Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.1 LAccepted-AOC | 1 | Accepted-AOC 1 | |
| 2 | 2₹1.1 L+₹1,900 (1.68%)Rejected-AOC BYPASS NH NEAR SBI SIDHRA JAMMU | 2 | Rejected-AOC 2 | |
| 3 | 3₹1.2 L+₹4,700 (4.17%)Rejected-AOC BHAGWATI NAGAR JAMMU | 3 | Rejected-AOC 3 | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.4 L
Closing Date
18 Sept 2021, 3:00 pmClosed
Executive Engineer MID Akhnoor/Nowshera
Office of the Executive Engineer MID Akhnoor/Nowshera
Repairs to HC pump unit no. 02 along with other allied works at LIS Seripalai.
2021_IFC_138975_1
53/MID/AN
Open Tender
Machineries/ Mechanical Engg Items
Item Wise
10 days
Akhnoor
Please refer Tender documents.
7 documents required · 7 mandatory
₹200
Yes
Executive Engineer MID Akhnoor/Nowshera
Exempted
Office of the Executive Engineer MID Akhnoor/Nowsh
13 May 2022
11 Sept 2021
20 Sept 2021
11 Sept 2021
18 Sept 2021
12 Sept 2021
14 Sept 2021
Repairs to 135 HP 3 phase induction motor installed at LIS Serpalai . The job involves dismantling of motor from its installed position after disconnecting the power supply of all three phases. Dismantling the motor by unfastening the foundation nuts and bolts and also decoupling from the pump. Lifting the motor with chain pulley block with proper care to prevent any damage to suitable place for repair for motor at the site of LIS . Complete dismantling of the motor and extraction of rotor . Extraction of burnt winding from the stator, cleaning of stator with petrol .P/F of new winding wire of suitable gauge & size in the stator, varnishing the stator winding with superior quality of varnish. Drying the stator winding with hot air circulation process. P/F of 1 no. driving end bearing ( NU 316) . Assembling of the motor. Refitting the motor at its installed position and coupling with pump by way of lowering it with the help of chain pulley block, making of electrical connections, alignment with pump , testing of motor on full load. Complete job includes the cost of material, labour charges, hiring charges of tools & tackles, transportation charges. Complete job
Repair to 4 cusec discharge 60m Head H.C pump no. 02 installed at LIS Seripalai De-coupling of pump from the motor and removing the top cover extraction of shaft and impeller assembly together with bearing bracket and shifting to workshop by using manual labour and mechanical transport. Complete dismantling of impeller assembly .Rebuilding of pump shaft at damaged spots by remetalling . Providing/ fitting of DE and NDE bearings(6310- 2nos.), bushes (2nos) in lieu of worn out ones. Fabrication of glands and studs with nut. Fabrication of neck rings as per sample. Repair to bearing brackets. Re-assembling of impeller shaft assembly and shifting back to site and there after lowering at proper position, placement of oil seal and closing the top cover along with P/F new nuts and bolts and studs coupling with motor. P/F of gland packing etc.and testing on load .. The Job includes cost of material, labour(skilled and unskilled) loading charges hire charge of tool and tackles To and transportation charges. Complete job
G S ENGINEERING WORKS
BEE AAR ENTERPRISES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .