| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹14.5 LAdmitted-Fee/PreQual/Technical/Finance | -0.50% | ₹14.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹14.6 L+₹7,017.60 (0.48%)Admitted-Fee/PreQual/Technical/Finance | -0.02% | ₹14.6 L+₹7,017.60 (0.48%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹14.6 L+₹7,163.80 (0.49%)Admitted-Fee/PreQual/Technical/Finance 0 CHINHAT LUCKNOW UTTAR PRADESH 227105 UDYAM UP 50 0067162 | 227105 | -0.01% | ₹14.6 L+₹7,163.80 (0.49%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹14.6 L
EMD Value
₹73,000
Closing Date
28 Mar 2026, 12:00 pmClosed
BDO Gulaothi
BDO office Gulaothi
Work no 4 Gram Asifabad Chandpura Me Yameen Ke Makan Se Jahid Ke MAkan TAk And Furkan Ke MAkan Se Madrse Hote Hue Talab Tak CC Road Nirman Karya
2026_RDUP_1129138_1
591/BLOCK GULAOTHI/2025-26 Dt 07-3-2026
Open Tender
Civil Works
Percentage
90 days
Gulaothi
Tender Fee, EMD and Other Documents as per Tender Document/NIT
2 documents required · 2 mandatory
₹1,770
Block Development Officer
₹73,000
28 Mar 2026
23 Mar 2026
28 Mar 2026
23 Mar 2026
28 Mar 2026
23 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | - | cum | - | - |
| - | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 With 3 Km Cartage Including. | - | cum | - | - |
| - | Construction of granular sub base by providing well graded material spreading in uniform layers with Tractor mount grader on prepared surface mixing by mix in place method Tractor with rotavator at OMC,and compacting with Three wheel 80-100 KN Static Roller to achieve the desire density,complete as per technical specification clause 401. By Manual Means | - | cum | - | - |
| - | Brick masonry work in cement mortar in substructure complete excepting pointing and plastering, as per drawing and technical specification Clauses 602, 603, 604, 1202 & 1204 | - | cum | - | - |
| - | P.C.C. grade M 20 Nominal mix (1:2:4) ( Hand mixed), Plain/rainforced cement concrete in substructure complete as per drawings and technical specifications Clause 802, 804,805,806,807,1202 1202 & 1204 | - | cum | - | - |
| - | Providing, laying, spreading and compacting WBM grading-3 stone aggregates of specific sizes to water bound macadam specifications i/c spreading in uniform thickness, hand packing, rolling with three wheeled static roller in stages to proper grde and camber, applying and brooming requisite type of screening/binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density,complete as per technical specification clause 405. By Mechanical Means | - | cum | - | - |
| - | Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204 | - | sqm | - | - |
| - | Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 | - | cum | - | - |
| - | Supply & Fixing of Informatory Sign board at site including letter, writing, painting etc all comp at site. | - | Nos | - | - |
| - | Less 5% CPE | - | Percentage | - | - |
stage.html
html • 0.02 MB
finance_2106274.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
BOQ_2106274.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .