CC (6:3:1) base block dimension 0.45 x 0.45 x 0.60mt. Above ground level or equivalent round, neatly cemented finish (3 mm thick), at the base pole as per GS, without Loop Box. [H1-3(b)(ii)] | - | Each | 22 | - |
| 6Painting of Steel Tubular Pole of 12Mtr length after preperation of surface by sand paper/emery paper, cleaning etc. for receiving fresh coat as per GS. [H2-7A] | |||||
| 6.1 | One coat of red lead/Zinc chromate priming. [H2-7A-(b)i] | - | Each | 22 | - |
| 6.2 | 1st coat of synthetic enamel paint. [H2-7A-(b)ii] | - | Each | 22 | - |
| 6.3 | 2nd coat of synthetic enamel paint. [H2-7A-(b)ii] | - | Each | 22 | - |
| 7Painting of 50mm dia decorative arms of average length 1.5mtr after preparation of surface by sand paper/emery paper, cleaning etc. for receiving fresh coat. | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
2911.pdf
Tender Documents • 1.86 MB
BOQ_5089493.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .