| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.0 LAccepted-Finance 00 SAMARPURA VIJAYSINGHPURA KUSHALPURA JAIPUR RAJASTHAN 303806 | JAIPUR | RAJASTHAN | 303806 | ₹23.0 L | L1 | Accepted-Finance lowest one bidder |
| 2 | L2₹24.4 L+₹1.4 L (6.15%)Rejected-Finance | ₹24.4 L+₹1.4 L (6.15%) | L2 | Rejected-Finance Second lowest bidder |
| 3 | L3₹30.2 L+₹7.1 L (31.0%)Rejected-Finance | ₹30.2 L+₹7.1 L (31.0%) | L3 | Rejected-Finance third lowest bidder |
Tender Value
Refer Docs
EMD Value
₹71,000
Closing Date
9 Mar 2026, 3:00 pmClosed
Executive Engineer
Executive Engineer, Central University of Jammu
Construction of Pavement from Guest House to V.C Residence at Central University of Jammu
2026_CUJMU_899240_1
CUJ/W/2025-26/16
Open Tender
Civil Works - Roads
Works
45 days
central university of jammu
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹71,000
office of the Executive Engineer
3 Sept 2026
19 Feb 2026
10 Mar 2026
19 Feb 2026
9 Mar 2026
19 Feb 2026
19 Feb 2026 - 25 Feb 2026
25 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earthwith lead upto 50 metres. | 309.38 | sqm | 218.9 | ₹67,723.28 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil. | 250 | cum | 177.5 | ₹44,375 |
| 3 | Supplying and stacking at site 63 mm to 45 mm size stone aggregate [DSR-16.3.2] | 110 | cum | 2,098.4 | ₹2,30,824 |
| 4 | Supplying and stacking at site 53 mm to 22.4 mm size stone aggregate | 110 | cum | 1,636.05 | ₹1,79,965.5 |
| 5 | supplying and stacking at site Sand manufactured derived from aggregates | 27.5 | cum | 1,250 | ₹34,375 |
| 6 | Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road/vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening / binding material to fill up interstices of coarse aggregate, watering and compacting to the required density. | 247.5 | cum | 1,046.95 | ₹2,59,120.13 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or
more. | 2,608 | kg | 107.85 | ₹2,81,272.8 |
| 8 | Cement Concrete1:2:4(1 cement:2 Coarse:4 40 mm aggregate) in pavements laid to required slope and camber, as required including consolidation finishing and tamping complete(In panels as per directions of Engineer-In-Charge) broom finish | 200 | cum | 7,993.8 | ₹15,98,760 |
| 9 | Providing and filling in position rubberised bitumin hot sealing compound for sealing of expansion joints in roads all complete as per the direction of engineer incharge | 600 | per cm d per cmw and length m | 8.65 | ₹5,190 |
| 10 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5 mm), including making drainageopening wherever required complete etc. as per direction of Engineerin-charge (length of finished kerb edging shall be measured to calculate volume for payment). | 22.5 | cum | 10,117.7 | ₹2,27,648.25 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
BOQ_945209.xls
BOQ • 0.32 MB
tenderdocroad.pdf
Tender Documents • 0.79 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .