Tender Value
₹62.5 L
EMD Value
₹1.2 L
Closing Date
11 Aug 2025, 11:00 pmClosed
Agriculture Department
PROPOSED FOR MICRO WATERSHED TREATMENT AT ALLUR B VILLAGE OF CHITTAPUR TALUKA (GEN)
AD/2024-25/OW/WORK_INDENT117/CALL-2
AD/2024-25/OW/WORK_INDENT117/CALL-2
Open
Other Works
Two Tender Document System(Two Cover)
Joint Director of Agriculture Office KALABURAGI
₹1,570
₹1.2 L
3 Aug 2025
3 Aug 2025
13 Aug 2025
7 Aug 2025
PROPOSED FOR MICRO WATERSHED TREATMENT AT ALLUR B VILLAGE OF CHITTAPUR TALUKA CHECK DAM BLOCK-I
Foundation excavation for construction of RRS CD VD Digging foundation for bund seat of NB PT with a lead and of 50m and 2.00m a) Up to a depth of 2m in Red Black Soils
Providing and laying in position plain cement concrete of mix 1:4:8 with OPC cement @ 180Kgs, with 40mm and down size graded granite metal jelly @ 0.85Cum and sand @ 0.57Cum Machine mixed, concrete la...
a) Providing and constructing Granite/Trap/Basalt Rubble stone machinery in foundation with cement mortar 1:6 with OPC cement @82.5Kgs, with sand @0.35Cum and 1.1Cum rubble stones not less than 0.3m. ...
Providing and constructing Granite/Trap/Basalt Size stone chisel dresses, reinforced with bond stones at every 2m distance, machinery for super structure with cement mortar 1:4, with OPC cement @106.4...
Providing and Laying in position plain cement concrete of mix 1:3:6 with OPC cement @ 220Kgs, with 20mm and down size graded granite metal jelly @ 0.84Cum and sand @ 0.56Cum, Machine mixed, concrete l...
a) Cement Pointing: Pointing walls built in size stone or rubble Granite/Lateritic Stones in 1:3 cement sand mortar curing and other works complete.
Stone pitching of Nala Bund Check Dam RRS and other structures if the stones are not locally available to be transported from approved quarry rough stone pitching to a thinkness of 0.45m in Granite/Tr...
Stone pitching of Nala Bund Check Dam RRS and other structures if the stones are not locally available to be transported from approved quarry rough stone pitching to a thinkness of 0.45m in Granite Tr...
Filling up of gaps noticed during execution of Check Dam RRS with clay watering and Compacting
PROPOSED FOR MICRO WATERSHED TREATMENT AT ALLUR B VILLAGE OF CHITTAPUR TALUKA CHECK DAM BLOCK-II
Foundation excavation for construction of RRS CD VD Digging foundation for bund seat of NB PT with a lead and of 50m and 2.00m a) Up to a depth of 2m in Red Black Soils
Providing and laying in position plain cement concrete of mix 1:4:8 with OPC cement @ 180Kgs, with 40mm and down size graded granite metal jelly @ 0.85Cum and sand @ 0.57Cum Machine mixed, concrete la...
a) Providing and constructing Granite/Trap/Basalt Rubble stone machinery in foundation with cement mortar 1:6 with OPC cement @82.5Kgs, with sand @0.35Cum and 1.1Cum rubble stones not less than 0.3m. ...
Providing and constructing Granite/Trap/Basalt Size stone chisel dresses, reinforced with bond stones at every 2m distance, machinery for super structure with cement mortar 1:4, with OPC cement @106.4...
Providing and Laying in position plain cement concrete of mix 1:3:6 with OPC cement @ 220Kgs, with 20mm and down size graded granite metal jelly @ 0.84Cum and sand @ 0.56Cum, Machine mixed, concrete l...
a) Cement Pointing: Pointing walls built in size stone or rubble Granite/Lateritic Stones in 1:3 cement sand mortar curing and other works complete.
Stone pitching of Nala Bund Check Dam RRS and other structures if the stones are not locally available to be transported from approved quarry rough stone pitching to a thinkness of 0.45m in Granite/Tr...
Stone pitching of Nala Bund Check Dam RRS and other structures if the stones are not locally available to be transported from approved quarry rough stone pitching to a thinkness of 0.45m in Granite Tr...
Filling up of gaps noticed during execution of Check Dam RRS with clay watering and Compacting
PROPOSED FOR MICRO WATERSHED TREATMENT AT ALLUR B VILLAGE OF CHITTAPUR TALUKA RRS BLOCK-I
Foundation excavation for construction of RRS/CD/VD/Digging foundation for bund seat of NB/PT with a lead and of 50m and 2.00m a) Up to a depth of 2m in Red/Black Soils
Providing and laying in position plain cement concrete of mix 1:4:8 with OPC cement @ 180Kgs, with 40mm and down size graded granite metal jelly @ 0.85Cum and sand @ 0.57Cum, Machine mixed, concrete l...
a) Providing and constructing Granite/Trap/Basalt Rubble stone machinery in foundation with cement mortar 1:6 with OPC cement @82.5Kgs, with sand @0.35Cum and 1.1Cum rubble stones not less than 0.3m. ...
Providing and constructing Granite/Trap/Basalt Size stone chisel dresses, reinforced with bond stones at every 2m distance, machinery for super structure with cement mortar 1:4, with OPC cement @106.4...
Providing and Laying in position plain cement concrete of mix 1:3:6 with OPC cement @ 220Kgs, with 20mm and down size graded granite metal jelly @ 0.84Cum and sand @ 0.56Cum, Machine mixed, concrete l...
a) Cement Pointing: Pointing walls built in size stone or rubble Granite/Lateritic Stones in 1:3 cement sand mortar, curing and other works complete.
Stone pitching of Nala Bund, Check Dam, RRS and other structures if the stones are not locally available, to be transported from approved quarry rough stone pitching to a thinkness of 0.45m in Granite...
RRS "Stone pitching of Nala Bund, Check Dam, RRS and other structures if the stones are not locally available, to be transported from approved quarry rough stone pitching to a thinkness of 0.45m in Gr...
Filling up of gaps noticed during execution of Check Dam, RRS, with clay watering and Compacting.
PROPOSED FOR MICRO WATERSHED TREATMENT AT ALLUR B VILLAGE OF CHITTAPUR TALUKA RRS BLOCK-III
Foundation excavation for construction of RRS/CD/VD/Digging foundation for bund seat of NB/PT with a lead and of 50m and 2.00m a) Up to a depth of 2m in Red/Black Soils
Providing and laying in position plain cement concrete of mix 1:4:8 with OPC cement @ 180Kgs, with 40mm and down size graded granite metal jelly @ 0.85Cum and sand @ 0.57Cum, Machine mixed, concrete l...
a) Providing and constructing Granite/Trap/Basalt Rubble stone machinery in foundation with cement mortar 1:6 with OPC cement @82.5Kgs, with sand @0.35Cum and 1.1Cum rubble stones not less than 0.3m. ...
Providing and constructing Granite/Trap/Basalt Size stone chisel dresses, reinforced with bond stones at every 2m distance, machinery for super structure with cement mortar 1:4, with OPC cement @106.4...
Providing and Laying in position plain cement concrete of mix 1:3:6 with OPC cement @ 220Kgs, with 20mm and down size graded granite metal jelly @ 0.84Cum and sand @ 0.56Cum, Machine mixed, concrete l...
a) Cement Pointing: Pointing walls built in size stone or rubble Granite/Lateritic Stones in 1:3 cement sand mortar, curing and other works complete.
Stone pitching of Nala Bund, Check Dam, RRS and other structures if the stones are not locally available, to be transported from approved quarry rough stone pitching to a thinkness of 0.45m in Granite...
RRS "Stone pitching of Nala Bund, Check Dam, RRS and other structures if the stones are not locally available, to be transported from approved quarry rough stone pitching to a thinkness of 0.45m in Gr...
Filling up of gaps noticed during execution of Check Dam, RRS, with clay watering and Compacting.
PROPOSED FOR MICRO WATERSHED TREATMENT AT ALLUR B VILLAGE OF CHITTAPUR TALUKA GOKATTA BLOCK-I
Soil and Water Conservation Works by JCB/POKELINER or any other Machines which are used for excavation of foundation of stone machinary strctures.
Excavation of Earth for silt traps construction in Farm Ponds and other Works and rising of bund around structure.
Formation & dressing of Bunds/Bunds around and spoiled banks of Gokatta using Machinery
Smoothening of the trench bottom surface on excavation using machinery
Supply and spreading of murram for COF waste weir, channel weir Boulder waste weir, Nala revetment Farm Pon; silt trap inlet and outlet and other works.
Providing and Constructing Granite/Trap/Basalt rubble stone masonry in foundation with cement mortar1:6 wih OPC cement & 82.5Kgs, with Sand & 0.35Cum & 1.10Cum rubble stones not less than 0.30 M thick...
Providing and Constructing Granite/Trap/Basalt rubble stone chisel dresses, reinforced with bond stones at every 2m distance masonry for super structure with cement mortat 1:4 with OPC cement & 106.4K...
Providing and laying in position plain cement concrete of mix 1:3:6 with OPC cement @220 Kgs, with 20mm and down size graded granite metal jelly @0.84Cum and sand @0.56Cum, machine mixed concrete laid...
Pointing walls built in size stone or rubble Granite/Latterite stones in 1:3 cement sand mortat, curing and other works complete
GOKATTA "Stone pitching of Nala Bund, Check Dam, RRS and other structures if the stones are not locally available, to be transported from approved quarry rough stone pitching to a thinkness of 0.45m i...
GOKATTA "Stone pitching of Nala Bund, Check Dam, RRS and other structures if the stones are not locally available, to be transported from approved quarry rough stone pitching to a thinkness of 0.45m i...
GOKATTA "Construction of header line using doubles size bond stones
Cost of Stones 23X23X45 Cms size"
GOKATTA "Construction of header line using doubles size bond stones
PROPOSED FOR MICRO WATERSHED TREATMENT AT ALLUR B VILLAGE OF CHITTAPUR TALUKA GOKATTA BLOCK-III
Soil and Water Conservation Works by JCB/POKELINER or any other Machines which are used for excavation of foundation of stone machinary strctures.
Excavation of Earth for silt traps construction in Farm Ponds and other Works and rising of bund around structure.
Formation & dressing of Bunds/Bunds around and spoiled banks of Gokatta using Machinery
Smoothening of the trench bottom surface on excavation using machinery
Supply and spreading of murram for COF waste weir, channel weir Boulder waste weir, Nala revetment Farm Pon; silt trap inlet and outlet and other works.
Providing and Constructing Granite/Trap/Basalt rubble stone masonry in foundation with cement mortar1:6 wih OPC cement & 82.5Kgs, with Sand & 0.35Cum & 1.10Cum rubble stones not less than 0.30 M thick...
Providing and Constructing Granite/Trap/Basalt rubble stone chisel dresses, reinforced with bond stones at every 2m distance masonry for super structure with cement mortat 1:4 with OPC cement & 106.4K...
Providing and laying in position plain cement concrete of mix 1:3:6 with OPC cement @220 Kgs, with 20mm and down size graded granite metal jelly @0.84Cum and sand @0.56Cum, machine mixed concrete laid...
Pointing walls built in size stone or rubble Granite/Latterite stones in 1:3 cement sand mortat, curing and other works complete
GOKATTA "Stone pitching of Nala Bund, Check Dam, RRS and other structures if the stones are not locally available, to be transported from approved quarry rough stone pitching to a thinkness of 0.45m i...
GOKATTA "Stone pitching of Nala Bund, Check Dam, RRS and other structures if the stones are not locally available, to be transported from approved quarry rough stone pitching to a thinkness of 0.45m i...
GOKATTA "Construction of header line using doubles size bond stones
Cost of Stones 23X23X45 Cms size"
GOKATTA "Construction of header line using doubles size bond stones
PROPOSED FOR MICRO WATERSHED TREATMENT AT ALLUR B VILLAGE OF CHITTAPUR TALUKA GOKATTA BLOCK-IV
Soil and Water Conservation Works by JCB/POKELINER or any other Machines which are used for excavation of foundation of stone machinary strctures.
Excavation of Earth for silt traps construction in Farm Ponds and other Works and rising of bund around structure.
Formation & dressing of Bunds/Bunds around and spoiled banks of Gokatta using Machinery
Smoothening of the trench bottom surface on excavation using machinery
Supply and spreading of murram for COF waste weir, channel weir Boulder waste weir, Nala revetment Farm Pon; silt trap inlet and outlet and other works.
Providing and Constructing Granite/Trap/Basalt rubble stone masonry in foundation with cement mortar1:6 wih OPC cement & 82.5Kgs, with Sand & 0.35Cum & 1.10Cum rubble stones not less than 0.30 M thick...
Providing and Constructing Granite/Trap/Basalt rubble stone chisel dresses, reinforced with bond stones at every 2m distance masonry for super structure with cement mortat 1:4 with OPC cement & 106.4K...
Providing and laying in position plain cement concrete of mix 1:3:6 with OPC cement @220 Kgs, with 20mm and down size graded granite metal jelly @0.84Cum and sand @0.56Cum, machine mixed concrete laid...
Pointing walls built in size stone or rubble Granite/Latterite stones in 1:3 cement sand mortat, curing and other works complete
GOKATTA "Stone pitching of Nala Bund, Check Dam, RRS and other structures if the stones are not locally available, to be transported from approved quarry rough stone pitching to a thinkness of 0.45m i...
GOKATTA "Stone pitching of Nala Bund, Check Dam, RRS and other structures if the stones are not locally available, to be transported from approved quarry rough stone pitching to a thinkness of 0.45m i...
GOKATTA "Construction of header line using doubles size bond stones
Cost of Stones 23X23X45 Cms size"
GOKATTA "Construction of header line using doubles size bond stones
PROPOSED FOR MICRO WATERSHED TREATMENT AT ALLUR B VILLAGE OF CHITTAPUR TALUKA BOULDER CHECK BLOCK-I
EXCAVATION OF FOUNDATION AS PER DESIGN SPECIFICATION Up to 1 m depth
a) Foundation excavation as per design for Boulder Checks Rubble Checks & Middle Reach Treatments in Red and Black soils
STONE WORKS Use of locally available Boulders
Rubbles for construction of Boulder COF waste weir
Channel Weir Pipe outlet Well waste weir
Boulder check Rubble check Boulder Flume
Drops Stone pitchi...
STONE WORKS Use of locally available Boulders Rubbles for construction of Boulder COF waste weir Channel Weir Pipe outlet Well waste weir Boulder check Rubble check Boulder Flume Drops Stone pitching ...
PROPOSED FOR MICRO WATERSHED TREATMENT AT ALLUR B VILLAGE OF CHITTAPUR TALUKA BOULDER CHECK BLOCK-II
EXCAVATION OF FOUNDATION AS PER DESIGN SPECIFICATION Up to 1 m depth
a) Foundation excavation as per design for Boulder Checks Rubble Checks & Middle Reach Treatments in Red and Black soils
STONE WORKS Use of locally available Boulders
Rubbles for construction of Boulder COF waste weir
Channel Weir Pipe outlet Well waste weir
Boulder check Rubble check Boulder Flume
Drops Stone pitchi...
STONE WORKS Use of locally available Boulders Rubbles for construction of Boulder COF waste weir Channel Weir Pipe outlet Well waste weir Boulder check Rubble check Boulder Flume Drops Stone pitching ...
PROPOSED FOR MICRO WATERSHED TREATMENT AT ALLUR B VILLAGE OF CHITTAPUR TALUKA BOULDER CHECK BLOCK-III
EXCAVATION OF FOUNDATION AS PER DESIGN SPECIFICATION Up to 1 m depth
a) Foundation excavation as per design for Boulder Checks Rubble Checks & Middle Reach Treatments in Red and Black soils
STONE WORKS Use of locally available Boulders
Rubbles for construction of Boulder COF waste weir
Channel Weir Pipe outlet Well waste weir
Boulder check Rubble check Boulder Flume
Drops Stone pitchi...
STONE WORKS Use of locally available Boulders Rubbles for construction of Boulder COF waste weir Channel Weir Pipe outlet Well waste weir Boulder check Rubble check Boulder Flume Drops Stone pitching ...
PROPOSED FOR MICRO WATERSHED TREATMENT AT ALLUR B VILLAGE OF CHITTAPUR TALUKA RUBBLE CHECK BLOCK-I
EXCAVATION OF FOUNDATION AS PER DESIGN SPECIFICATION
(Up to 1 m depth)
a) Foundation excavation for COF/ waste weir
STONE WORKS Use of locally available Boulders
Rubbles for construction of Boulder COF waste weir Channel Weir Pipe outlet Well waste weir Boulder check Rubble check Boulder Flume Drops Stone pitching...
TRANSPORTATION COST FOR STONE/ CEMENT/ OTHER MATERIALS: 5 to 30 Km, Add for every
LOADING AND UNLOADING OF MATERIALS: Rubble/Boulders/ Size Stones/Jelly / RCC NP2
Stone Works: Use of locally available Boulders/Rubbles for construction of : Boulder / COF waste: Stone
weir/Channel Weir/ Pipe outlet/Well waste weir/ Boulder check/ Rubble check/ Boulder Flume, Drop...
SHALLOW WELL: Construction of steining to the shallow well using granite/trap/basalt stones.
Construction of header line using double size bond stones
b) Construction
Rubble Check, SHALLOW WELL:Construction of steining to the shallow well using granite/trap/basalt stones.
Construction of header line using double size bond stones
a) Cost of stones of 23x23x45 cm siz...
PROPOSED FOR MICRO WATERSHED TREATMENT AT ALLUR B VILLAGE OF CHITTAPUR TALUKA RUBBLE CHECK BLOCK-II
EXCAVATION OF FOUNDATION AS PER DESIGN SPECIFICATION
(Up to 1 m depth)
a) Foundation excavation for COF/ waste weir
STONE WORKS Use of locally available Boulders
Rubbles for construction of Boulder COF waste weir Channel Weir Pipe outlet Well waste weir Boulder check Rubble check Boulder Flume Drops Stone pitching...
TRANSPORTATION COST FOR STONE/ CEMENT/ OTHER MATERIALS: 5 to 30 Km, Add for every
LOADING AND UNLOADING OF MATERIALS: Rubble/Boulders/ Size Stones/Jelly / RCC NP2
Stone Works: Use of locally available Boulders/Rubbles for construction of : Boulder / COF waste: Stone
weir/Channel Weir/ Pipe outlet/Well waste weir/ Boulder check/ Rubble check/ Boulder Flume, Drop...
SHALLOW WELL: Construction of steining to the shallow well using granite/trap/basalt stones.
Construction of header line using double size bond stones
b) Construction
Rubble Check, SHALLOW WELL:Construction of steining to the shallow well using granite/trap/basalt stones.
Construction of header line using double size bond stones
a) Cost of stones of 23x23x45 cm siz...
PROPOSED FOR MICRO WATERSHED TREATMENT AT ALLUR B VILLAGE OF CHITTAPUR TALUKA RUBBLE CHECK BLOCK-III
EXCAVATION OF FOUNDATION AS PER DESIGN SPECIFICATION
(Up to 1 m depth)
a) Foundation excavation for COF/ waste weir
STONE WORKS Use of locally available Boulders
Rubbles for construction of Boulder COF waste weir Channel Weir Pipe outlet Well waste weir Boulder check Rubble check Boulder Flume Drops Stone pitching...
TRANSPORTATION COST FOR STONE/ CEMENT/ OTHER MATERIALS: 5 to 30 Km, Add for every
LOADING AND UNLOADING OF MATERIALS: Rubble/Boulders/ Size Stones/Jelly / RCC NP2
Stone Works: Use of locally available Boulders/Rubbles for construction of : Boulder / COF waste: Stone
weir/Channel Weir/ Pipe outlet/Well waste weir/ Boulder check/ Rubble check/ Boulder Flume, Drop...
SHALLOW WELL: Construction of steining to the shallow well using granite/trap/basalt stones.
Construction of header line using double size bond stones
b) Construction
Rubble Check, SHALLOW WELL:Construction of steining to the shallow well using granite/trap/basalt stones.
Construction of header line using double size bond stones
a) Cost of stones of 23x23x45 cm siz...
PROPOSED FOR MICRO WATERSHED TREATMENT AT ALLUR B VILLAGE OF CHITTAPUR TALUKA DIVERSION CHANNEL BLOCK-I
MACHINERY WORKS: Rates for Soil and Water Conservation works when JCB/POKELINER or any other machines which are used for excavation of foundation of Stone masonry structures.
Hard Soil/Gravel mixed re...
MACHINERY WORKS: Rates for Soil and Water Conservation works when JCB/POKELINER or any other machines which are used for excavation of foundation of Stone masonry structures
(I) Formation & Dressing o...
MACHINERY WORKS: Rates for Soil and Water Conservation works when JCB/POKELINER or any other machines which are used for excavation of foundation of Stone masonry structures
(II). Smoothening of the T...
EXCAVATION OF FOUNDATION AS PER DESIGN
SPECIFICATION (Up to 1 m depth)
a) Foundation excavation as per design for Boulder Checks/Rubble Checks & Middle Reach Treatments in Red and Black soils
DC CONSTRUCTION
PROPOSED FOR MICRO WATERSHED TREATMENT AT ALLUR B VILLAGE OF CHITTAPUR TALUKA DIVERSION CHANNEL BLOCK-II
MACHINERY WORKS: Rates for Soil and Water Conservation works when JCB/POKELINER or any other machines which are used for excavation of foundation of Stone masonry structures.
Hard Soil/Gravel mixed re...
MACHINERY WORKS: Rates for Soil and Water Conservation works when JCB/POKELINER or any other machines which are used for excavation of foundation of Stone masonry structures
(I) Formation & Dressing o...
MACHINERY WORKS: Rates for Soil and Water Conservation works when JCB/POKELINER or any other machines which are used for excavation of foundation of Stone masonry structures
(II). Smoothening of the T...
EXCAVATION OF FOUNDATION AS PER DESIGN
SPECIFICATION (Up to 1 m depth)
a) Foundation excavation as per design for Boulder Checks/Rubble Checks & Middle Reach Treatments in Red and Black soils
DC CONSTRUCTION
PROPOSED FOR MICRO WATERSHED TREATMENT AT ALLUR B VILLAGE OF CHITTAPUR TALUKA DIVERSION CHANNEL BLOCK-III
MACHINERY WORKS: Rates for Soil and Water Conservation works when JCB/POKELINER or any other machines which are used for excavation of foundation of Stone masonry structures.
Hard Soil/Gravel mixed re...
MACHINERY WORKS: Rates for Soil and Water Conservation works when JCB/POKELINER or any other machines which are used for excavation of foundation of Stone masonry structures
(I) Formation & Dressing o...
MACHINERY WORKS: Rates for Soil and Water Conservation works when JCB/POKELINER or any other machines which are used for excavation of foundation of Stone masonry structures
(II). Smoothening of the T...
EXCAVATION OF FOUNDATION AS PER DESIGN
SPECIFICATION (Up to 1 m depth)
a) Foundation excavation as per design for Boulder Checks/Rubble Checks & Middle Reach Treatments in Red and Black soils
DC CONSTRUCTION
PROPOSED FOR MICRO WATERSHED TREATMENT AT ALLUR B VILLAGE OF CHITTAPUR TALUKA TRENCH CUM BUND BLOCK-I
MACHINERY WORKS: Rates for Soil and Water Conservation works when JCB/POKELINER or any other machines which are used for excavation of foundation of Stone masonry structures.
Red/Red Sandy/Black Soils...
Providing and laying in position plain cement concrete of mix 1:4:8 with OPC cement @ 180Kgs, with 40mm and down size graded granite metal jelly @ 0.85Cum and sand @ 0.57Cum, Machine mixed, concrete l...
a) Providing and constructing Granite/Trap/Basalt Rubble stone machinery in foundation with cement mortar 1:6 with OPC cement @82.5Kgs, with sand @0.35Cum and 1.1Cum rubble stones not less than 0.3m. ...
EXCAVATION OF FOUNDATION AS PER DESIGN SPECIFICATION (Up to 1 m depth) a) Foundation excavation for COF/ waste weir.
Providing and Laying in position plain cement concrete of mix 1:3:6 with OPC cement @ 220Kgs, with 20mm and down size graded granite metal jelly @ 0.84Cum and sand @ 0.56Cum, Machine mixed, concrete l...
a) Cement Pointing: Pointing walls built in size stone or rubble Granite/Lateritic Stones in 1:3 cement sand mortar, curing and other works complete.
PROPOSED FOR MICRO WATERSHED TREATMENT AT ALLUR B VILLAGE OF CHITTAPUR TALUKA TRENCH CUM BUND BLOCK-II
MACHINERY WORKS: Rates for Soil and Water Conservation works when JCB/POKELINER or any other machines which are used for excavation of foundation of Stone masonry structures.
Red/Red Sandy/Black Soils...
Providing and laying in position plain cement concrete of mix 1:4:8 with OPC cement @ 180Kgs, with 40mm and down size graded granite metal jelly @ 0.85Cum and sand @ 0.57Cum, Machine mixed, concrete l...
a) Providing and constructing Granite/Trap/Basalt Rubble stone machinery in foundation with cement mortar 1:6 with OPC cement @82.5Kgs, with sand @0.35Cum and 1.1Cum rubble stones not less than 0.3m. ...
EXCAVATION OF FOUNDATION AS PER DESIGN SPECIFICATION (Up to 1 m depth) a) Foundation excavation for COF/ waste weir.
Providing and Laying in position plain cement concrete of mix 1:3:6 with OPC cement @ 220Kgs, with 20mm and down size graded granite metal jelly @ 0.84Cum and sand @ 0.56Cum, Machine mixed, concrete l...
a) Cement Pointing: Pointing walls built in size stone or rubble Granite/Lateritic Stones in 1:3 cement sand mortar, curing and other works complete.
PROPOSED FOR MICRO WATERSHED TREATMENT AT ALLUR B VILLAGE OF CHITTAPUR TALUKA TRENCH CUM BUND BLOCK-III
MACHINERY WORKS: Rates for Soil and Water Conservation works when JCB/POKELINER or any other machines which are used for excavation of foundation of Stone masonry structures.
Red/Red Sandy/Black Soils...
Providing and laying in position plain cement concrete of mix 1:4:8 with OPC cement @ 180Kgs, with 40mm and down size graded granite metal jelly @ 0.85Cum and sand @ 0.57Cum, Machine mixed, concrete l...
a) Providing and constructing Granite/Trap/Basalt Rubble stone machinery in foundation with cement mortar 1:6 with OPC cement @82.5Kgs, with sand @0.35Cum and 1.1Cum rubble stones not less than 0.3m. ...
EXCAVATION OF FOUNDATION AS PER DESIGN SPECIFICATION (Up to 1 m depth) a) Foundation excavation for COF/ waste weir.
Providing and Laying in position plain cement concrete of mix 1:3:6 with OPC cement @ 220Kgs, with 20mm and down size graded granite metal jelly @ 0.84Cum and sand @ 0.56Cum, Machine mixed, concrete l...
a) Cement Pointing: Pointing walls built in size stone or rubble Granite/Lateritic Stones in 1:3 cement sand mortar, curing and other works complete.
PROPOSED FOR MICRO WATERSHED TREATMENT AT ALLUR B VILLAGE OF CHITTAPUR TALUKA TRENCH CUM BUND BLOCK-IV
MACHINERY WORKS: Rates for Soil and Water Conservation works when JCB/POKELINER or any other machines which are used for excavation of foundation of Stone masonry structures.
Red/Red Sandy/Black Soils...
Providing and laying in position plain cement concrete of mix 1:4:8 with OPC cement @ 180Kgs, with 40mm and down size graded granite metal jelly @ 0.85Cum and sand @ 0.57Cum, Machine mixed, concrete l...
a) Providing and constructing Granite/Trap/Basalt Rubble stone machinery in foundation with cement mortar 1:6 with OPC cement @82.5Kgs, with sand @0.35Cum and 1.1Cum rubble stones not less than 0.3m. ...
EXCAVATION OF FOUNDATION AS PER DESIGN SPECIFICATION (Up to 1 m depth) a) Foundation excavation for COF/ waste weir.
Providing and Laying in position plain cement concrete of mix 1:3:6 with OPC cement @ 220Kgs, with 20mm and down size graded granite metal jelly @ 0.84Cum and sand @ 0.56Cum, Machine mixed, concrete l...
a) Cement Pointing: Pointing walls built in size stone or rubble Granite/Lateritic Stones in 1:3 cement sand mortar, curing and other works complete.
PROPOSED FOR MICRO WATERSHED TREATMENT AT ALLUR B VILLAGE OF CHITTAPUR TALUKA TRENCH CUM BUND BLOCK-V
MACHINERY WORKS: Rates for Soil and Water Conservation works when JCB/POKELINER or any other machines which are used for excavation of foundation of Stone masonry structures.
Red/Red Sandy/Black Soils...
Providing and laying in position plain cement concrete of mix 1:4:8 with OPC cement @ 180Kgs, with 40mm and down size graded granite metal jelly @ 0.85Cum and sand @ 0.57Cum, Machine mixed, concrete l...
a) Providing and constructing Granite/Trap/Basalt Rubble stone machinery in foundation with cement mortar 1:6 with OPC cement @82.5Kgs, with sand @0.35Cum and 1.1Cum rubble stones not less than 0.3m. ...
EXCAVATION OF FOUNDATION AS PER DESIGN SPECIFICATION (Up to 1 m depth) a) Foundation excavation for COF/ waste weir.
Providing and Laying in position plain cement concrete of mix 1:3:6 with OPC cement @ 220Kgs, with 20mm and down size graded granite metal jelly @ 0.84Cum and sand @ 0.56Cum, Machine mixed, concrete l...
a) Cement Pointing: Pointing walls built in size stone or rubble Granite/Lateritic Stones in 1:3 cement sand mortar, curing and other works complete.
PROPOSED FOR MICRO WATERSHED TREATMENT AT ALLUR B VILLAGE OF CHITTAPUR TALUKA TRENCH CUM BUND BLOCK-VI
MACHINERY WORKS: Rates for Soil and Water Conservation works when JCB/POKELINER or any other machines which are used for excavation of foundation of Stone masonry structures.
Red/Red Sandy/Black Soils...
Providing and laying in position plain cement concrete of mix 1:4:8 with OPC cement @ 180Kgs, with 40mm and down size graded granite metal jelly @ 0.85Cum and sand @ 0.57Cum, Machine mixed, concrete l...
a) Providing and constructing Granite/Trap/Basalt Rubble stone machinery in foundation with cement mortar 1:6 with OPC cement @82.5Kgs, with sand @0.35Cum and 1.1Cum rubble stones not less than 0.3m. ...
EXCAVATION OF FOUNDATION AS PER DESIGN SPECIFICATION (Up to 1 m depth) a) Foundation excavation for COF/ waste weir.
Providing and Laying in position plain cement concrete of mix 1:3:6 with OPC cement @ 220Kgs, with 20mm and down size graded granite metal jelly @ 0.84Cum and sand @ 0.56Cum, Machine mixed, concrete l...
a) Cement Pointing: Pointing walls built in size stone or rubble Granite/Lateritic Stones in 1:3 cement sand mortar, curing and other works complete.
PROPOSED FOR MICRO WATERSHED TREATMENT AT ALLUR B VILLAGE OF CHITTAPUR TALUKA TRENCH CUM BUND BLOCK-VII
MACHINERY WORKS: Rates for Soil and Water Conservation works when JCB/POKELINER or any other machines which are used for excavation of foundation of Stone masonry structures.
Red/Red Sandy/Black Soils...
Providing and laying in position plain cement concrete of mix 1:4:8 with OPC cement @ 180Kgs, with 40mm and down size graded granite metal jelly @ 0.85Cum and sand @ 0.57Cum, Machine mixed, concrete l...
a) Providing and constructing Granite/Trap/Basalt Rubble stone machinery in foundation with cement mortar 1:6 with OPC cement @82.5Kgs, with sand @0.35Cum and 1.1Cum rubble stones not less than 0.3m. ...
EXCAVATION OF FOUNDATION AS PER DESIGN SPECIFICATION (Up to 1 m depth) a) Foundation excavation for COF/ waste weir.
Providing and Laying in position plain cement concrete of mix 1:3:6 with OPC cement @ 220Kgs, with 20mm and down size graded granite metal jelly @ 0.84Cum and sand @ 0.56Cum, Machine mixed, concrete l...
a) Cement Pointing: Pointing walls built in size stone or rubble Granite/Lateritic Stones in 1:3 cement sand mortar, curing and other works complete.
PROPOSED FOR MICRO WATERSHED TREATMENT AT ALLUR B VILLAGE OF CHITTAPUR TALUKA TRENCH CUM BUND BLOCK-I
MACHINERY WORKS: Rates for Soil and Water Conservation works when JCB/POKELINER or any other machines which are used for excavation of foundation of Stone masonry structures.
Red/Red Sandy/Black Soils...
Providing and laying in position plain cement concrete of mix 1:4:8 with OPC cement @ 180Kgs, with 40mm and down size graded granite metal jelly @ 0.85Cum and sand @ 0.57Cum, Machine mixed, concrete l...
a) Providing and constructing Granite/Trap/Basalt Rubble stone machinery in foundation with cement mortar 1:6 with OPC cement @82.5Kgs, with sand @0.35Cum and 1.1Cum rubble stones not less than 0.3m. ...
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .