| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.9 LAccepted-AOC A WARD PLOT NO 96 2 T P SCHEME NO 2 SIDDHI APARTMENTS DUDHALI KOLHAPUR 416 012 MAHARASHTRA | KOLHAPUR | MAHARASHTRA | 416012 | ₹29.9 L Quoted ₹25.0 L | L1 | Accepted-AOC Being L1 |
| 2 | L2₹26.0 L+₹1.1 L (4.25%)Rejected-Finance | ₹26.0 L+₹1.1 L (4.25%) | L2 | Rejected-Finance Not Being L1 |
| 3 | L3₹26.2 L+₹1.2 L (4.92%)Rejected-Finance MHALASA ROAD BINAGA TALUKA KARWAR DISTRICT UTTAR KANNADA KARNATAKA 581307 | KARWAR | UTTAR KANNADA | KARNATAKA | 581307 | ₹26.2 L+₹1.2 L (4.92%) | L3 | Rejected-Finance Not Being L1 |
| Sl No | Description | Qty | Unit | Ideal Infrastructure and Consultants L1 | MHALASA CONSTRUCTIONS L3 | Ms V. S. NAYAK L2 |
|---|---|---|---|---|---|---|
| 1.00 | Material and Labour for removing the existing APP membrane/or any water proofing layer over the concrete surface & clean the surface free of dirt, dust, laitance etc. using wire brush, grinding machine and water jet machine and allow the surface to dry. Opening the cracks, if any, in V/U shape using electrically operated cutting machine. Cleaning the surface thoroughly from dust and loose particles using wire brush and air blower and treat it with the crack filler. (ii) After the proper cleaning opening the debonded surface at the terrace area and removing the same completely and cleaning the same applying the one coat of bonding agent of home sheild advance latex plus direct material and allow it to dry for 30 mins and fill the area with cement, sand, water and advance latex plus completely to give the bonding to the old surface and flow of water to the outlests. | 150 | Sqm | 750 ₹1,12,500 | 600 ₹90,000 Lowest | 900 ₹1,35,000 |
| 1.01(iii) Supplying and Applying of Berger Paints Home shield super latex + as bond coat ocer the cleaned surface, and allow it to dry for 2-3 hours for the propper penetration of the material and seal the max porosity inside the concrete slab. (iv) Supplying and applying of the water based Elastomeric PU membrane having good crack bridging and waterproofing property over the concrete surface Berger PU Roofkoat in 2 coats one is vertical and another one is horizontally applied to give the better waterproofing to the existing surface on the terrace and parapet wall to have the better bonding for the longer period. | ||||||
| 2.00 | Demolition of Cement concrete of any description and position all as specified and directed. | 10 | Cum | 600 ₹6,000 | 500 ₹5,000 Lowest | 1,500 ₹15,000 |
| 3.00 | M&L for Cement concrete 50mm thick type B-1, 1:2:4 (20mm graded aggregate) as in flooring complete all as specified and directed. | 200 | Sqm | 300 ₹60,000 Lowest | 375 ₹75,000 | 330 ₹66,000 |
| 4.00 | Material and labour for removing and cleaning all floor surface to make it free from dirt, dust, loose particles, wax, polish, efflorescence, laitance, curing compound and other contaminants.Mechanical surface profiling to be provided by grit or shot blasting/grinding/ scarification. Creating network of grooves 2mm X 2mm size & 2 X 2 Sq M grids in the coating area along with periphery, complete as per manufacturer's specification.Providing and applying Apcoflor HFP 120 /Apcoflor HFP 130 or equivalent in Fosroc/Sikka/Berger, solvent free epoxy primer 200 gms/SqM in two coats using a brush or short / medium pile roller at a time gap of 8 hrs by ensuring a uniform coating is achieved and compensated the differences in surface porosity, allowing second coat to dry for 24 Hrs, as per manufacturer's specification. | 850 | Sqm | 2,200 ₹18,70,000 | 2,100 ₹17,85,000 Lowest | 2,150 ₹18,27,500 |
| 4.01All cracks and construction joints should be either filled with epoxy putty or mortar. Providing and installing, Apcoflor LSC3 XL or equivalent in Fosroc/Sikka/Berger high performance, epoxy resin flooring screed by mixing all 3 components using heavy duty slow speed drilling machine fixed with mixing paddle, pouring of mixed material on the primed surface and spreading it using suitable trowel at 2mm thickness at consumption of 3.5 - 3.9 Kg/SqM. Gently rolling the surface of Apcoflor LSC3 XL or equivalent using bubble roller for uniform spreading followed by spike roller to remove the entrapped air, as per manufacturer's specification.Providing and installing, Apcoflor SL1 TC or equivalent , high performance, epoxy resin flooring system by mixing all components including pigment, using heavy duty slow speed drilling machine fixed with mixing paddle, pouring of mixed material on the primed surface and spreading it using suitable trowel at 1mm thickness at comsumption of 1.7 - 1.9 Kg/SqM. Gently rolling the surface of Apcoflor SL1 TC using bubble roller for uniform sprading followed by spike roller to remove the entrapped air, as per manufacturer's specification | ||||||
| 5.00 | S&F 2mm thick PVC tiles/sheets,laminated plain coloured,marbled mosaic or mottle finish,laid with approved rubber based adhesive in floors complete all as specified and directed. | 200 | sqm | 750 ₹1,50,000 Lowest | 1,500 ₹3,00,000 | 900 ₹1,80,000 |
| 6.00 | S&F Solid PVC wall lining consisting of 5mm thick plain colour PVC sheet inclusive of solvent cement and fixing at site on PVC frame as per specifications and drawings complete all as specified and directed. | 100 | Sqm | 1,430 ₹1,43,000 Lowest | 2,100 ₹2,10,000 | 1,850 ₹1,85,000 |
| 8.00 | Dismantling wall and ceiling boards (Fibre,pulp,insulation etc )of any thickness all as specified and directed. | 100 | Sqm | 20 ₹2,000 Lowest | 30 ₹3,000 | 45 ₹4,500 |
| 9.00 | Dismantling/taking out existing hessain base felt or any other existing water proofing treatment from roof including cement plaster and exposing the top surface of RCC slab including removing the dismantled debris to a distance exc 200m & n.exc 250m. all as specified and directed | 152 | Sqm | 35 ₹5,320 | 30 ₹4,560 Lowest | 80 ₹12,160 |
Tender Value
₹35.0 L
EMD Value
₹69,960
Closing Date
28 Aug 2025, 6:00 pmClosed
GE (SB) KARWAR
GARRISON ENGINEER (SEABIRD) KARWAR Naval Base, Sankrubagh (PO) Karwar - 581308
REPAIRS TO PVC EPOXY FLOORING INCLUDING WALL PANELLING PU TREATMENT AND CERTAIN MISCELLANEOUS WORK IN OTM ACCN MAGAZINES IN SITE E AND C AT NAVAL BASE KARWAR.
2025_MES_702617_2
8334/E8
Open Tender
Civil Works
Item Rate
330 days
GE (SB) KARWAR
AS PER NIT
8 documents required · 8 mandatory
₹500
GE (SB) KARWAR
₹69,960
Yes
27 Nov 2025
1 Aug 2025
30 Aug 2025
1 Aug 2025
28 Aug 2025
9 Aug 2025
1 Aug 2025 - 4 Aug 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .