| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Finance | -22.88% | ₹1.9 L | L1 | Admitted-Finance |
| 2 | L2₹2.1 L+₹18,157.61 (9.56%)Admitted-Finance | -15.51% | ₹2.1 L+₹18,157.61 (9.56%) | L2 | Admitted-Finance |
Tender Value
₹60 L
EMD Value
₹1.2 L
Closing Date
10 Aug 2026, 6:00 pmClosed
Executive Engineer PHED CD-II North Jaipur
Executive Engineer PHED CD-II North Jaipur
NIt 5 RC for Annual Rate Contract for work of Construction and commissioning of 200 mm dia Tube well including allied works with 2 years of defect liability under Jurisdiction of City DIV II(N) Jaipur.
2026_PHCJA_578697_2
NIT 4-5-6_2026 Lter 745-765 dated 28-7-2026
Open Tender
Civil Works - Water Works
Percentage
365 days
Executive Engineer PHED CD-II North Jaipur
as per RC
2 documents required · 2 mandatory
₹2,000
Executive Engineer PHED CD-II North Jaipur
₹1.2 L
Yes
Executive Engineer PHED CD-II North Jaipur
19 Aug 2026
28 Jul 2026
11 Aug 2026
28 Jul 2026
10 Aug 2026
28 Jul 2026
31 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of tube well from ground level & up to 100 mtr depth to accommodate housing and assembly pipe of following sizes in all type of alluvium strata unconsolidated formation such as pebbles, boulders etc. by percussion/rotary drilling method as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended upto date) and technical specifications, with gravel as per IS:4097-1967 and it's packing as per IS: 2800 (Part I & II) 1979 as amended up to date (the work includes the cost of gravel & it's primary packing and packing during development, lowering of housing & strainer assembly pipes with supply and wrapping of coir-rope, wherever necessary for arresting fine sand particles and development work, but excluding the cost of housing and strainer pipe assembly). The work would be completed after obtaining sand free water.
Nominal bore 200 mm dia. | 1 | MTR | 1,523 | ₹1,523 |
| 2 | Add 15% extra on above item (Item no 2.1.1 to 2.1.3) for drilling depth beyond 100 mtr and upto 200 mtr, rate shall be applicable for only extra depth beyond 100 mtr and up to 200 mtr. | 1 | MTR | 1,751.45 | ₹1,751.45 |
| 3 | Construction of tube well after completion of drilling by rotary /percussion method &upto 100 mtr. depth in all type of rocks by DTH system as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended upto date) and technical specifications. The work shall be deemed completed only after obtaining sand free water. The bore well should have a throughout nominal size bore beyond casing pipe.
Nominal bore 200 mm dia. | 1 | MTR | 1,263 | ₹1,263 |
| 4 | Add 15% extra on above item (Item No 2.3.1 to 2.3.2) for drilling depth beyond 100 mtr and up to 200 mtr from ground level, rate shall be applicable for only extra depth beyond 100 mtr and up to 200 mtr. | 1 | MTR | 1,452.45 | ₹1,452.45 |
| 5 | Add 30% extra on above item (Item No 2.3.1 to 2.3.2) for drilling depth beyond 200 mtr and from ground level, rate shall be applicable for only extra depth beyond 200 mtr . | 1 | MTR | 1,641.9 | ₹1,641.9 |
| 6 | Construction of Tube Well up to 100 mtr. depth in all type of rocks by DTH system & over burden to accommodate casing pipe of following sizes in all types of soils & over burden including lowering of casing pipes, (if required) excluding cost of casing pipes, as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended upto date) and technical specifications. The work would be completed after obtaining sand free water. The tube well should have a through out bore as per nominal dia of casing pipe.
Nominal bore 200 mm dia. | 1 | MTR | 1,089 | ₹1,089 |
| 7 | Add 15% extra on above item (Item No 2.4.1 to 2.4.2) for drilling depth beyond 100 mtr and up to 200 mtr from ground level, rate shall be applicable for only extra depth beyond 100 mtr and up to 200 mtr. | 1 | MTR | 1,252.35 | ₹1,252.35 |
| 8 | Add 30% extra on above item (Item No 2.4.1 to 2.4.2) for drilling depth beyond 200 mtr and from ground level, rate shall be applicable for only extra depth beyond 200 mtr . | 1 | MTR | 1,415.7 | ₹1,415.7 |
| 9 | Construction of tube well from ground level and up to 100 mtr depth and above to accommodate housing assembly pipe in all type of unconsolidated formation such as pebbles, boulders, collapsible formation etc. by Odex drilling method as per IS: IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications. The work will include lowering of housing and strainer pipe assembly and casing shoe including cost of casing shoe, but excluding cost of the casing pipe. The work would be completed after obtaining sand free water.
Nominal bore 200 mm dia. | 1 | MTR | 1,670 | ₹1,670 |
| 10 | Add 15% extra on above item (Item No 2.6.1 to 2.6.3) for drilling depth beyond 100 mtr, rate shall be applicable for only extra depth beyond 100 mtr . | 1 | MTR | 1,920.5 | ₹1,920.5 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
NITNO05TWlatest.pdf
Tender Documents • 16.82 MB
BOQ_1028468.xls
BOQ • 0.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .