Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹94.9 LAdmitted-Fee/PreQual/Technical/Finance | -43.05% | ₹94.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹98.3 LAdmitted-Fee/PreQual/Technical/Finance | -41.00% | ₹98.3 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹1.0 CrAdmitted-Fee/PreQual/Technical/Finance | -38.16% | ₹1.0 Cr | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹1.0 CrAdmitted-Fee/PreQual/Technical/Finance | -38.12% | ₹1.0 Cr | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹1.1 CrAdmitted-Fee/PreQual/Technical/Finance | -34.35% | ₹1.1 Cr | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.7 Cr
EMD Value
₹3.3 L
Closing Date
12 Aug 2026, 6:00 pmClosed
SE WR Circle Jaipur
SE WR Circle jaipur
Construction of Anicut at Aam ka Jhahra at Mata ji ka Nallah GP Pal PS Nadoti District Karauli
2026_WRDAS_580291_1
SE NIT 03/2026-27_Aamka jara
Open Tender
Civil Works
Percentage
365 days
under jurisdiction of EE Karauli Division
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
as per nit
₹3.3 L
Yes
17 Aug 2026
31 Jul 2026
13 Aug 2026
31 Jul 2026
12 Aug 2026
31 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Side shuttering including propping etc. complete (to achieve finish F 2 for :Block joints of foundation stilling basins buckets, aprons etc. (non -suspended horizontally laid mass concrete) | 355 | Sqm | 160 | ₹56,800 |
| 2 | Side shuttering including propping etc. complete (to achieve finish F 2 for :Retaining wall, counterfort, abutment, wing walls up stream or down- stream slope facings of dams and open faces of construction joints etc. | 1,508.86 | Sqm | 220 | ₹3,31,949.2 |
| 3 | Side shuttering including propping etc. complete (to achieve finish F 2 for :Curved edges or sides of special shapes like baffle or chute blocks, end sills, Basin Block, projected copings, extended sills, curved surfaces arches, circular ducts etc. | 683.65 | Sqm | 340 | ₹2,32,441 |
| 4 | Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement. In foundation rafts, beams, columns bases stilling basins, buckets, aprons etc. (non suspended horizontally laid mass concrete) | 553.68 | Cum | 140 | ₹77,515.2 |
| 5 | Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. Tor or ribbed bars (IS :1786-1985) | 36,575.54 | Kg. | 89 | ₹32,55,223.06 |
| 6 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. Ordinary | 250 | Sqm | 1.45 | ₹362.5 |
| 7 | Supply of wire crates in required sizes made of hot dipped G.I. Wire conforming to IS 4826 -1979 having mesh of 10 cm x 10 cm (surface area of crate will be measured) made of wire of 5 mm diameter. | 250 | Sqm | 389 | ₹97,250 |
| 8 | Filling crates with stone, in position at site including hinging with hot dipped G.I. Wire 5 mm dia, excluding cost of wire crates, including cost of stones in position complete in all respects. | 131.25 | Cum | 1,090 | ₹1,43,062.5 |
| 9 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Hard soil mixed with Kankar / boulders, Morrum | 3,711.88 | Cum | 118 | ₹4,38,001.84 |
| 10 | Add extra over item No. 1 to 8 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and un- loading wherever required | 3,711.88 | Cum | 9.5 | ₹35,262.86 |
stage.html
html • 0.00 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.00 MB
Tendernotice_1.pdf
PDF • 1.70 MB
Aamkajar.pdf
Tender Documents • 1.19 MB
BOQ_1031118.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].