Tender Value
₹3.7 L
EMD Value
₹7,470
Closing Date
5 Jan 2023, 5:00 pmClosed
MUNEESH BABBAR
Saraswati Heritage Divn.2, Kurukshetra
the government of Haryana has launched an ambitious project for revival of ancient holy Sarasvati River to its old glory by developing the river bed and its other adjoining areas of religious Significance. In village dhanirampura ancient ghat was d
2022_HRY_251345_1
20229405F41D 27BA 4D83 8C52 F1E437648CDC1598IRR
Open Tender
Civil Works
Works
110 days
Kurukshetra
2 documents required · 2 mandatory
₹500
₹7,470
Yes
1 Feb 2023
26 Dec 2022
6 Jan 2023
26 Dec 2022
5 Jan 2023
26 Dec 2022
Amount
Works Details
[11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) Through Rate
[11.60]Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. Through Rate
[11.93.1]Finishing walls with water proofing cement paint of required shade : 1. New work (Two or more coats applied @ 3.84 kg/10 sqm) Through Rate
[4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. Through Rate
[6.1.4]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 4. 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) Through Rate
[6.29.1]Centering and shuttering including strutting, propping etc. and removal of form work for : 1. Foundations, footings, bases for columns Through Rate
[6.9.2]Providing and laying damp-proof course with cement concrete 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20mm nominal size) 2. 40 mm thick Through Rate
[7.21.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) Through Rate
[7.22.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in superstructure above plinth level up to floor IV level in all shapes and sizes in : 1. Cement mortar 1:4 (1 cement : 4 coarse sand) Through Rate
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .