Tender Value
₹40.7 L
EMD Value
₹81,360
Closing Date
10 Oct 2026, 2:00 pm
Executive Engineer Construction Leh
Executive Engineer Construction Leh
Construction of additional classroom for at high school Igoo leh
2026_PWD_19612_1
CDL 79 of Leh of 2026-27
Open Tender
Civil Works - Buildings
Percentage
60 days
Leh
Please refer Tender documents.
4 documents required · 4 mandatory
₹500
Executive Engineer Construction Leh
₹81,360
24 Sept 2026
24 Sept 2026
12 Oct 2026
24 Sept 2026
10 Oct 2026
24 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) in
foundation trenches or drains (not exceeding 1.5m in width or 10sqm on plan),
including dressing of sides and ramming of bottoms, lift upto 1.5m, including
getting out the excavated soil and disposal of surplus excavated soil as directed,
within a lead of 50 m. | 143.26 | Cum | 278.09 | ₹39,839.17 |
| - | Filling availableexcavatedearth (excluding rock) in trenches, plinth, sides of
foundations etc. in layers not exceeding 20cm indepth, consolidating each
deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 114.6 | Cum | 220.41 | ₹25,258.99 |
| - | Dumping stone including cost of stones. in Horizontal on level | 24.39 | Cum | 953.03 | ₹23,244.4 |
| - | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded
stone aggregate 40 mm nominal size derived from natural sources) | 16.26 | Cum | 5,725.33 | ₹93,093.87 |
| - | Centering and shuttering including strutting, propping etc. and removal of form for:Foundation,Plinth Beam, footing bases of column | 43.2 | Sqm | 306.15 | ₹13,225.68 |
| - | Centering and shuttering including strutting, propping etc. and removal of form for: Lintel, beams, plinth beams, girders, bressumers and cantilevers. | 95.1 | Sqm | 602 | ₹57,250.2 |
| - | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts | 39.46 | Sqm | 769.01 | ₹30,345.13 |
| - | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform | 95.6 | Sqm | 738.64 | ₹70,613.98 |
| - | Centering and shuttering including strutting, propping etc. and removal of form for Edges of slabs and breaks in floors and walls Above 20 cm wide | 42.68 | Mtr | 266.48 | ₹11,373.37 |
| - | Random rubble masonry with hard stone in foundation and plinth including
levelling up with cement concrete 1:6:12 (1 cement :6 coarses and:12 graded
stone aggregate 20 mm nominal size) upto plinth level with :
Cement mortar 1:6 (1 cement : 6 coarse sand) | 17.28 | Cum | 5,730.42 | ₹99,021.66 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
BOQ_46386.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .