| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.7 LAccepted-AOC 58 PIDARI EAST STREET SIRKAZHI MAYILADUTHURAI 609110 | MAYILADUTHURAI | TAMIL NADU | 609110 | ₹43.7 L Quoted ₹48.2 L | L1 | Accepted-AOC Tender Accepted |
| 2 | L2₹48.2 L+₹7,246 (0.15%)Rejected-Finance | ₹48.2 L+₹7,246 (0.15%) | L2 | Rejected-Finance Other than Lowest Tenderer |
| 3 | L3₹50.7 L+₹2.6 L (5.32%)Rejected-Finance 92 VENKATESA GRAMANI STREET CHINTADRIPET CHENNAI 600 002 | NA | NA | 600002 | ₹50.7 L+₹2.6 L (5.32%) | L3 | Rejected-Finance Other than Lowest Tenderer |
Tender Value
₹43.8 L
EMD Value
₹32,000
Closing Date
23 Feb 2026, 3:00 pmClosed
The Divisional Engineer (H), C and M Mayiladuthura
O/o the Divisional Engineer (H), C and M Mayiladuthurai, Thennamarasalai, Mayiladuthurai
Junction Improvement at Km.31/950 Kumbakonam - Sirkali Road
2026_HWAY_656896_1
TN.22/2025-2026/JDO
Open Tender
Civil Works - Roads
Percentage
60 days
Mayiladuthurai
As per Tender Document
6 documents required · 6 mandatory
₹0
₹32,000
4 Mar 2026
13 Feb 2026
23 Feb 2026
13 Feb 2026
23 Feb 2026
16 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, atering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For Box Cutting | 621 | Cubic metre | 131.89 | ₹81,903.69 |
| 2 | Providing, laying, spreading and compacting graded stone aggregates for Granular Sub Base, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using motor grader in Sub Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 (Grade-V) | 221.4 | Cubic metre | 3,182.12 | ₹7,04,521.37 |
| 3 | Providing, laying, spreading and compacting graded stone aggregates for Granular Sub Base, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using motor grader in Sub Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 (Grade-III) | 108 | Cubic metre | 3,455.16 | ₹3,73,157.28 |
| 4 | Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using motor grader in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 | 270 | Cubic metre | 3,695.34 | ₹9,97,741.8 |
| 5 | Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 502 of MORTH Rev-5 | 1,080 | Square metre | 88.49 | ₹95,569.2 |
| 6 | Providing and laying Tack Coat over WBM/ WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 | 1,080 | Square metre | 20.73 | ₹22,388.4 |
| 7 | Providing,laying 50 mm consolidated thick Bituminous Macadam using 0.20 cum of 26.50-13.20 mm, 0.43 cum of 13.20-2.36 mm and 0.08 cum of 2.36 mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing the min required temperatureusing Central hot mix plant 20-30 toncapacity, conveying the mix by tippertrucks to paversite, spreading the mix to uniform thickness of 50 mm with mechanical paver to the specified grade sand crosssections and consolidated by 8-10 tonne Vibratory Roller to there quired densityetc., including labour for attending to paver to siteetc., including hire and fuel charges for 20-30 tCMP with bitumen boiler, tippertrucks, PaverFinisher, Vibratory roller and all other tools and plan trequired, including all other inciden talchargesetc.,completeasperspecificationusing CMP as per clause 504 of MORTH Rev-5 | 54 | Cubic metre | 10,583.42 | ₹5,71,504.68 |
| 8 | Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc.,
complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 32.4 | Cubic metre | 13,235.43 | ₹4,28,827.93 |
| 9 | Providing Barrier Type Kerb for median /island susing vibrated cement concrete of grade M20 (1:1.5:3)using 20 and 12mm ISS HBG metal from approved quarry, including cost and conveyance of all materials to work site, including hire and fuel charges of all the machinerie semployed for this work, including all labour charges for mixing, laying, curing, painting, including all other incidental charges etc.,complete as per drawing and standard specification. | 140 | Runing Metre | 653.01 | ₹91,421.4 |
| 10 | Refilling with available Excavated Earth for filling in layers not exceeding limits including power roller compaction including all labour charges and incidental charges etc., complete and in accordance with standard specification as per morth Vth Rev., 305 & 2907 for berms,Center madian and Island | 12.89 | Cubic metre | 28.17 | ₹363.11 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
01PriceBid.pdf
Tender Documents • 0.38 MB
BOQ_787744.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .