Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5.9 L
EMD Value
₹29,650
Closing Date
11 Mar 2026, 6:55 pmClosed
EXECUTIVE ENGINEER REW BUDGAM
RDD COMPLEX BUDGAM
CONSTRUCTION OF RCC CULVERT AT KHAR MOHALLA DHARMUNAH
2026_RDPR_305318_12
NIT_141_REW BUDGAM OF 2025-26
Open Tender
Civil Works
Percentage
30 days
SOIBUGH
3 documents required · 3 mandatory
₹300
Executive Engineer REW Budgam
₹29,650
12 Mar 2026
5 Mar 2026
12 Mar 2026
5 Mar 2026
11 Mar 2026
5 Mar 2026
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soils
Providing and laying of dry stone soling duly hand packed including carriages by all means.
providing & laying of RCC including curing but excluding the cost of centering,shuttering ,finishing and reinforecement in 1:2:4 mix 20 mm aggregate size.
Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Steel reinforecement for RCC work including straightening,cutting ,bending placing in position and binding all complete
Centering and shuttering including strutting, propping etc. and removal of formwork for:Foundations, footings, bases of columns etc. for mass concrete.
Centering and shuttering including strutting, propping etc. and removal of formwork for slabs
Carriage of stone soling 20 KM avg lead
Carriage of agg 20 KM avg lead
Carriage of sand 30 KM avg lead
Add Provision for CIB<Photographs and painting for design of SBM Logo as directed by Engineer incharge.
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
BOQ_991681.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .