Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹70.6 LAccepted-AOC CAMP VILLAGE DEVGAI POST KUDARI SHAHDOL MP | NOWROZABAD | UMARIA | MADHYA PRADESH | 484110 | L-1 | Accepted-AOC Accepted as l-1 | |
| 2 | L-2₹70.9 L+₹27,798.84 (0.39%)Rejected-Finance AMLAI COLLIERY ANUPPUR MADHYA PRADESH 484114 | AMLAI | ANUPPUR | MADHYA PRADESH | 484114 | L-2 | Rejected-Finance Rejected as L-2 | |
| 3 | Rejected-Technical CAMP DHANPURI NO 01 DHANPURI DIST SHADOL MP | DHANPURI | SHADOL | MADHYA PRADESH | 484114 | - | Rejected-Technical Rejected |
Tender Value
₹64.7 L
EMD Value
₹80,900
Closing Date
27 Jan 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Staf Officer Mining
Staff Officer (Mining), SECL Sohagpur Area, PO- Dhanpuri, Distt- Shahdol (MP), Mobile No.-9425533459
Construction of 25 Nos. RCC Isolation stoppings in Depillaring Panel ( CM Panel C1 and C2) in VI Top Seam at Bangwar UG Mne
2025_SECL_325385_1
SECL/SGP/SO(M)/e-T/35/24-2 5/673 Dt09.01.2025
Open Tender
Civil Works - Others
Item Rate
365 days
Bangwar UG MIne
As per NIT
10 documents required · 10 mandatory
₹80,900
26 Mar 2025
10 Jan 2025
29 Jan 2025
10 Jan 2025
27 Jan 2025
11 Jan 2025
10 Jan 2025 - 20 Jan 2025
Amount
Item Description/ Heading Part (A) labour Cost
Cleaning removal of debris/stone from galleries and stacking withi 50m distance
Cutting in soft stonel by using chisel/pick-axe
Cutting of coal by using chiselhammer
RCC (1:2:4) in wall/roof ceiling of air crossing/ stopping (any thickness) in u/g (Excluding centring, shuttering, reinforcement cutting, bending, placing in position and binding etc all complete as well as cost of RCC materials)
Cement concrete/PCC (1:2:4) in foundation /plinth / flooring/wall (any thickness) in u/g (Excluding centring, shuttering and cost of CC materials)
Centring, shuttering, finishing and reinforcement including cutting, bending, placing in position and binding and strutting, propping etc complete
6mm Thick cement plaster ratio of 1:4 to RCC/PCC work in u/g including curing etc complete(exclusive cost of material)
white washing in ug with white lime to give an even shade on old work/new work
Loading of all kinds of building materials into Tub at Incline/pit mouth on surface with lead of 50m Cement
stone aggregate 20mm
steel 12mm
Transportaion of all kind of building materials from surface to u/g through haulages with tramming & pushing coupling & uncoupling etc for a distance 02 KM or part there of and bringing the empty tub to the surface Cement
stone aggregate 20mm
steel 12mm
Un-loading of all kinds of building materials from tubs at destination in u/g and stacking the same Un-loading of all kinds of building materials from tubs at destination in u/g and stacking the same Cement
stone aggregate 20mm
steel 12mm
Lead for transportatin of materials y manual upto 75m
Part-B Material Cost supply and stacking of building materials Cement
Stone chips
Steel rod(12mm)
Total impact of GST for the purpose of CTC
UDAY RAJ SINGH (BID ID -1121685)
techsummary_337288.pdf
PDF • 3.76 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_337288.pdf
PDF • 0.09 MB
LOI673.pdf
PDF • 1.65 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .