| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.6 LAccepted-Finance | L1 | Accepted-Finance Agreement With L1 | |
| 2 | L2₹24.7 L+₹4,302.45 (0.17%)Rejected-Finance | L2 | Rejected-Finance Agreement With L1 | |
| 3 | L3₹24.7 L+₹9,626.95 (0.39%)Rejected-Finance | L3 | Rejected-Finance Agreement With L1 |
| Sl No | Description | Qty | Unit | M/S N.K. CONTRACTOR L1 | Akash Contractor L3 | DALMENDRA SINGH L2 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in foundation of Bridge etc. in ordinary soil excavation to be in the form of regular Pits and Earth Work in embankment to be in 20cm. layer including ramming and dressing the surface to the required levels and slopes. and also including 30 m lead and all lifts the earth from cutting to be used in making Canal Section or to be deposited in Spoil Bank as per direction of Engineer in charge in the section. | 472.85 | Cum | 70 ₹33,099.5 | 40 ₹18,914 Lowest | 65 ₹30,735.25 |
| 2.00 | C.C. 1:3:6 M-10 in foundation of Crust wall, Toe wall or pitching including cost of all labour and T&P etc. Complete. | 60.54 | Cum | 4,300 ₹2,60,322 | 5,800 ₹3,51,132 | 4,100 ₹2,48,214 Lowest |
| 3.00 | R.C.C. (M-20) in WING WALL including cost of all labour and T&P etc. Complete. | 218.81 | Cum | 5,400 ₹11,81,574 Lowest | 6,650 ₹14,55,086.5 | 5,750 ₹12,58,157.5 |
| 4.00 | Ordinary Centering and shuttering work including cost of all labour and T&P etc. Complete. | 33.93 | Sqm | 670 ₹22,733.1 | 100 ₹3,393 Lowest | 500 ₹16,965 |
| 5.00 | Special Centering and shuttering work including cost of all labour and T&P etc. Complete. | 533.2 | Sqm | 850 ₹4,53,220 | 280 ₹1,49,296 Lowest | 550 ₹2,93,260 |
| 6.00 | Laying of reinforcement in R.C.C including Cutting, Bending, Binding and Placing etc. Including cost of all labour and T&P etc. Complete as directed by Engineer-in -charge | 6.28 | M.T. | 59,000 ₹3,70,520 Lowest | 68,000 ₹4,27,040 | 72,500 ₹4,55,300 |
| 7.00 | Providing & laying 1st class (M-150) brick work with 1:4 cement mortar using cement and coarse snad including cost of all material, T&P & labours per CuM. | 2.6 | Cum | 4,400 ₹11,440 Lowest | 5,500 ₹14,300 | 5,500 ₹14,300 |
| 8.00 | Laying 12 mm thick Cement Plaster 1:4 CM using coarse sand including all cost of material, labour , T&P etc. for completion of work per SqM | 594.47 | Sqm | 150 ₹89,170.5 | 65 ₹38,640.55 Lowest | 180 ₹1,07,004.6 |
| 9.00 | finishing wall with weather coat by premium acrylic exterior paint applied @ 3.28 ltr./10sqm (Asion or Berger brand) of approved make and quality on wall with two or more coat to give an even shade including a priming coat with cement primer of approved brand and manufacturer exterior primer applied @ 2.20 kg/10sqm after thoroughly brushing the surface free from motar ropping and other foreign matters and sand papered smooth including supply of all materails labour, tools and plants etc. required for proper completion of the work. | 489.84 | Sqm | 75 ₹36,738 | 25 ₹12,246 Lowest | 80 ₹39,187.2 |
| 10.00 | Painting letters including cost of material for writing Name ,with Labour T&P etc. Complete of work . | 4 | Nos | 501 ₹2,004 | 100 ₹400 Lowest | 500 ₹2,000 |
Tender Value
₹33.4 L
EMD Value
₹66,800
Closing Date
14 Oct 2026, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
OFFICE OF THE EXECUTIVE ENGINEER ANOOPSHAHAR BRANCH DIVISION GANGA CANAL MEERUT
TN-08/EE/2026-27 Boxing work etc. of bridges located at Km 62.850 and Km 64.100 of Anupshahr Branch Canal. LOT-04
2026_UPIDC_1192818_4
TN-08/E.E/2026-27
Open Tender
Civil Works
Piece-work
90 days
As Per NIT
As per NIT and TD
3 documents required · 3 mandatory
₹944
₹66,800
17 Oct 2026
5 Oct 2026
14 Oct 2026
5 Oct 2026
14 Oct 2026
5 Oct 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation of Bridge etc. in ordinary soil excavation to be in the form of regular Pits and Earth Work in embankment to be in 20cm. layer including ramming and dressing the surface to the required levels and slopes. and also including 30 m lead and all lifts the earth from cutting to be used in making Canal Section or to be deposited in Spoil Bank as per direction of Engineer in charge in the section. | 472.85 | Cum | - | - |
| 2 | C.C. 1:3:6 M-10 in foundation of Crust wall, Toe wall or pitching including cost of all labour and T&P etc. Complete. | 60.54 | Cum | - | - |
| 3 | R.C.C. (M-20) in WING WALL including cost of all labour and T&P etc. Complete. | 218.81 | Cum | - | - |
| 4 | Ordinary Centering and shuttering work including cost of all labour and T&P etc. Complete. | 33.93 | Sqm | - | - |
| 5 | Special Centering and shuttering work including cost of all labour and T&P etc. Complete. | 533.2 | Sqm | - | - |
| 6 | Laying of reinforcement in R.C.C including Cutting, Bending, Binding and Placing etc. Including cost of all labour and T&P etc. Complete as directed by Engineer-in -charge | 6.28 | M.T. | - | - |
| 7 | Providing & laying 1st class (M-150) brick work with 1:4 cement mortar using cement and coarse snad including cost of all material, T&P & labours per CuM. | 2.6 | Cum | - | - |
| 8 | Laying 12 mm thick Cement Plaster 1:4 CM using coarse sand including all cost of material, labour , T&P etc. for completion of work per SqM | 594.47 | Sqm | - | - |
| 9 | finishing wall with weather coat by premium acrylic exterior paint applied @ 3.28 ltr./10sqm (Asion or Berger brand) of approved make and quality on wall with two or more coat to give an even shade including a priming coat with cement primer of approved brand and manufacturer exterior primer applied @ 2.20 kg/10sqm after thoroughly brushing the surface free from motar ropping and other foreign matters and sand papered smooth including supply of all materails labour, tools and plants etc. required for proper completion of the work. | 489.84 | Sqm | - | - |
| 10 | Painting letters including cost of material for writing Name ,with Labour T&P etc. Complete of work . | 4 | Nos | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.18 MB
Tendernotice_2.pdf
PDF • 1.99 MB
BOQ_2251485.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .