Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹11.2 LAccepted-Finance 147 A BASEMENT SANT NAGAR EAST OF KAILASH NEW DELHI 110 065 | SOUTH | DELHI | 110065 | ₹11.2 L | L-1 | Accepted-Finance AOC is being Awarded to the lowest bidder |
| 2 | L-2₹12.9 LRejected-Finance | ₹12.9 L | L-2 | Rejected-Finance Rejected for being other than lowest |
| 3 | L-3₹17.8 LRejected-Finance | ₹17.8 L | L-3 | Rejected-Finance Rejected for being other than lowest |
| Sl No | Description | Qty | Unit | Janya Associates L2 | Harrysons Consultants Private Limited L3 | Sakhuja Mallick and Associates L1 |
|---|---|---|---|---|---|---|
| 1.00 | Topographical Survey | 80 | Per Acre | 780 ₹62,400 | 4,100 ₹3.3 L | 3,200 ₹2.6 L |
| 1.01The survey works shall be carried out to facilitate comprehensive planning and design of infrastructure including buildings, internal roads, culverts, surface drainage, and overall site development. The work shall be executed using modern survey techniques to achieve high accuracy and detailed topographic information. Necessary site clearance also to be done to execute the survey work if required . 1. Topographical Survey • Conduct detailed topographic survey of the entire project area using Total Station, GPS/DGPS, and Auto Level instruments. • Mark all existing physical features such as: o Natural features: Trees, ground undulation, water bodies, low-lying areas, rock outcrops. o Man-made features: Existing buildings, roads, drains, utilities (OH/UG lines, poles, pipelines). • Preparation of contour maps at suitable intervals (preferably 0.25 m to 0.5 m) for assessing terrain profile and gradient. 2. Boundary Survey and Demarcation • Demarcate the boundary of the land parcel with reference to existing land records or revenue maps. • Fix permanent benchmarks and reference pillars using concrete/masonry pillars for future referencing. • Record the geo-coordinates (latitude, longitude, elevation) of boundary points. 3. Spot Levels and Grid Survey • Conduct grid-based spot level survey at regular intervals (typically 5m x 5m or as directed) to prepare Digital Elevation Models (DEMs) and for planning of grading and drainage. • Take additional levels at significant terrain features, depressions, high points, roads, and junctions. | ||||||
| 1.024. Road and Alignment Survey • Survey for proposed road alignments considering connectivity, gradient, turning radii, and existing site conditions. • Mark the horizontal and vertical alignment, including chainage, road width, curves, and junctions. • Provide Longitudinal Section (L-Section) and Cross Section (X-Section) of proposed road alignments. 5. Drainage and Natural Flow Survey • Identify natural drainage patterns, flow directions, and water stagnation areas. • Survey existing nallahs/streams and any man-made storm water systems. • Recommend invert levels and alignments for surface drains, culverts, and other stormwater structures. 6. Culvert & Water Crossing Survey • Survey existing culverts and propose locations for new culverts based on road layout and water flow. • Collect data on width, depth, slope, flow direction, and existing structures at crossings. 7. Utility Survey • Survey for all existing underground and overground utilities such as: o Electric lines and poles o Water supply pipelines o Sewage lines and manholes o Communication lines o Borewells and tanks | ||||||
| 1.038. Data Processing and Drawings • Preparation of AutoCAD drawings and submission of: o Topographic survey map with contours and spot levels. o Site layout showing all features and utilities. o Road alignment drawings with L-Section & X-Sections. o Drainage and culvert layout maps. • Submission of all survey data in digital and hard copy format, including Excel sheets, drawings, and KMZ/KML files Notes: • All work shall be carried out using calibrated instruments by qualified surveyors. • Benchmarks shall be established with reference to permanent GTS Benchmarks where possible. • Survey data shall be geo-referenced and suitable for GIS/CAD applications. • Benchmark /grid pillars of suitable type in concrete/masonry of standard size at desired locations including painting with identification marks, numbering, lablelling etc. complete and as directed by Engineer-in Charge. | ||||||
| 2.00Geo-Technical Investigations Preparation & Submission of detailed geo-technical reports including safe bearing capacity of soil, safe load carrying capacity of soil for particular type of foundation and bore log data etc. complete as directed by Engineer-in-Charge. | ||||||
| 2.01 | Mobilization of tools and equipment's from laboratory to site for conducting Geo-technical investigation works and topographical survey work and demobilization completely. (Area approx – 1,36,230.00 Sqm ) | 1 | Job | 30,000 ₹30,000 | 40,000 ₹40,000 | 45,000 ₹45,000 |
| 2.02Drilling through all types of soil up to required depth and collecting data and samples at depth of 01 m interval (for 3m depth – 20 Nos Bore Holes) using suitable equipments and machinery. | ||||||
| 2.03 | (a) Boring of 100/150mm dia bore holes in all types of soil. | 30 | Meter | 2,500 ₹75,000 | 4,000 ₹1.2 L | 2,200 ₹66,000 |
| 2.04 | (b) Boring in hard rock / soft rock using TC/Diamond bit and extracting rock cores of 50 mm dia. | 30 | Meter | 5,000 ₹1.5 L | 4,000 ₹1.2 L | 1,500 ₹45,000 |
| 2.05 | Carrying out various laboratory test of USD/SPT/DS sample at alternate depths (whichever is applicable) As per IS 1892 and 2131 at depth or 1 Mtr, 2 Mtr, 3 Mtr | 20 | Per Bore Hole | 8,000 ₹1.6 L | 2,500 ₹50,000 | 3,000 ₹60,000 |
Tender Value
₹21.5 L
EMD Value
₹43,060
Closing Date
13 Oct 2025, 3:00 pmClosed
CCE R N D Estates, North, Chandigarh
CCE R N D Estates North M -1026, Sector - 29A, Chandigarh - 160030
PRELIMINARY CONSULTANCY SERVICES FOR WIDENING OF ROADS AREA DEVELOPMENT AND CONSTRUCTION OF TECHNICAL BUILDINGS WITH ALLIED SERVICES AT TBRL RANGE RAMGARH
2025_DRDO_879493_1
CCE(EN)/ CHD/TECHNICAL/25-26/11405
Open Tender
Miscellaneous Works
90 days
TBRL Range Ramgarh
All contractor / firms enlisted with DCWE (DRDO) Vide Letter N. DCWE/04/C-32606/135/Cons Dated 18 Feb 2015 and 04 Aug 2015 with latest amendments under the Consultancy Services are eligible subject to fulfilling the PQ Criteria
4 documents required · 4 mandatory
₹0
₹43,060
11 Feb 2026
29 Sept 2025
14 Oct 2025
29 Sept 2025
13 Oct 2025
6 Oct 2025
Amount
Topographical Survey
The survey works shall be carried out to facilitate comprehensive planning and design of infrastructure including buildings, internal roads, culverts, surface drainage, and overall site development. The work shall be executed using modern survey techniques to achieve high accuracy and detailed topographic information. Necessary site clearance also to be done to execute the survey work if required . 1. Topographical Survey • Conduct detailed topographic survey of the entire project area using Total Station, GPS/DGPS, and Auto Level instruments. • Mark all existing physical features such as: o Natural features: Trees, ground undulation, water bodies, low-lying areas, rock outcrops. o Man-made features: Existing buildings, roads, drains, utilities (OH/UG lines, poles, pipelines). • Preparation of contour maps at suitable intervals (preferably 0.25 m to 0.5 m) for assessing terrain profile and gradient. 2. Boundary Survey and Demarcation • Demarcate the boundary of the land parcel with reference to existing land records or revenue maps. • Fix permanent benchmarks and reference pillars using concrete/masonry pillars for future referencing. • Record the geo-coordinates (latitude, longitude, elevation) of boundary points. 3. Spot Levels and Grid Survey • Conduct grid-based spot level survey at regular intervals (typically 5m x 5m or as directed) to prepare Digital Elevation Models (DEMs) and for planning of grading and drainage. • Take additional levels at significant terrain features, depressions, high points, roads, and junctions.
4. Road and Alignment Survey • Survey for proposed road alignments considering connectivity, gradient, turning radii, and existing site conditions. • Mark the horizontal and vertical alignment, including chainage, road width, curves, and junctions. • Provide Longitudinal Section (L-Section) and Cross Section (X-Section) of proposed road alignments. 5. Drainage and Natural Flow Survey • Identify natural drainage patterns, flow directions, and water stagnation areas. • Survey existing nallahs/streams and any man-made storm water systems. • Recommend invert levels and alignments for surface drains, culverts, and other stormwater structures. 6. Culvert & Water Crossing Survey • Survey existing culverts and propose locations for new culverts based on road layout and water flow. • Collect data on width, depth, slope, flow direction, and existing structures at crossings. 7. Utility Survey • Survey for all existing underground and overground utilities such as: o Electric lines and poles o Water supply pipelines o Sewage lines and manholes o Communication lines o Borewells and tanks
8. Data Processing and Drawings • Preparation of AutoCAD drawings and submission of: o Topographic survey map with contours and spot levels. o Site layout showing all features and utilities. o Road alignment drawings with L-Section & X-Sections. o Drainage and culvert layout maps. • Submission of all survey data in digital and hard copy format, including Excel sheets, drawings, and KMZ/KML files Notes: • All work shall be carried out using calibrated instruments by qualified surveyors. • Benchmarks shall be established with reference to permanent GTS Benchmarks where possible. • Survey data shall be geo-referenced and suitable for GIS/CAD applications. • Benchmark /grid pillars of suitable type in concrete/masonry of standard size at desired locations including painting with identification marks, numbering, lablelling etc. complete and as directed by Engineer-in Charge.
Geo-Technical Investigations Preparation & Submission of detailed geo-technical reports including safe bearing capacity of soil, safe load carrying capacity of soil for particular type of foundation and bore log data etc. complete as directed by Engineer-in-Charge.
Mobilization of tools and equipment's from laboratory to site for conducting Geo-technical investigation works and topographical survey work and demobilization completely. (Area approx – 1,36,230.00 Sqm )
Drilling through all types of soil up to required depth and collecting data and samples at depth of 01 m interval (for 3m depth – 20 Nos Bore Holes) using suitable equipments and machinery.
(a) Boring of 100/150mm dia bore holes in all types of soil.
(b) Boring in hard rock / soft rock using TC/Diamond bit and extracting rock cores of 50 mm dia.
Carrying out various laboratory test of USD/SPT/DS sample at alternate depths (whichever is applicable) As per IS 1892 and 2131 at depth or 1 Mtr, 2 Mtr, 3 Mtr
Conducting CBR (California Bearing Ratio) test for construction of road and pavements.
Consultancy services for required infrastructure for project by preparing Master Layout Plan/Line diagrams/Plans/Sections etc. with reference to the following: The consultant shall provide consultancy services for comprehensive planning of infrastructure to be created for the facility, including but not limited to the following: a) Preliminary Architectural Planning: • Preparation of conceptual and detailed architectural drawings. • Space planning and designing of all buildings and related structures. •Planning of roads, hardstanding, Cross Drainage, drainage system, Boundary/fencing and gates & Retaining wall, parking areas, landscaping, Rainwater Harvesting and open spaces. b) Preliminary Planning for Services required for the project for Electrical Installations, Power Backup, Water Supply System, Sanitary Installations & Drainage, HVAC Systems, Fire Fighting System, Communication System, Security & Surveillance Systems, Access Control etc. required for the project.
Preparation & submission of Approximate Estimate (AEs) based on latest DSRs with MR analysis & supporting quotations etc. complete for buildings, external services, furniture, special items of works etc. all as directed by Engineer-in-Charge. Note: (I) AEs to be prepared for Scope of Work given at Appendix ‘C’ of Tender Enquiry. (ii) AEs for road is to be prepared as per design based on site survey, geo tech investigation and traffic data given. (iii) Rest AEs will be based on latest PAR/DSR Rates/GeM alongwith all supporting documents and quotations. (iv) List of deliverables will be as per Para A4, B12, C5 and D of Appendix ‘D’ of Tender Enquiry.
Janya Associates (BID ID -3295501)
Harrysons Consultants Private Limited (BID ID -3296048)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid