Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 14 147 VASUNDHRA GHAZIABAD SECTOR 14 VASUNDHRA VASUNDHRA GHAZIABAD UTTAR PRADESH 201012 | GHAZIABAD | UTTAR PRADESH | 201012 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹9.0 L
EMD Value
₹9,100
Closing Date
8 Dec 2020, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EDC-I
HYDEL COLONY BULANDSHAHR
SHIFTING OF LINE AND POLE REASON OF ROAD WIDENING UNDER DEPOSIT SCHEME UNDER EUDD BSR
2020_PVVNL_533258_1
T-41/20-21
Open Tender
Electrical Works
Item Rate
90 days
BULANDSHAHR
PLZ REF TENDER DOCUMENT
2 documents required · 2 mandatory
₹1,180
SE EDC-I
₹9,100
9 Dec 2020
27 Nov 2020
8 Dec 2020
27 Nov 2020
8 Dec 2020
27 Nov 2020
90 days
Amount
fo|qr uxjh; forj.k [k.M&cq0'kgj ds dk;Z{ks= esa iw.kZ tek ;kstuk en esa lMd pkSMhdj.k gsrq ,p0Vh0@,y0Vh0 fo|qr ykbZuksa dks f'k¶V djus lEcU/kh dk;ZA
Carriage of fallowings from ESC. BSR to pit site on kachcha pacaa road including loading and unloading chagres at both ends, rcquricd for proper completion of work, distance about 0 to 60 Kms.
STP Pole 13 mtr Long.
STP Pole 11 mtr Long.
LT STP Pole 09 mtr Long.
Carriage of All line Material from store center BSR to j.e store Sub station as ACSR Rabbit conductor, ACSR Weasel conductor, ACSR Dog conductor, GI Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthig Rods, Disc Insulator Pin Insulator, TPMO Set etc.
Erection of Single pole support including complete fittings as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Grouting of Single support shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of cement, sand, birck ballast/stone ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Erection of Double pole support including complete fittings as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Grouting of Double pole shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of cement, sand, birck ballast/stone ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Carriage of All line Material from J.E store Sub station to Pit Site ACSR Rabbit conductor, ACSR Weasel conductor, ACSR Dog conductor, GI Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthig Rods, Disc Insulator Pin Insulator, TPMO Set etc.
fixing of 11 Kv Stay rod with Stay wire in proper way with Nozelling
Grouting of 11 Kv Stay rods
Laying, sagging. Stringing and binding and jumpering of ACSR Rabbit conductor, ACSR Weasel conductor, ACSR Dog conductor, newly erected pole and old existing Pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T&P, carrier etc. requried for proper completion of work.
ACSR Rabbit conductor
ACSR Dog conductor
ACSR Weasel conductor
Recived back and loding/unloding Old ACSR Weasel Conductor, ACSR Rabbit conductor, ACSR Weasel conductor, ACSR Dog conductor, From site to je store/ ESC BSR
Recived back and loding/unloding Old Pole From site to je store/ ESC BSR. STP Pole 13 mtr Long.
STP Pole 11 mtr Long.
Gutter Pole 11 mtr Long.
LT Gutter Pole
Fixing of 11KV PIN POLYMERIC INSULATOR
Fixing of 33KV PIN INSULATER WITH PIN
Fixing of 33KV DISC INSULATER WITH FiTTING
Fixing of 11KV DISC INSULATER WITH FiTTING
Fixing of 33kv cross arm
Fixing of 11kv cross arm
Fixing of 11kv earthing rod COMPLITE
Fixing of 33kv earthing rod COMPLITE
Fixing of MS Channel
Fixing of MS Angele
Fixing of GI wire 10 SWG for garding
Making Plinth of T/F
Fixing of TPMO SET COMPLETE
The folloing material is required to be supplied by the contractor and Fixing at site.
Holding clamp
Distribution Box 3 P
Aluminum Paint
Red oxide Paint
11Kv F Clamp
11kv pole Holding clamp
33kv pole Holding clamp
Bolt & nut off size.
LT clamp
LT scackle Insulator
Vivek Electricals
M/S GS Enterprises
NEHA ENTERPRISES
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .